Citation : 2022 Latest Caselaw 6437 MP
Judgement Date : 29 April, 2022
1 A.C.No.32/2021
HIGH COURT OF MADHYA PRADESH
BENCH AT GWALIOR
:SINGLE BENCH:
{HON'BLE SHRI JUSTICE ANAND PATHAK}
Arbitration Case No. 32/2021
M/s Om Sai RK Constructions Pvt. Ltd.
Vs.
M/s Forsight Infractech Pvt. Ltd.
-----------------------------------------------------------------------------------
Shri Harish Dixit, learned counsel for applicant.
Shri N.K.Gupta, learned Senior counsel with Shri Kamal Mangal
and Shri Chetan Kanungo, learned counsel for the respondent.
-----------------------------------------------------------------------------------
*************
ORDER
(Passed on 29th day of April, 2022)
Present application is preferred by applicant under Section
Section 11 (6) of the Arbitration and Conciliation Act, 1996
(hereinafter referred to as 'the Act') for appointment of arbitrator.
2. Reliefs prayed for are as under:-
"(i) Annulling appointment of arbitrator vide letter dated 24.12.2020 (Annexure A-4).
(ii) Appointing an impartial arbitrator to resolve claims of the applicant.
(iii). Any other relief which this Hon'ble Court finds appropriate in the matter.
(iv) Costs."
3. Precisely stated facts of the case are that applicant is a
company registered under Companies Act and filed this application
through its Director. Applicant is a construction company having
expertise in construction of high rise buildings and hereinafter would
be referred to as Subcontractor. Respondent is also a company
registered under Companies Act and represented through its Director
Ms. Upasana Agrawal. Respondent is also engaged in construction
work of high rise buildings and hereinafter would be referred to as
Contractor.
4. applicant/Subcontractor through its Director Rajesh Kumar
Kaushal entered into an agreement dated 2.3.2015 to construct
residential township "Emerald Greens" [Four Tower/Blocks
(Basement + Stilt + 8 Floors) as per design and planning, at village
Khureri near Badagaon Flyover, Gwalior.
5. As per agreement, respondent/contractor was liable for supply
of all the material, whereas applicant/subcontractor had to provide
labour, false work and petty material i.e. nail, binding wires etc.
Copy of agreement is enclosed as Annexure A-1. Contractor had
been awarded the contract of development and construction of
residential township "Emerald Greens" by the owner of the plot at
aforesaid location and subsequent to it, contractor executed
agreement with subcontractor assigning mainly labour part of the
construction work to the subcontractor.
6. As pleaded, subcontractor executed the work to the best
satisfaction of the contractor, its Engineers and also of the owner of
the land and satisfaction can be recorded from the fact that contractor
made payment to subcontractor of more than Rs. 5 Crores after due
measurements and verification of quantity and quality by its
Engineers. It appears that in respect of some further payment, when
asked for by the subcontractor, dispute emerged. It appears that in
response to demand of money by the subcontractor (applicant
herein), the contractor sent a letter dated 6.11.2020 vide annexure
A-3 to subcontractor, informing it about appointment of Shri Chetan
Kanungo (Advocate) as Arbitrator.
7. Surprised by the gesture of contractor, a legal notice dated
12.11.2020 at the instance of subcontractor vide Annexure A-4 was
sent in which demand of payment of due amount was reiterated.
8. Reacting to the said legal notice, contractor again issued a
letter dated 24.12.2020 vide Annexure A-5 sent by one Neeraj
Kumar Sharma as authorized representative of respondent/contractor
in which it has been informed that Shri Chetan Kanungo has
declined to act as Arbitrator and Shri Neeraj Kumar Sharma as
authorized representative appointed Shri M.L.Swarnakar (Advocate)
as Sole Arbitrator by exercising the powers under Clause 19 of the
agreement dated 2.3.2015. Immediately thereafter, Arbitrator Shri
M.L.Swarnakar sent letter dated 26.12.2020 (Annexure A-6) to
applicant/subcontractor informing him about his own acceptance as
Arbitrator and declaration as per the provision of Section 12 and the
Sixth Schedule of the Act was made. Interestingly, after acceptance
of appointment by nominated Arbitrator (Shri M.L.Swarnakar) by
contractor, reply to legal notice has been sent by the contractor vide
reply dated 28.12.2020 (Annexure A-7) in which demand of
payment of money as claimed by the applicant/subcontractor was
denied and advised to participate in arbitration proceedings before
Arbitrator already appointed.
9. In the first meeting held on 21.02.2021 with nominated Sole
Arbitrator, (Annexure A-8) subcontractor raised objection regarding
appointment of arbitrator without its consent and sought the
documents from respondent/contractor and also sought the statement
of claim made by respondent before the Arbitrator. It appears from
the proceedings dated 21.02.2021 that no document has been
submitted by the respondents/contractor. Matter was placed on
7.3.2021.
10. On 7.3.2021 (Annexure A-10), applicant informed the
nominated arbitrator as well as the representative of respondent that
appointment of arbitrator is contrary to law and therefore, applicant
does not intend to participate in the proceedings and wants to
approach the High Court for appointment of Arbitrator and therefore,
requested the arbitrator, not to commence the arbitration
proceedings.
11. It is the submission of learned counsel for the
applicant/subcontractor that respondent/contractor first appointed
Shri Chetan Kanungo as Arbitrator but later on one Neeraj Kumar
Sharma on behalf of respondent as authorized representative
appointed Shri M.L.Swarnakar as Sole Arbitrator and as per
agreement, Clause 19 of the Agreement dated 2.3.2015, Shri
Swarnakar did not choose to appoint an Umpire and started
proceedings which is an arbitrary exercise because applicant did not
submit to the jurisdiction of such nominated arbitrator and after
ascertaining that no other documents exists regarding appointment,
nomination by alleged authorized representative Shri Neeraj Kumar
Sharma that too, without consulting with the applicant, whole
exercise of appointment is bad in law.
12. It is further submitted that appointment of arbitrator is ex-facie
illegal/ invalid because it has been made much prior to arising of
dispute. After appointment of arbitrator on dated 24.12.2020,
contractor prelferred to file reply to legal notice dated 28.12.2020
(Annexure A-7), denying the claim of applicant. It means that on
28.12.2020 denial was made for payment and much prior to it on
24.12.2020 itself, arbitrator was nominated, that too by an
incompetent man purportedly appearing as authorized representative.
Substitution of arbitrator is not as per law and contractor is not
having any authority to authorize a stranger to appoint arbitrator as
per Section 12 (5) of the Act read with Article 13 with Seventh
Schedule in the Act. He has relied upon the judgments of the
Supreme Court in the cases of TRF Limited vs. Energo
Engineering Projects Limited., AIR 2017 SC 3889 and Perkins
Eastman Architects DPC & Others vs. HSCC (India) Limited,
reported in AIR 2020 SC 59 and submits that appointment of Shri
M.L.Swarnakar unilaterally by respondent through its power of
attorney is invalid and liable to be quashed.
13. It is further submitted that after execution of agreement dated
2.3.2015 with effect from 23.10.2015, Section 12 (5) of the Act came
into force with Seventh Schedule under the Act, rendering the Clause
19 of the agreement invalid because dispute arose in year 2020,
when appointment of arbitrator unilaterally by one party is held
invalid. While referring the power under Section 11 of the Act, it is
submitted that power can be exercised by this Court when Arbitrator
has already been appointed by respondent and referred the judgment
rendered in the case of Perkins Eastman Architects DPC (supra)
in this regard and referred paragraphs 21 to 25. He also referred
judgment of the Apex Court in the case of Walter Bau Ag, Legal
Successor, of the Original Contractor, Dyckerhoff And
Widmann Ag vs. Municipal Corporation of Greater Mumbai
And Another, 2015 (3) SCC 800.
14. While referring the judgment rendered in the case of Haryana
Space Application Centre and Others vs. Pan India Consultants
Pvt. Ltd., 2021 (3) SCC 103, it is the submission of learned counsel
for the applicant that the Court can set aside the "ineligible'
appointment of arbitrator and appoint impartial arbitrator for
adjudication. Learned counsel for the applicant fairly submitted that
he is ready to appear before any Arbitrator appointed by this Court
while referring the matter to M.P. High Court Arbitration Center,
Jabalpur. He would get fair and transparent dispute redressal
mechanism at Jabalpur.
15. Learned Senior counsel appearing on behalf of respondent
opposed the prayer and submitted that the application under Section
11 (6) of the Act is not maintainable because applicant did not issue
any notice invoking arbitration before filing this application 11 (6) of
the Act, therefore, same is not maintainable. He relied upon Bharat
Sanchar Nigam Limited and Others Vs. M/s Nortel Networks
India Pvt., 2021 (5) SCC 738. Since respondent has submitted to the
jurisdiction of arbitrator Shri M.L.Swarnkar, therefore, now he
cannot rescind from the said arbitration proceedings and seeks
another arbitration proceedings. Reliance is placed on the judgment
of the Supreme Court in the case of Eurobearings India Pvt. Ltd.
vs. Eurobearings R.I. Arbitration Petition, MANU/SC/1299/2021
and Pricol Limited vs. Johnson Controls Enterprise Limited And
Others, 2015 (4) SCC 177. It is further submitted that Section 11
(6A) inserted by the 2015 Amendment Act, confines the scope of
Section 11 (6) of the Act to the examination of the existence of an
arbitration agreement only and no judgment decree or order of the
Court would affect the appointment. Although, it is fairly submitted
that it has been omitted by the 2019 Amendment but according to
him, the said omission is yet to be notified, therefore, Section 11
(6A) of the Act continues to hold the field.
16. Learned Senior counsel for the respondent submitted that the
mention of the word 'Umpire' in the arbitration clause is due to
inadvertent error or typing mistake, and therefore it has no meaning
and it appears from the legal definition of the word "Umpire" that
the same is inserted erroneously and it is improbable that two
persons can be appointed in arbitral side.
17. According to respondent, Mr. Neeraj Kumar Sharma is
authorized signatory of respondent company being a juristic entity,
respondent company-M/s Foresight Infratech Private Limited could
not perform day to day functions itself, therefore, relied upon
authorized representative to carry out its and Mr. Neeraj Kumar
Sharma continues to act on behalf of respondent company without
authorization, therefore, plea regarding authorized representative
does not hold grounds. Since in the case in hand Mr. M.L.Swarnakar
appointed, therefore the judgment as relied upon by the applicant in
Walter Bau AG, Legal Successor (supra) is no avail.
18. On the basis of Sections 12, 13, 14 of the Act as considered by
the Supreme Court in the case of Bharat Broadband Network
Limited Vs. United Telecoms Ltd., 2019 (5) SCC 755 challenge
procedure is prescribed under Section 13 of the Act and that can only
be challenged when on justifiable doubts is arisen under sub-section
(3) of Section 12 subject to sub-section 4 of Section 12 of the Act.
Therefore, challenge procedure has not been adopted properly and
filed the application. He prayed for dismissal of the application.
19. Heard the learned counsel for the parties at length and perused
the documents appended thereto.
20. It is a case where applicant who was a subcontractor entered
into an agreement dated 02.03.2015 with respondent as contractor.
As per the agreement dated 02.03.2015, Clause 19 contains
arbitration clause. The same is reproduced for ready reference :-
"19. In case any dispute or difference arises between the parties whether in respect of work done or in respect of delay in completion of works or in respect of payment of extra work required to be done and so executed or in respect of measurement of work done or in respect of delay in payment to the subcontractor or touching the interpretation, fulfilment of any of the terms of these presents or any other matter arising out of or in connection with these presents or the carrying out of the work, shall be referred to arbitration to be appointed by Contractor. The arbitrator shall appoint an umpire before entering upon the reference. The award of the arbitrator or umpire shall be final and binding on the parties and the parties, their executors and administrators shall on their respective parts obey, abide by the award and shall not challenge on any ground excepting fraud or collusion or error apparent on the face of the award. It is hereby agreed between the parties that the parties shall resort to arbitration, before filing any suit for the enforcement of any legal right under these presents."
21. Perusal of Clause 19 indicates that dispute arises then matter
can be referred to arbitration to be appointed by a contractor and
arbitrator had to appoint an umpire before entering upon the
reference, meaning thereby that appointment of Arbitrator and
Umpire is in the discretion of contractor (respondent herein). The
same is hit by Section 12 (5) of the Act as inserted by amendment
with effect from 23.10.2015. The same reads as under:-
12. Grounds for challenge :
"(1) xxx xxx xxx
(2) xxx xxx xxx
(3) xxx xxx xxx
(4) xxx xxx xxx
(5) Notwithstanding any prior agreement to the contrary, any person whose relationship, with the parties or counsel or the subject-matter of the dispute, falls under any of the categories specified in the Seventh Schedule shall be ineligible to be appointed as an arbitrator.
Provided that parties may, subsequent to disputes having arisen between them, waive the applicability of this sub-section by an express agreement in writing.
22. Seventh Scheduled of the Act prescribes Arbitrator's
relationship with the parties or counsel in which Clause 13 indicates
that if the arbitrator has a significant financial interest in one of the
parties or the outcome of the case, then ineligibility attracts.
23. Therefore, The said practice has been deprecated by the Apex
Court in the case of TRF Limited (supra) and later on in the case of
Perkins Eastman Architects DPC (supra). Since Arbitration
Clause 19 in agreement empowers non-applicant to unilaterally
appoint arbitrator and dispute arisen in the year 2020 and by that
time appointment of arbitrator by one party unilaterally is held
invalid, therefore, appointment of arbitrator by power of attorney
holder Shri Neeraj Sharma through letter dated 24.12.2020, appears
to be contrary to law.
24. This fact can further be seen in the light of the fact that earlier
contractor/respondent appointed one Advocate as arbitrator who was
also the counsel for contractor/respondent and therefore, this fact
strengthened the apprehension of applicant about the approach of
respondent and same has been taken care of by legislature also by
incorporating Section 12 (5) of the Act 1996.
25. In the case in hand, arbitrator has been appointed by the
respondent but at the same time, applicant raised this dispute before
arbitrator also and therefore, power under Section 11 of the Act can
be exercised in such situation because of the guidance given by the
Apex Court in the case of Perkins Eastman Architects DPC
(supra) wherein it has been held that:-
"21. The further question that arises is whether the power can be exercised by this Court under Section 11 of the Act when the appointment of an arbitrator has already been made by the Respondent and whether the Appellant should be left to raise challenge at an appropriate stage in terms of remedies available in law. Similar controversy was gone into by a Designated Judge of this Court in Walter Bau AG Manu/SC/0053/2015 (2015) 3 SCC 800 and the discussion on the point was as under:-
"9. While it is correct that in Antrix MANU/SC/0514/2013 : (2014) 11 SCC 560 and Pricol Ltd. MANU/SC/1165/2014 : (2015) 4 SCC 177, it was opined by this
Court that after appointment of an arbitrator is made, the remedy of the aggrieved party is not under Section 11 (6) but such remedy lies elsewhere and under different provisions of the Arbitration Act (Sections 12 and 13), the context in which the aforesaid view was expressed cannot be lost sight of. In Antrix MANU/SC/0514/2013 : (2014) 11 SCC 560, appointment of the arbitrator, as per the ICC Rules, was as per the alternative procedure agreed upon, whereas in Pricol Ltd. MANU/SC/1165 / 2014 : (2015) 4 SCC 177, the party which had filed the application under Section 11 (6) of the Arbitration Act had already submitted to the jurisdiction of the arbitrator. In the present case, the situation is otherwise.
10. Unless the appointment of the arbitrator is ex facie valid and such appointment satisfies the Court exercising jurisdiction under Section 11 (6) of the Arbitration Act, acceptance of such appointment as a fait accompli to debar the jurisdiction under Section 11 (6) cannot be countenanced in law. In the present case, the agreed upon procedure between the parties contemplated the appointment of the arbitrator by the second party within 30 days of receipt of a notice from the first party. While the decision in Datar Switchgears Ltd.
MANU/SC/0651/2000 : (2000) 8 SCC 151 may have introduced some flexibility in the time frame agreed upon by the parties by extending it till a point of time anterior to the filing of the application under Section 11 (6) of the Arbitration Act, it cannot be lost sight of that in the present case the appointment of Shri Justice A.D. Mane is clearly contrary to the provisions of the Rules governing the appointment of arbitrators by ICADR, which the parties had agreed to abide by in the matter of such appointment. The option given to the respondent Corporation to go beyond the panel submitted by ICADR and to appoint any person of its choice was clearly not in the contemplation of the parties. If that be so, obviously, the appointment of Shri Justice A.D. Mane is non est in law. Such an appointment, therefore, will not inhibit the exercise of jurisdiction by this Court under Section 11 (6) of the Arbitration Act. It cannot, therefore, be held that the present proceeding is not maintainable in law. The appointment of Shri Justice A.D. Mane made beyond 30 days of the receipt of notice by the applicant, though may appear to be in conformity with the law laid down in Datar Switchgears Ltd.
MANU/SC/0651/2000 : (2000) 8 SCC
151., is clearly contrary to the agreed procedure which required the
appointment made by the respondent Corporation to be from the panel submitted by ICADR. The said appointment, therefore, is clearly invalid in law."
22. It may be noted here that the aforesaid view of the Designated Judge in Walter Bau AG MANU/SC/0053/2015 : (2015) 3 SCC 800 was pressed into service on behalf of the appellant in TRF Limited MANU/SC/0053/2015 : (2015) 3 SCC 377 and the opinion expressed by the Designated Judge was found to be in consonance with the binding authorities of this Court. It was observed:-
"32. Mr Sundaram, learned Senior Counsel for the appellant has also drawn inspiration from the judgment passed by the Designated Judge of this Court in Walter Bau AG MANU/SC/0053/2015 : (2015) 3 SCC 800, where the learned Judge, after referring to Antrix Corpn. Ltd., distinguished the same and also distinguished the authority in Pricol Ltd. v. Johnson Controls Enterprise Ltd. MANU/SC/1165/2014 : (2015) 4 SCC 177 and came to hold that: (Walter Bau AG case MANU/SC/0053/2015 : (2015) 3 SCC 800 SCC p. 806,para 10) "10. Unless the appointment of the arbitrator is ex facie valid and such appointment satisfies the Court exercising jurisdiction under Section 11 (6) of the Arbitration Act,
acceptance of such appointment as a fait accompli to debar the jurisdiction under Section 11 (6) cannot be countenanced in law. ..."
33. We may immediately state that the opinion expressed in the aforesaid case is in consonance with the binding authorities we have referred to hereinbefore."
23. In TRF Limited MANU/SC/0755/2017 :
(2017) 8 SCC 377, the Managing Director of the respondent had nominated a former Judge of this Court as sole arbitrator in terms of aforesaid Clause 33 (d), after which the appellant had preferred an application under Section 11 (5) read with Section 11(6) of the Act. The plea was rejected by the High Court and the appeal therefrom on the issue whether the Managing Director could nominate an arbitrator was decided in favour of the appellant as stated hereinabove. As regards the issue about fresh appointment, this Court remanded the matter to the High Court for fresh consideration as is discernible from para 55 of the Judgment. In the light of these authorities there is no hindrance in entertaining the instant application preferred by the Applicants.
24. It is also clear from the Clause in the instant case that no special qualifications such as expertise in any technical field are required of an arbitrator. This was fairly accepted by the learned Senior Counsel for the respondent.
25. In the aforesaid circumstances, in our view a case is made out to entertain the instant
application preferred by the Applicants. We, therefore, accept the application, annul the effect of the letter dated 30.07.2019 issued by the respondent and of the appointment of the arbitrator. In exercise of the power conferred by Section 11 (6) of the Act, we appoint Dr. Justice A.K. Sikri, former Judge of this Court as the sole arbitrator to decide all the disputes arising out of the Agreement dated 22.05.2017, between the parties, subject to the mandatory declaration made under the amended Section 12 of the Act with respect to independence and impartiality and the ability to devote sufficient time to complete the arbitration within the period as per Section 29 A of the Act. A copy of the Order be dispatched to Dr. Justice A. K. Sikri at 144, Sundar Nagar, New Delhi - 110003 (Tel. No. 011 - 41802321). The arbitrator shall be entitled to charge fees in terms of the Fourth Schedule to the Act. The fees and other expenses shall be shared by the parties equally."
and in the case of Walter Bau Ag (supra), it has been held
that unless an appointment of arbitrator is ex facie valid, it does not
debar the jurisdiction of Court in Section 11 of of the Act in
appointing arbitrator. Incidentally, agreement contains Clause 19
regarding two tier arbitration mechanism where arbitrator can
appoint the Umpire, therefore on the one hand Shri Neeraj Kumar
Sharma while appointing Shri M.L.Swarnkar curtailed the possibility
of participation of applicant in the process of appointment of Umpire
ignoring the position that he himself was not contractor but appears
to be power of attorney holder on behalf of contractor. If a particular
manner is prescribed to do anything that should be done in that
manner and not otherwise. Authority of Neeraj Kumar Sharma to
appoint arbitrator is itself in doubt because in absence of any Board
Resolution dated 01.12.2020 (not placed on record), it cannot be
inferred that said person was authorized to operate the agreement as
per the law on behalf of contractor. Therefore, on this count also,
case of the applicant gains grounds.
26. Once the appointment of arbitrator is void ab initio in view of
the guidance given by the Apex Court as referred above then in case
arbitrator is ineligible by virtue of Section 12 (5) of the Act, then
procedure prescribed under Sections 12, 13 and 14 are not applicable
being void ab initio. In Bharat Broadband Network Limited
(supra) guidance given by the Apex Court which are as follows :-
"17. The scheme of Sections 12, 13, and 14, therefore, is that where an arbitrator makes a disclosure in writing which is likely to give justifiable doubts as to his independence or impartiality, the appointment of such arbitrator may be challenged under Sections 12 (1) to 12 (4) read with Section 13. However, where such person becomes "ineligible" to be appointed as an arbitrator, there is no question of challenge to such arbitrator, before such arbitrator. In such a case, i.e., a case which falls under Section 12 (5), Section 14 (1) (a) of the Act gets attracted inasmuch as the arbitrator becomes, as a matter of law (i.e., de jure), unable to perform his
functions under Section 12 (5), being ineligible to be appointed as an arbitrator. This being so, his mandate automatically terminates, and he shall then be substituted by another arbitrator under Section 14 (1) itself. It is only if a controversy occurs concerning whether he has become de jure unable to perform his functions as such, that a party has to apply to the Court to decide on the termination of the mandate, unless otherwise agreed by the parties. Thus, in all Section 12 (5) cases, there is no challenge procedure to be availed of. If an arbitrator continues as such, being de jure unable to perform his functions, as he falls within any of the categories mentioned in Section 12 (5), read with the Seventh Schedule, a party may apply to the Court, which will then decide on whether his mandate has terminated.
Questions which may typically arise under Section 14 may be as to whether such person falls within any of the categories mentioned in the Seventh Schedule, or whether there is a waiver as provided in the proviso to Section 12 (5) of the Act. As a matter of law, it is important to note that the proviso to Section 12 (5) must be contrasted with Section 4 of the Act. Section 4 deals with cases of deemed waiver by conduct; whereas the proviso to Section 12 (5) deals with waiver by express agreement in writing between the parties only if made subsequent to disputes having arisen between them.
18. On the facts of the present case, it is clear that the Managing Director of the appellant could not have acted as an arbitrator himself, being
rendered ineligible to act as arbitrator under Item 5 of the Seventh Schedule, which reads as under:
Arbitrator's relationship with the parties or counsel
xxx xxx xxx
5. The arbitrator is a manager, director or part of the management, or has a similar controlling influence, in an affiliate of one of the parties if the affiliate is directly involved in the matters in dispute in the arbitration.
Whether such ineligible person could himself appoint another arbitrator was only made clear by this Court's judgment in TRF Ltd. (supra) on 03.07.2017, this Court holding that an appointment made by an ineligible person is itself void ab initio. Thus, it was only on 03.07.2017, that it became clear beyond doubt that the appointment of Shri Khan would be void ab initio. Since such appointment goes to "eligibility", i.e., to the root of the matter, it is obvious that Shri Khan's appointment would be void. There is no doubt in this case that disputes arose only after the introduction of Section 12 (5) into the statute book, and Shri Khan was appointed long after 23.10.2015. The judgment in TRF Ltd. (supra) nowhere states that it will apply only prospectively, i.e., the appointments that have been made of persons such as Shri Khan would be valid if made before the date of the judgment. Section 26 of the Amendment Act, 2015 makes it clear that the Amendment Act, 2015 shall apply in relation to arbitral proceedings commenced on or after 23.10.2015. Indeed, the judgment itself set
aside the order appointing the arbitrator, which was an order dated 27.01.2016, by which the Managing Director of the respondent nominated a former Judge of this Court as sole arbitrator in terms of clause 33 (d) of the Purchase Order dated 10.05.2014. It will be noticed that the facts in the present case are somewhat similar. The APO itself is of the year 2014, whereas the appointment by the Managing Director is after the Amendment Act, 2015, just as in the case of TRF Ltd. (supra). Considering that the appointment in the case of TRF Ltd. (supra) of a retired Judge of this Court was set aside as being non-est in law, the appointment of Shri Khan in the present case must follow suit.
27. Since the appointment of arbitrator at the instance of
contractor is contrary to law and therefore, ineligible appointment
deserves to be set aside and it can be removed at stage of passing of
award (See : Haryana Space Application Centre and Others Vs.
Pan India Consultants Pvt. Ltd., 2021 (3) SCC 103) and
contention of the respondent is that applicant submitted the
jurisdiction of the arbitrator is misplaced because applicant did not
submit to jurisdiction of arbitrator and in fact informed the arbitrator
about unilateral and invalid appointment process and proceedings
were void ab initio.
28. In cumulatively case of the applicant succeeds and
appointment of arbitrator at the instances of respondent/contractor
hereby set aside and resultantly appointment and all proceedings
undertaken by arbitrator is hereby set aside.
29. However, on earlier occasion applicant suggested for reference
to High Court Arbitration Center, Jabalpur and respondent counsel
did not raise any objection in this regard and alternatively agreed so.
Therefore, parties are directed to approach the High Court
Arbitration Center, Jabalpur wherein proceedings shall be
undertaken in accordance with rules so prescribed including the
appointment of arbitrator and other incidental matters like
procedure/etc.
30. Petition stands allowed. Appointment of arbitrator at the
instance of respondent is set aside with a direction to proceed in
accordance with law before High Court Arbitration Center, Jabalpur.
(Anand Pathak) Judge AK/-
ANAND KUMAR 2022.04.29 15:49:29 +05'30'
Publish Your Article
Campus Ambassador
Media Partner
Campus Buzz
LatestLaws.com presents: Lexidem Offline Internship Program, 2026
LatestLaws.com presents 'Lexidem Online Internship, 2026', Apply Now!