Union Of India vs Sitaram Sahu
2025 Latest Caselaw 554 Jhar

Citation : 2025 Latest Caselaw 554 Jhar
Judgement Date : 4 July, 2025

Jharkhand High Court

Union Of India vs Sitaram Sahu on 4 July, 2025

Author: Anubha Rawat Choudhary
Bench: Anubha Rawat Choudhary
                                                           2025:JHHC:17841




            IN THE HIGH COURT OF JHARKHAND AT RANCHI
                          F.A. No. 140 of 2016
       Union of India, through the Chief Revenue Officer, CCL, Darbhanga
       House, Ranchi, P.O.- G.P.O., P.S.- Kotwali, District- Ranchi
       (Jharkhand) through its General Manger (Admn.) Sri Gopal Prasad
       S/o Late Basudeo Prasad, R/o Jawahar Nagar, P.S.- Gonda, P.O.-
       Kanke, District- Ranchi (Jharkhand) ...     ...     Appellant

                                 -Versus-

       1. Sitaram Sahu, son of Sri Basu Sahu;
       2. Satyanarayan Prasad Gupta, son of Sri Kanchan Prasad Sahu;
       Both residents of Village- Bishrampur, P.O. & P.S.- Khelari, District-
       Ranchi (Jharkhand).                    ...        ...      Respondents
                                 ---
  CORAM: HON'BLE MRS. JUSTICE ANUBHA RAWAT CHOUDHARY
                                 ---
             For the Appellant : Mrs. Swati Shalini, Advocate
             For the Respondents : Mr. Arbind Kr. Sinha, Advocate
                                 : Mr. Akhouri Prakhar Sinha, Advocate
                                 : Mr. Baban Prasad, Advocate
                                 : Mr. Aniket Rohan, Advocate
                                       ---
                                              Lastly heard on 06.05.2025
24/04.07.2025
       1.     This First Appeal has been filed against the Judgment dated
       30.11.2015 passed by learned AJC-I Cum P.O.-Tribunal under CB
       Act, Ranchi in Reference Case No.13 of 2001 whereby the learned
       Tribunal has allowed the application filed by the respondents under
       Section 17(2) of the Coal Bearing Areas (Acquisition and
       Development) Act, 1957 and enhanced the rate of compensation to
       Rs.1,000/- per decimal and directed the appellant to pay the same
       along with interest at the rate of 5% per annum.
       2.     The present appeal arises out of Reference Case No.13 of 2001.
       The matter arises out of acquisition of land by the appellant- CCL of
       the total area 12.02 acres. The notification under Section 9 of Coal
       Bearing    Areas    (Acquisition     and   Development)   Act,   1957
       (hereinafter referred to as "Coal Bearing Act") was issued on
       29.12.1976.
       3.     As per the petition filed by Sitaram Sahu, son of Basu Sahu and
       Satyanarayan Prasad Gupta, son of Kanchan Prasad Sahu before the

                                            1
                                                             2025:JHHC:17841




     learned Tribunal, Ranchi under Section 17(2) of Coal Bearing Act, the
     two claimants have stated that the land of 12.02 acres was acquired
     jointly in the name of Ram Chander Sahu and Laldeo Sahu and the
     claimants are the descendants of Late Laldeo Sahu. Consequently,
     they were concerned only with 6.01 acres of land which was half share
     of the total acquired land.
     4.    It was the case of the claimants that the appellant i.e. CCL had
     fixed the compensation at Rs.21,431/- for the land to the extent of 6.01
     acres which was paid to them vide two cheques dated 23.03.2001 and
     30.04.2001. Thereafter, within a short time, they filed the petition
     under Section 17(2) of the Coal Bearing Act on 30.05.2001. It was
     their case that the CCL offered very low compensation and the
     compensation was not in accordance with the market rate of the
     property. As per the claimants, the market value should have been
     Rs.15 lakhs as the property is situated in industrial belt such as North
     Karnpura Coalfields. It was also their case that similar acquisitions
     have been done in the vicinity for Tuwang Colliery, Bachra Colliery
     and Piparwar project wherein the Courts have fixed compensation @
     Rs.90,000/- to Rs.1 lakh per acre. It was their further case that in terms
     of the circular dated 12.05.1989, the claimants are also entitled to
     receive solatium and higher rate of interest. The petition was filed
     seeking enhancement of compensation and also for payment of
     solatium @ 30% and higher rate of interest @ 15% from the date of
     acquisition of land.
A.   Reference to cross objection i.e., C.O. No. 5 of 2016
     5.    At this, learned counsel for the respondents has submitted that
     they have filed a cross-objection to the present First Appeal which was
     numbered as C.O. No. 5 of 2016. He submitted that said Cross
     Objection has been dismissed for non-compliance of peremptory order
     dated 20.04.2018 as the defects pointed out by the Office were not
     cured. The learned counsel for the respondents has submitted that they
     are taking steps to do the needful with respect to the Cross Objection.




                                         2
                                                         2025:JHHC:17841




6.     However, the fact remains that till date no application for
restoration of the aforesaid Cross Objection being C.O. No. 5 of 2016
has been filed.
7.     Learned counsel for the respondents has also submitted that
Cross Objection having been dismissed for non-removal of defects,
still it is open to the respondents to raise the plea in the present
proceedings with regard to claim of solatium and enhanced interest
irrespective of any Cross Objection having been filed and dismissed
for non-removal of defects. The learned counsel has submitted that the
respondents - claimants are entitled to amount of solatium and interest
to the extent of 30% and 15% respectively from the date of acquisition
of land.
8.     To this, learned counsel for the appellant has raised serious
objection and has submitted that once the Cross Objection has been
dismissed for default and the respondents have themselves submitted
that they are taking steps for restoration of the Cross Objection,
therefore, such issue may not be decided in the present appeal. If the
Cross Objection is ultimately restored to its original file, then certainly
appropriate order can be passed in the Cross Objection. She has
submitted that the legal recourse to claim solatium and enhanced
interest, as argued by the respondents, is still available.
9.     Learned counsel for the respondents has relied upon the
judgment passed by the Hon'ble Supreme Court reported in AIR 1999
SC 3571 (Ravinder Kumar Sharma Vs. State of Assam and others)
(paragraphs 22 and 23) to submit that it has been held by the Hon'ble
Supreme Court that respondent - defendant, in an appeal can, without
filing cross-objection, attack an adverse finding upon which a decree
in part has been passed against the respondent - defendant for the
purpose of sustaining the decree to the extent the tribunal had
dismissed the suit. It has also been held by the Hon'ble Supreme Court
that filing of Cross Objection after 1976 amendment in Civil
Procedure Code is purely optional and not mandatory. Paragraphs 22
and 23 of the aforesaid judgment are quoted as under:


                                     3
                                                              2025:JHHC:17841




             "22. A similar view was expressed by U.N. Bachawat, J.

in Tej Kumar Jain v. Purshottam [AIR 1981 MP 55] that after the 1976 Amendment, it was not obligatory to file cross-objection against an adverse finding. The explanation merely empowered the respondent to file cross-objections.

23. In our view, the opinion expressed by Mookerjee, J. of the Calcutta High Court on behalf of the Division Bench in Nishambhu Jena case [(1984-85) 86 CWN 685] and the view expressed by U.N. Bachawat, J. in Tej Kumar case [AIR 1981 MP 55] in the Madhya Pradesh High Court reflect the correct legal position after the 1976 Amendment. We hold that the respondent-defendant in an appeal can, without filing cross-objections attack an adverse finding upon which a decree in part has been passed against the respondent, for the purpose of sustaining the decree to the extent the lower court had dismissed the suit against the defendant-respondent. The filing of cross-objection, after the 1976 Amendment is purely optional and not mandatory. In other words, the law as stated in Venkata Rao case [AIR 1943 Mad 698: ILR 1944 Mad 147 (FB)] by the Madras Full Bench and Chandre Prabhuji case [Sri Chandre Prabhuji Jain Temple v. Harikrishna, (1973) 2 SCC 665:

AIR 1973 SC 2565] by this Court is merely clarified by the 1976 Amendment and there is no change in the law after the amendment."

10. In response to the submissions regarding cross-objection, the learned counsel for the appellant submitted that filing of Cross Objection may be optional and not mandatory, but once it is filed and is dismissed for default, then under such circumstances, the relief, as was prayed for through Cross Objection, cannot be granted in this proceeding and for that purpose, the respondents ought to have taken appropriate steps for restoration of Cross Objection.

B. Arguments on merit of the case regarding rate of compensation Arguments on behalf of the appellant

11. Learned counsel for the appellant referred to the evidence of Sitaram Sahu who was examined as applicant Witness No.1 and submitted that it has come in his evidence that he had not protested to the compensation amount while receiving the same and that he primarily deposed regarding the present status of the acquired land that it has school, college, etc. in the vicinity of the acquired land. She

2025:JHHC:17841

further referred to the deposition of applicant Witness No.2 namely, Satyanarayan Prasad Gupta and submitted that though he has stated that he had received the compensation under protest, but has simply stated that the acquired land was 5 Kms away from the cement factory. The learned counsel also submitted that in the evidence, the applicant Witness No.2 has stated that for acquisition of Bachra Colliery, compensation was given @ Rs. 1 lakh per acre and the same is the basis for filing the compensation case seeking enhancement of compensation.

12. Altogether two witnesses were examined from the side of CCL. While referring to the evidence of O.P. Witness No.1 examined on behalf of CCL, the learned counsel for the appellant submitted that it is not in dispute that the acquired land falls under village Bishrampur and notification under Section 4 of Coal Bearing Act was issued on 21.04.1975. She submitted that this witness has clearly stated that at the time of acquisition of land, the relevant survey was also done to find out as to the nature of the land/plots and different sale-deeds were also considered for fixation of compensation. At that point of time, the interest, solatium etc., were not payable. She further submitted that the said witness has deposed that the acquired land did not fall in industrial area and that the land is far away from other collieries like Hendegir and Bachra collieries. As per this witness, the acquired land cannot be compared with the land of the aforesaid collieries. The aforesaid witness has also stated in his examination-in- chief that the nature of land is different and, in those lands, the collieries were established after the acquisition of land involved in the present case. He has also deposed that at the time of acquisition, the village Bishrampur involved in this case was in absolute rural location and there was no sign of any development.

13. The learned counsel also placed the cross-examination of the aforesaid witness. During cross-examination, O.P. Witness No.1 has deposed that Bachra Colliery was established prior to 1973 and Bishrampur is 12 Kms away from Bachra Colliery and there is a pitch road adjoining to the village Bishrampur which goes to Ranchi. He

2025:JHHC:17841

has also stated in his cross-examination that the collieries namely, Bachra, Churi, Kedi, Ray, Tumang, Manki and Karkata fall under North Chandrapura Coalfields and they were all private coalfields which were nationalized in the year 1973. He has further deposed during cross-examination that there are collieries around Bishrampur village which are around 7 to 8 Kms away and declaration under Section 9 with respect to Bishrampur was made in the year 1976. As per this witness, he did not participate at the time of preparation of award. He has deposed that the valuation was done on the basis of sale-deeds, but could not disclose as to which sale-deeds were taken into consideration. He has further deposed that the Revenue Department of CCL undertakes the valuation of the property. He has further deposed that in the year 1989, a circular has been issued by the Central Government stating that for acquisition under Coal Bearing Act, 30% solatium and 15% interest is payable. He has further deposed that the land in Bishrampur was acquired for K.D. colliery and K.D. colliery falls under Hesalang Project and in K.D. colliery, urban facilities are available. He has denied that the work in K.D. colliery commenced prior to 1973. He has also denied that K.D. colliery was nationalized in the year 1973.

14. Learned counsel for the appellant has submitted that so far as O.P. Witness No.2 examined on behalf of the appellant- CCL is concerned, he has also deposed in similar lines and he has clearly stated that notification under Section 4 was issued on 21.04.1975, the notification under Section 7 was issued on 27.01.1976 and notification under Section 9 was issued on 29.12.1976 and these documents were marked exhibits as Exhibit- A, B and C respectively.

15. The learned counsel for the appellant further submitted that the aforesaid witness has exhibited a document which has been marked as Exhibit-D which is the statement of land (classification of land) of village Bishrampur prepared by one Sharda Prasad who was the Revenue Officer of CCL. During his cross-examination, O.P. Witness No.2 has stated that the statement was not prepared in his presence and Khelari is around 3 Kms away from Bishrampur. He has further

2025:JHHC:17841

deposed that in Bishrampur, there is everything like trees, market, quarters, station, etc.

16. Learned counsel for the appellant, while referring to the evidence of O.P. Witness No.2, submitted that this witness has exhibited the document (Exhibit-D) showing the manner in which the compensation was quantified at the relevant point of time way back in the year 1976.

17. The learned counsel for the appellant further submitted that since claimants had raised a grievance with regard to quantum of compensation, still it was for the claimants to produce the documents in support of their claim and the onus was heavy on them which they failed to discharge. The learned counsel submitted that the impugned judgment has been passed on the basis of Exhibit-1 which is a judgment in relation to Bachra Colliery for which the land was acquired way back in the year 1965. She submitted that the judgment as such could not have been taken into consideration for quantifying the compensation in the present case and admittedly, Bachra colliery was around 12 Kms away from Bishrampur village. The learned counsel also relied upon the order-sheet of the compensation case and submitted that the order-sheet is accompanied with the compensation chart. The compensation chart gives the classification of different categories of land and the rate has also been mentioned therein. The learned counsel submitted that during the evidence, the witnesses on behalf of CCL have stated that compensation was prepared on the basis of sale-deeds, but there is no cross-examination. Learned counsel for the appellant also submitted that even the computation with respect to different categories of land has been given.

18. Learned counsel for the appellant referred to following judgments:

(i) 2022 0 Supreme (SC) 351 (Ramrao Shankar Tapase Vs. Maharashtra Industrial Development Corporation and others) (paragraphs 13, 13.1 and 13.2)

(ii) (2018) 13 SCC 96 (Manoj Kumar and others Vs. State of Haryana and others) (paragraphs 12 to 16)

2025:JHHC:17841

(iii) Judgement passed in F.A. No. 40 of 2007 decided on 10.01.2023 reported in 2023 SCC OnLine Jhar 15 (Ajay Kumar Singh and others Vs. State of Bihar/State of Jharkhand)

(iv) (2013) 14 SCC 50 (Ramanlal Deochand Shah Vs. State of Maharashtra) (paragraphs 9 and 10)

(v) (1998) 8 SCC 136 (Kanwar Singh and others Vs. Union of India) (paragraphs 8 and 9)

(vi) Judgment passed in M.A. No. 502 of 1991(R) decided on 14.09.2018 (Karmi Devi and others Vs. Union of India) (paragraphs 24, 25, 27, 35, 36 and 37)

Arguments on behalf of the Respondents (claimants)

19. Learned counsel for the respondents submitted that though the witnesses of CCL have stated that the compensation was fixed on the basis of sale-deeds, but the materials produced before the learned Tribunal did not include any sale-deed. He further submitted that there is no reference of any of the sale-deeds in any of the documents exhibited on behalf of the CCL. The learned counsel further submitted that in order to assess market value of compensation, the sale-deed was required to be produced by the CCL as the same was required to be compared with respect to the acquired land, both in respect of time and in respect of area and the location involved in the case. In absence of sale-deed being produced or being referred to in the documents, it appears that the compensation has been fixed without any basis whatsoever.

20. The learned counsel for the respondents referred to Exhibit-1 which was in connection with village Bachra and admittedly, the land in the said case was acquired by issuance of notification under Section 4 which was dated 23.12.1965. The learned counsel submitted that the distance of village Bishrampur from Bachra as per the evidence of the witnesses is around 12 Kms and around 7 to 8 Kms from other collieries. He submitted that considering the time of acquisition and the location, Exhibit-1 was the closest amongst all and in absence of any sale-deed having been exhibited on behalf of CCL, the learned Tribunal has rightly taken Exhibit-1 into consideration for the purpose of quantification of compensation. The learned counsel submitted that

2025:JHHC:17841

once the Exhibit-1 was produced, the claimants had discharged their onus in the best possible manner they could have and therefore, the onus shifted upon the CCL to prove that the compensation was fixed by taking into consideration other sale-deeds which were closer and proximate and were relating to similar nature of land as compared to that of the acquired land.

21. Learned counsel for the respondents also relied upon Exhibit- 1/A and submitted that in the said judgment passed by this Court, it has been observed that the previous judgment must be relied upon, but attending circumstances should also be considered. The said judgment is in relation to the lands acquired in the year 1986-87 with respect to the village Tuwang, P.S. Khelari, District- Ranchi.

22. Learned counsel for the respondents also referred to Exhibit- 1/B which is an order passed in relation to lands acquired vide notification of the year 1986 and this order is also relating to village Tuwang, P.S. Khelari, District- Ranchi. The learned counsel submitted that the land involved in Exhibit-1 was closest to that of the acquired land and vide Exhibit-2, the rate was fixed as it stood in the year 1965 and in the present case, the acquisition has taken place around 10 years after the acquisition of the land involved in Exhibit-1. The Exhibit-1 was much prior in point of time and the claimants have not gained any additional advantage.

23. Learned counsel for the respondents, with respect to the claim of solatium and interest, referred to the judgment passed by the Hon'ble Patna High Court reported in AIR 1998 Patna 100 (Union of India Vs. Kashinath Mahto) and submitted that in the said case also, the acquisition was relating to the period prior to issuance of notification by the Union of India in the year 1989 and in the said case, solatium to the extent of 30% and interest @ 9% for the first year and 15% for subsequent years has been granted. The learned counsel submitted that in the present case, no amount has been awarded relating to interest and solatium.

24. Learned counsel for the respondents relied upon the following judgments:

2025:JHHC:17841

(i) AIR 1998 Patna 100 (Union of India Vs. Kashinath Mahto) (paragraphs 11 and 15)

(ii) (1991) 4 SCC 212 (Narain Das Jain by Lrs. Vs. Agra Nagar Mahapalika, Agra)

(iii) (2008) 14 SCC 745 (General Manager, Oil and Natural Gas Corporation Limited Vs. Rameshbhai Jivanbhai Patel)

(iv) AIR 1988 SC 1652 (Chimanlal Hargovinddas Vs. Special Land Acquisition Officer).

Findings of this Court

25. After hearing the learned counsel for the parties and going through the records of the case, this Court finds that the lands of the claimants/respondents measuring a total area of 6.01 acres in several plots under Khata No.22, Village- Bishrampur, P.S.- Khelari, District- Ranchi were acquired by the appellant-CCL vide Notification dated 29.12.1976 issued under Section 9(1) of Coal Bearing Act for Hesalong Project (Colliery). The award was originally prepared in the name of Bishun Dayal and after his death, the names of the claimants- respondents were substituted. Appellant-CCL had fixed the compensation at Rs.21,431/- against 6.01 acres of lands of the claimants which was paid to them through two cheques dated 23.03.2001 and 30.04.2001. Thereafter, on 30.05.2001, the claimants- respondents filed a petition under Section 17(2) of the Coal Bearing Act for enhancement of the compensation and also for solatium @ 30% and higher interest @ 15% from the date of acquisition, which was registered as Reference Case No.13 of 2001.

26. This Court further finds that although the acquisition is of the year 1976, but the petition was filed in the year 2001 and further, the claimants received the amount through their bank account on 23.03.2001 and 30.04.2001. The compensation was fixed at Rs.21,431/- for the acquired land total being 6.01 acres. It was stated in the petition that the claimants had approached the opposite party vide an application 26.07.1978 to refer the matter to the tribunal for fixation of market value of the acquired land. So far as the rate of compensation is concerned, it was their specific case that the market value should be Rs.15 lakhs as the property is situated in industrial

2025:JHHC:17841

belt, such as North Karnpura Coalfields. It was also stated by the claimants that there were other collieries running before nationalization of the coalmines in the year 1973, such as Rai, Churi, Dakra, Manki, Karkata, Tuwang, Hendegir, Bachra and Hesalong. It was also their case that all the collieries are in a block including Bishrampur and there are all facilities like staff quarters, market, hospital, pitch road and G.M. Office in village Bishrampur where the acquired land is located. It was also asserted in Paragraph 12 of the petition that similar acquisitions have been done in the vicinity for Tuwang colliery, Bachra colliery and Piparwar Project and the courts including tribunal had fixed compensation of Rs.90,000/- to Rs. 1 lakh per acre.

27. A reply was also filed by the opposite parties- CCL and a specific stand was taken that the land acquired was surveyed and classified and after considering the sale figure for such land on the date of notification of land acquisition under Section 4 of the Coal Bearing Act and keeping in view the provision of Coal Bearing Act, compensation was fixed and paid to the claimants. Further, a specific stand was taken that on the date of notification under Section 4, the collieries and other developments stated in the petition of the claimants were not in existence. It was also stated that it was not clear whether the claimants received compensation under protest and it was for the claimants to prove the same. It was further their stand that the claimants are required to prove the cost of land, as mentioned in their petition, by production of sale-deeds in respect of the similarly situated lands on the date of notification under section 4 of the Coal Bearing Act.

28. The claimants examined two witnesses in support of their claims. CW-1 is Sitaram Sahu and CW-2 is Satyanarayan Prasad Gupta. CW-1 in his examination-in-chief deposed that CCL has acquired his 6.01 acres of land for excavation of coal and he has been given compensation of Rs.21,431/-, but the compensation has not been given at the market rate. He further deposed that his land is in Bishrampur Village and Bachra colliery, Karkata colliery and Tuwang

2025:JHHC:17841

colliery are adjacent to his village and those collieries have been running for the last 60-65 years. Bishrampur is a town in which there is school, college, cement factory, hospital, shopping centre, etc. The cost of his land is Rs.1,50,000/- per acre and the lands of the vicinity are being sold on the said rate and the lands of Bishrampur, Bachra and Tuwang are of the same kind. During cross-examination, he admitted that he had received the compensation without writing any objection. He further admitted that he has not filed any document in respect of sale of lands @ Rs.1,50,000/- per acre.

29. CW-2 in his examination-in-chief deposed that CCL has acquired his six acres of land. He was not satisfied with the compensation paid to him and he should have been given compensation @ Rs.1,00,000/- per acre. Dakra Colliery is running since 1972. His land is in town and rural area. He further deposed that Central School, Khelari cement factory and road are situated adjacent to his land and Bachra, Piparwar and Churi collieries are situated in near his land. Bachra colliery is running since 1972 and Piparwar colliery is running since 1990. His acquired land is adjacent to Bachra Colliery and CCL has also acquired the lands in Bachra and Piparwar and his land is adjacent to the lands of Piparwar and Bachra. During cross-examination, he admitted that his land is situated at a distance of 5 Kms from the cement factory. He also admitted that he has not filed any document to show the rate for valuation of the acquired lands of Bachra and Piparwar. He further admitted that he had received the compensation with objection. He further admitted that the valuation of the lands of Bachra colliery was made @ Rs.1,00,000/- per acre and their basis is the same.

30. The claimants exhibited the following documents:

Exhibit-1 Certified copy of Judgment dated 08.01.2004 passed by the High Court in FA Nos.237 to 272, 274, 276 to 284 of 1994(R) Exhibit-1/A Certified copy of Judgment dated 16.09.2004 passed by the High Court in FA Nos.10, 16 and 17 of 1995(R)

2025:JHHC:17841

Exhibit-1/B Certified copy of Judgment dated 14.10.1993 passed by the learned Sub-Judge-I, Ranchi in Land Acquisition Case No.51/1993 and analogous cases Exhibit-1/C Certified copy of order dated 21.12.2009 passed by the learned L.A. Judge in L.A. Case No.3/1997 (Dama Bhogta -vs- Collector, Ranchi & Anr.) Exhibit-2 Award dated 07.01.2010 and Compromise Petition relating to L.A. Case 01/86-87, Land Reference Case No.3/1997 (Dama Bhogta -vs- Collector, Ranchi & Anr.)

31. The Opposite Party-CCL also examined two witnesses. OPW-1 is Ajit Kumar Sinha who was posted as the Assistant Revenue Officer, in the office of the Chief General Manager in North Karanpura Area, CCL and OPW-2 is Om Prakash Oraon who was posted as Upper Division Clerk in the office of the Chief General Manager in North Karanpura Area, CCL.

32. OPW-1 filed his examination-in-chief stating that the acquired lands of the claimants are situated in Bishrampur Village and when the notification under Section 4 was published on 21.04.1975, there was no provision for solatium and higher interest rate. He stated that the lands of the claimants are not situated in industrial area and are situated at a far distance from Rai, Hendegir and Bachra Collieries and therefore, the lands of those villages cannot be compared with the acquired lands. Those collieries were established after acquisition. He further stated that at the time of acquisition of the lands, Bishrampur was a rural area and there was no development. During cross- examination, he admitted that Bachra Colliery was started by NCDC before 1973 and the CCL has acquired the land there after 1973. Bachra is situated at a distance of 12 Kilometers from Bishrampur and Tandwa-Ranchi Pitch Road has passed adjacent to Bishrampur Village. He further admitted that Dakra, Churi, Kori, Rai, Tuwang, Manki, Karkata are situated within North Chandrapura Coalfield which were earlier private coalfields and were nationalized in 1973. He further stated at Paragraph 14 that the valuation of the lands of Bishrampur was made on the basis of sale deed, but he has no

2025:JHHC:17841

knowledge about the said sale deed. He further admitted that the Central Government had issued a circular on 12.05.1989 for payment of 30% solatium and 15% interest on the lands acquired under the C.B. Act. He further admitted that the lands of Bishrampur were acquired for K.D. Colliery which is situated within the Hesalong Project.

33. OPW-2 also filed his examination-in-chief stating the same facts as stated by OPW-1 and he exhibited the following documents on behalf of the Opposite Party-CCL:

Exhibit-A Notification S.O. 1394 dated 21.04.1975 of the Government of India, Ministry of Energy, Department of Coal published under Section 4(1) of the Coal Bearing Areas (Acquisition and Development) Act, 1957 Exhibit-B Notification S.O. 681 dated 27.01.1976 of the Government of India, Ministry of Energy, Department of Coal published under Section 7(1) of the Coal Bearing Areas (Acquisition and Development) Act, 1957 Exhibit-C Notification S.O. 170 dated 29.12.1976 of the Government of India, Ministry of Energy, Department of Coal published under Section 9(1) of the Coal Bearing Areas (Acquisition and Development) Act, 1957 Exhibit-D Statements showing details of the lands of Village-

Bishrampur acquired under Section 9(1) of the Coal Bearing Areas (Acquisition and Development) Act, 1957 Exhibit-E- C.R. (Compensation Report) along with order sheet dated 03.04.1989 passed by CCL in respect of the lands of the claimants.

During cross-examination, OPW-2 admitted at Para-17 that Bishrampur is situated at a distance of 3 (three) Kms from Khelari and the train for transporting coal passes through Bishrampur for going to Khelari and railway station, cement factory and washery are present there. He further admitted that market, quarter, station, all are present in Bishrampur and Bishrampur is an industrial area and all the facilities of a town are available in Bishrampur. He also admitted that

2025:JHHC:17841

he has not seen any sale deed on the basis of which the valuation of the land was made. He further admitted that Dakra Colliery is situated in the north of Bishrampur, Kumang Nawadih Colliery is situated in the south, Dakra Colliery is situated in the east and Bishrampur is in the west.

34. This court finds that C.W-1 stated that he did not receive the compensation under protest and C.W-2 stated that he received the compensation under protest. The fact remains that the compensation was received in the year 2001 through cheques and immediately upon receipt of cheques the petition under section 17(2) of Coal Bearing Act was filed. At the same time, CCL also did not produce any document to show from the records as to whether the compensation was received under protest or not and the endorsement of the claimants at the time of receipt of cheques have also not been exhibited. Considering the totality of the facts and circumstances of the case, the objection raised by the appellant-CCL that the compensation was received without protest and hence the case itself was not maintainable, is rejected.

35. This Court finds that on behalf of the claimants, altogether two witnesses were examined. C.W.-1 asserted that Bachra colliery, Karkata colliery and Tuwang colliery are adjacent to his village and the said collieries are in existence since last 60 to 65 years; Bishrampur is a town in which there is school, college, cement factory, hospital, shopping centre, etc. and the lands of Bishrampur, Bachra and Tuwang are of the same nature. He had also stated that the compensation was not paid at the market rate, but he did not file any document with respect to the sale-deed of the adjoining or nearby land.

36. So far as C.W.-2 is concerned, he has also stated that Bachra, Piparwar and Churi colliery are in the vicinity of Bishrampur and Bachra colliery was running since 1972, Piparwar was running since 1990 and his land is adjacent to Piparwar and Bachra. He has stated that the cement factory is around 5 Kms away from his land.

2025:JHHC:17841

37. So far as O.P. Witness No.1 is concerned, he has stated that at the time of acquisition of land, there was no provision for payment of Solatium and interest at excessive rate and the lands of the claimants are not within industrial area. He has also stated that Rai, Hendegir and Bachra collieries are at much distance and at the time of acquisition, there was no development and the other collieries were established after acquisition of land of Bishrampur. However, during his cross-examination, he admitted that Bachra colliery was started by NCDC before 1973 and CCL had acquired the same after 1973 and in the instant case the acquisition is of the year 1976. Though he has stated that Bachra is at a distance of 12 Kms from Bishrampur, but he has also stated that Bishrampur was located on the pitch road connecting Tandwa and Ranchi and this also indicates that land in Bishrampur had locational advantage being adjoining to road connecting Tandwa and Ranchi. He has also stated that the other collieries like Dakra, Churi, Rai, Tuwang, Manki, Karkata, etc. were nationalized in the year 1973 and they are around the village Bishrampur. He also stated that the land of Bishrampur was acquired for K.D. colliery. Though this witness stated that compensation was fixed on the basis of sale-deed, but he could not say on the basis of which sale-deed it was evaluated.

38. The evidence of O.P. Witness No.1 clearly suggests that the land acquired is on the pitch road connecting Tandwa and Ranchi and the collieries which were referred to by the claimants were acquired by CCL prior to the acquisition of land involved in the present case.

39. This Court also finds that though the opposite party (appellant herein) stated that compensation was fixed on the basis of sale-deeds, but they were not in a position to give the details of the sale-deeds which formed the basis of fixation of compensation against the lands of the claimants of the present case. Even the documents filed by the CCL had no reference to any sale deed which could have been the basis of fixation of rate of compensation.

40. The O.P. Witness No.2 had proved the notifications dated 21.04.1975, 27.01.1976 and 29.12.1976 which were marked as

2025:JHHC:17841

Exhibit- A, B and C respectively and he proved the statement of classification of land which was marked as Exhibit-D. C.R. (Compensation Report) was exhibited as public document which was marked as Exhibit-E and order-sheet dated 03.04.1989 was passed by CCL in respect of land of claimants Baso Sahu and Kanchan Sahu, both sons of Late Laldeo Sahu. However, from the perusal of the documents exhibited from the side of the CCL, none of the documents revealed as to whether any sale-deed was considered for the purpose of fixation of compensation and none of the documents referred to any sale-deed. Admittedly, CCL did not exhibit any sale-deed before the learned Tribunal to even prima-facie satisfy that the compensation was fixed on the basis of one or the other sale-deed of the relevant point of time. The O.P. Witness No.2 in his cross-examination has stated that Bishrampur is an industrial area acquired for extraction of coal and all the facilities of the town are available and he had not seen the sale-deeds etc. on the basis of which the land was evaluated. In Paragraph-22 of his cross-examination, O.P. Witness No.2 admitted that in north of Bishrampur, there is Dakra colliery, in south Kumang Nawadih colliery, in east Dakra Colliery and in the west, it is Bishrampur.

41. The evidences placed on record clearly reveal that the lands which were acquired in the present case in the year 1976 were acquired after the nationalization of other nearby collieries and the nearby collieries were existing including Bachra colliery. The stand of the opposite party (appellant herein) that at the time of acquisition, the other collieries were not existing, is not correct. Further, the acquired land was located on the pitch road and none other than O.P. Witness No. 2 admitted in his cross-examination at Paragraph-20 that Bishrampur was an industrial area and he has also given the details of the surrounding collieries. The O.P. Witness No.1 claimed in Paragraph-7 of his evidence that all the collieries were established after the acquisition of the land involved in this case. Such statement is clearly falsified by the materials placed on record including the fact

2025:JHHC:17841

that the land which was acquired for Bachra colliery and the compensation so fixed was relating to the acquisition of the year 1965.

42. The documents which were exhibited from the side of the claimants included Exhibit-1 which is certified copy of the judgment in First Appeal Nos.237 of 1994(R) and analogous cases passed by the High Court on 08.01.2004 which is relating to the acquisition for Bachra colliery in the year 1965. Section 4 notification in the said case was dated 23.12.1965. So far as judgment which was exhibited as Exhibit-1/A is concerned, the same is relating to acquisition of the year 1986-87 and is certainly relating to the period much after the acquisition involved in this case. So far as Exhibit-1/B is concerned, that is a judgment, but the same is also relating to acquisition of the year 1986 and therefore, the same also has no relevance for the facts of this case. Exhibit-2 is a compromise petition relating to another case, which also does not have any relevance.

43. The perusal of Exhibit-1 reveals that the rate fixed was Rs.975/- per decimal with respect to the land acquired way back in the year 1965. The learned Tribunal considered the Exhibit-1 and fixed the compensation at a little higher rate of Rs.1,000/- per decimal with interest of 5% per annum.

44. This Court finds that the land involved in this case certainly had the positive factor of being in the vicinity of other collieries which were already in existence at the time of acquisition and were around the area acquired. Further, the acquired land also had the advantage of being situated on the pitch road and it has also come in the evidence of O.P. Witness No.2 that the area was industrial and there was school, etc. in the vicinity. This Court finds that comparison of the compensation for the lands of the claimants with compensation fixed with respect to the property acquired way back in the year 1965 i.e. around 10 years prior to the date of acquisition involved in the present case, was certainly disadvantageous to the claimants, but at the same time, the learned Tribunal while considering the Exhibit-1 has fixed the compensation at Rs.1,000/- per decimal instead of Rs.975/- per decimal as fixed vide Exhibit-1. This Court also finds that in absence

2025:JHHC:17841

of any sale deed for comparison from the side of either party, the nearest evidence which was available for consideration was exhibit-1 and the learned Tribunal has applied its judicial mind and also considered the materials on record while relying upon exhibit-1 and fixing the compensation at Rs.1,000/- per decimal instead of Rs.975/- per decimal as fixed vide Exhibit-1.

45. In the judgment reported in 2022 0 Supreme (SC) 351 (Ramrao Shankar Tapase Vs. Maharashtra Industrial Development Corporation and others) (paragraphs 13, 13.1 and 13.2) it has been held that different market value/compensation can be determined for different lands located differently in the same village or locality; the lands abutting the main road or national highway would command a higher market value; in general there would be difference in the potentiality of lands situated in two different villages. On the same point, there is the judgement reported in (1998) 8 SCC 136 (Kanwar Singh and others Vs. Union of India) (paragraphs 8 and 9). This court finds that in the present case, the location of the acquired land is on the pitch road leading to Ranchi and therefore the land has locational advantage and there is no mechanical application of the exhibit-1 and in fact exhibit-1 was the only material which could be referred to determine the adequacy of the compensation awarded or to arrive at the market value of the acquired property at the time of acquisition.

46. In (2018) 13 SCC 96 (Manoj Kumar and others Vs. State of Haryana and others) (paragraphs 12 to 16) it has been held that determination of compensation in each case depends upon the nature of land and what is the evidence adduced in each case, and compensation cannot be determined by blindly following the previous award/judgment which has to be considered only a piece of evidence, not beyond that. It has also been held by the Hon'ble Court that the court has to apply the judicial mind and is supposed not to follow the previous awards without due consideration of the facts and circumstances and evidence adduced in the case in question. It has been held that the current value reflected by comparable sale deeds is more reliable and binding for determination of

2025:JHHC:17841

compensation in such cases and award/judgment relating to an acquisition made before 5 to 10 years cannot form the safe basis for determining compensation. It has also been held in paragraph 15 of the aforesaid judgement that reliance on judgements or awards passed more than 10 to 12 years back by giving either flat increase or cumulative increase as per the choice of individual Judge without going into the factual scenario is not the correct method of determination of compensation and the said method of determining compensation is available only when there is absence of sale transaction before issuance of notification under Section 4 of the Act and for giving annual increase, evidence should reflect that price of land had appreciated regularly and did not remain static.

Thus, it has been held in the aforesaid judgment that the previous award/judgment passed 10 to 12 years back can be relied upon only when there are no sale deeds for comparison to determine the market price of the acquired land.

In the present case neither the claimants nor the CCL have produced any sale deed as example for comparison to determine the market value of the acquired land and even the documents produced by the CCL did not reflect any mention of one or the other sale deed and on the face of the documents produced by the CCL there was no discernable material which could be the basis for determination of the market value of the acquired land. In such circumstances, the materials which were under consideration were only the previous awards/judgements which were required to be compared with the acquired land to determine the market value of the land involved in the present case.

47. In the judgement passed in (2013) 14 SCC 50 (Ramanlal Deochand Shah Vs. State of Maharashtra) (paragraphs 9 and 10) it has been held that it was not open to a Reference Court to determine the amount of compensation exceeding the amount of compensation determined in the award of Collector without recording a finding on consideration of the relevant material therein, that the amount of compensation determined in the award was inadequate. It has further been held that the claimant was in the position of a plaintiff on whom lay the burden of proving his case that the compensation awarded by the

2025:JHHC:17841

Collector was inadequate. It has been held in paragraphs 9 and 10 of the aforesaid judgment as under: -

"9. In Land Acquisition Officer v. Sidappa Omanna Tumari, a three-Judge Bench was dealing with a case where the question that fell for determination was whether it was open to a Reference Court to determine the amount of compensation exceeding the amount of compensation determined in the award without recording a finding on consideration of the relevant material therein, that the amount of compensation determined in the award under Section 11 was inadequate. Answering the question this Court considered the entire legislative scheme underlying the Act and clarified that a claimant was in the position of a plaintiff on whom lay the burden of proving his case that the compensation awarded by the Collector was inadequate. The following passage in this regard is apposite: (SCC p. 175, para 7) "7. When the Collector makes the reference to the court, he is enjoined by Section 19 to state the grounds on which he had determined the amount of compensation if the objection raised as to the acceptance of award of the Collector under Section 11 by the claimant was as regards the amount of compensation awarded for the land thereunder. The Collector has to state the grounds on which he had determined the amount of compensation where the objection raised by the claimant in his application for reference under Section 18 was as to inadequacy of compensation allowed by the award under Section 11, as required by sub-section (2) of Section 18 itself. Therefore, the legislative scheme contained in Sections 12, 18 and 19 while on the one hand entitles the claimant not to accept the award made under Section 11 as to the amount of compensation determined as payable for his acquired land and seek a reference to the court for determination of the amount of compensation payable for his land, on the other hand requires him to make good before the court the objection raised by him as regards the inadequacy of the amount of compensation allowed for his land under the award made under Section 11, with a view to enable the court to determine the amount of compensation exceeding the amount of compensation allowed by the award under Section 11, be it by reference to the improbabilities inherent in the award itself or on the evidence aliunde adduced by him to that effect. That is why, the position of a claimant in a reference before

2025:JHHC:17841

the court, is considered to be that of the plaintiff in a suit requiring him to discharge the initial burden of proving that the amount of compensation determined in the award under Section 11 was inadequate, the same having not been determined on the basis of relevant material and by application of correct principles of valuation, either with reference to the contents of the award itself or with reference to other evidence aliunde adduced before the court. Therefore, if the initial burden of proving that the amount of compensation allowed in the award of the Collector was inadequate, is not discharged, the award of the Collector which is made final and conclusive evidence under Section 12 as regards matters contained therein will stand unaffected.

But if the claimant succeeds in proving that the amount determined under the award of the Collector was inadequate the burden of proving the correctness of the award shifts on to the Collector who has to adduce sufficient evidence in that behalf to sustain such award. Hence, the court which is required to decide the reference made to it under Section 18 of the Act cannot determine the amount of compensation payable to the claimant for his land exceeding the amount determined in the award of the Collector made under Section 11 for the same land, unless it gets over the finality and conclusive evidentiary value attributed to it under Section 12, by recording a finding on consideration of relevant material therein that the amount of compensation determined under the award was inadequate for the reasons that weighed with it." (emphasis supplied)

10. In Major Pakhar Singh Atwal v. State of Punjab also this Court reiterated the position that a reference under Section 18 of the Land Acquisition Act is not an appeal against the award of the LAO. It merely is an offer. The proceeding before the Reference Court is of such nature that it places the claimant in the position of a plaintiff and the Reference Court is akin to a court of original jurisdiction. The Court observed: (SCC p. 404, para 5) "5. ... It is now settled law that the award is an offer and whatever amount was determined by the Collector is an offer and binds the Improvement Trust. However, the Collector also is required to collect the relevant material and award compensation on the basis of settled principles of determination of the market value of an acquired land. The Improvement Trust,

2025:JHHC:17841

therefore, cannot go behind the award made by the Collector. Reference is not an appeal. It is an original proceeding. It is for the claimants to seek the determination of proper compensation by producing sale deeds and examining the vendors or the vendees as to passing of consideration among them, the nearness of the lands sold to the acquired lands, similarly of the lands sold and acquired and also by adduction of other relevant and acceptable evidence. In this case, for the Court under Section 18 of the Act, the Tribunal is constituted. Therefore, if the claimants intend to seek higher compensation to the acquired land, the burden is on them to establish by proof that the compensation granted by the Land Acquisition Officer is inadequate and they are entitled to higher compensation. That could be established only by adduction of evidence of the comparable sale transactions of the land acquired or the lands in the neighbourhood possessed of similar potentiality or advantages. ... No doubt, in the award itself, the Land Acquisition Officer referred to the sale transactions. Since the Land Acquisition Officer is an authority under the Act, he collected the evidence to determine the compensation as an offer. Though that award may be a material evidence to be looked into, but the sale transactions referred to therein cannot be relied upon implicitly, if the party seeking enhancement resists the claim by adducing evidence independently before the court or the tribunal. In this case, since no steps were taken to place the sale transaction referred in the award, they cannot be evidence. So they can neither be relied upon nor can be looked into as evidence." (emphasis supplied)"

In the present case, there was no material from the side of the CCL as to the basis on which the compensation was fixed, inasmuch as, neither the award nor the exhibits even referred to any sale deed which could support the fixation of compensation by the CCL. This court finds that CCL had fixed the compensation in an ad hoc manner and without any basis. In such circumstances, the compensation fixed by CCL was rightly questioned by the claimants. Claimants had produced materials to claim higher compensation, though admittedly no sale deed as such was produced by them. The materials produced by the claimants were the basis of fixation of compensation after considering the materials on record.

2025:JHHC:17841

48. In the judgment passed by the Hon'ble Supreme Court in the case of "Shawal Singh v. Collector (LA)" reported in (2016) 12 SCC 619 in paragraph 8, the Hon'ble Supreme Court has referred to its earlier decision where it has been held that determination of compensation on the basis of guesswork is permissible only if relevant/sufficient evidence is not available on record. In the present case, there was no comparable sale deed from the side of either parties and even the documents produced by CCL regarding classification of land etc. did not reveal any comparison with one or the other sale deed and the judgement/award in connection with acquisition of land in village Bachra (exhibit-1) relating to acquisition of land in the year 1965 was found to be the nearest evidence for comparison and since the acquisition in the present case is of the year 1976 the market value of the acquired land has been taken with little guess work and slight increase.

49. Upon going through the evidences placed on record, this Court finds no illegality in comparison made by the learned Tribunal with the rate relating to acquisition of land for Bachra Colliery though made in the year 1965, as no sale-deed was at all placed before the learned Tribunal and the documents produced before the Tribunal by the opposite party (appellant herein) did not refer to any sale-deed at all, even to prima facie show as to the basis on which the compensation was fixed by CCL. It was certainly open to the learned Tribunal to make some guesswork and the only yardstick which was close to the facts of the case was Exhibit-1 and accordingly, this Court finds no illegality in the fixation of compensation @ Rs.1,000/- per decimal with interest of 5% per annum as awarded by the learned Tribunal.

50. So far as the claim of solatium and enhanced interest is concerned, the learned Tribunal has rejected the same by considering that the land was acquired in the year 1976 and at the time of acquisition, there was no provision for payment of solatium and interest as claimed by the claimants.

2025:JHHC:17841

51. So far as the circular dated 12.05.1989 is concerned, the same relates to payment of solatium and interest as the corresponding amendment was made in the Land Acquisition Act in the year 1984, but in the present case, the land was acquired prior to 1984 and nothing has been brought on record to suggest that solatium and interest would also be payable for the land which was acquired prior to 1984 or that the circular of the central government dated 12.05.1989 was given any retrospective effect.

52. So far as the judgment reported in AIR 1998 PATNA 100 (supra) which has been relied upon by the claimants to claim solatium and interest is concerned, the same is clearly distinguishable on facts.

In the said case, the initial compensation as fixed by the authority included solatium and interest and payment was also made to the claimants who received compensation under protest, but no grievance was ever raised by the authority in connection with payment of solatium and interest. In such circumstances, the court held that it was not open to the authorities to challenge the payment of solatium and interest and observed ".....In such a situation , in my opinion , now the appellant cannot be allowed to turn back and say that the same is not payable for the reason that payment of such amount is not provided under the Act.....". In the present case, no solatium and interest was fixed at the time of fixation of compensation as at that point of time, there was no concept of payment of solatium and interest. The claimants raised their grievance with regard to the aforesaid solatium and interest in the year 2001 i.e. after expiry of 24 years. The said judgement does not apply to the facts and circumstances of this case.

53. Further, the said judgement reported in AIR 1998 PATNA 100 (supra) is not an authority on the point as to whether the circular dated 12.05.1989 had a retrospective effect even on acquisition of land way back in the year 1976. The contents of the circular dated 12.05.1989 have been quoted in the judgement itself which reveal that the same was issued regarding payment of solatium and enhanced interest for acquisition of land under the aforesaid Act of 1957 also as there was

2025:JHHC:17841

amendment in Land Acquisition Act in the year 1984 regarding payment of solatium and enhanced interest which led to disparity in the matter of grant of compensation under the two enactments. This court is of the considered view that by no stretch of imagination the circular dated 12.05.1989 can be applied to the acquisition of the year 1976 and therefore the said circular is of no use to claim solatium and enhanced interest.

54. Considering the totality of facts and circumstances, this Court is of the considered view that the claimants are not entitled for solatium and enhanced interest. This is over and above the fact that cross- objection filed by the claimants has already been dismissed for non- removal of the defects and still the claimants have argued that their claim be considered as they are otherwise also entitled for just and fair compensation as per law. In that light, the claim for solatium and enhanced interest has been considered by this Court and this Court is of the view that the claimants are not entitled for solatium and enhanced interest and the learned Tribunal has rightly rejected such claim.

55. Accordingly, this Court finds no merit in this First Appeal, which is hereby dismissed.

56. Pending interlocutory application, if any, is closed.

57. There shall be no order as to costs.

58. The office is to prepare decree accordingly.

59. Let a copy of this Judgment be communicated to the concerned Court/Tribunal through Fax/E-mail.

(Anubha Rawat Choudhary, J.) Pankaj

 
Download the LatestLaws.com Mobile App
 
 
Latestlaws Newsletter
 

Publish Your Article

 

Campus Ambassador

 

Media Partner

 

Campus Buzz

 

LatestLaws Guest Court Correspondent

LatestLaws Guest Court Correspondent Apply Now!
 

LatestLaws.com presents: Lexidem Offline Internship Program, 2026

 

LatestLaws.com presents 'Lexidem Online Internship, 2026', Apply Now!

 
 

LatestLaws Partner Event : Smt. Nirmala Devi Bam Memorial International Moot Court Competition

 

LatestLaws Partner Event : IJJ

 
 
Latestlaws Newsletter