Citation : 2008 Latest Caselaw 14 Bom
Judgement Date : 10 December, 2008
1
IN THE HIGH COURT OF JUDICATURE AT BOMBAY
CIVIL APPELLATE JURISDICTION
APPEAL FROM ORDER NO.1109 OF 2005
WITH
CIVIL APPLICATION NO.1363 OF 2005
Mr.Gaurishankar Govardhandas Todi
Aged adult, occupation Business,
resident at 202, Amar Apartment,
Siddhi Vinayak Road, Bhayander (W),
Tq. & Dist. Thane - 401 101
ig ....Appellant
Versus
1. M/s.Evershine Homes Pvt. Ltd.
A company registered under the provisions
of the Companies Act, 1956, and having
office at : 201, Durga Chambers, 2nd floor,
40 Waterfield Road, Mumbai-400 050.
2. Mr.Shyamsundar Radheshyam Agarwal
Aged adult, occupation Business,
residing at 3/18, Ram Mandir Road,
Bhayander (W), Tq.& Dist. Thane ....Respondents
Mr.Anil Singh i/b Mr.Sameer S. Tambekar for the Appellant.
Mr.N. V. Walawalkar, Senior Counsel i/b M/s.Vimadalal & Co. for
Respondent No.1.
Mr.S. D. Patil for Respondent No.2.
CORAM : S.J. VAZIFDAR, J.
DATE : 10TH DECEMBER, 2008.
ORAL JUDGMENT : -
1. This is an Appeal against the order and judgment passed
by the learned Joint Civil Judge (Civil Judge) Thane restraining
Defendant No.1 from creating third party interests in the suit
properties.
The Appellant is Defendant No.1. Respondent Nos.1 and 2
are the Plaintiff and Defendant No.2. I will refer to the parties as they
are arrayed in the suit.
2. In upholding the order I have given reasons of my own. The
Plaintiff has made out more than just a strong prima-facie case
requiring the parties to maintain status-quo pending the hearing and
final disposal of the suit.
3. The suit is filed for a declaration that an MOU dated
24.6.2003 is valid and subsisting ; that the termination thereof by
Defendant No.1 is illegal and for an order directing the Defendants to
in effect specifically perform the suit agreement. In the above suit, the
Plaintiff took out an application for interim reliefs in which the
impugned order was passed.
4. The Defendants contended that the said MOU dated
24.6.2003 is not an agreement but merely an agreement to enter into
an agreement and therefore not enforceable. I do not agree. In my
view, it is a concluded contract.
5. There is no dispute that the Plaintiff and Defendant
No.1/the Appellant executed the suit agreement dated 24.6.2003.
As the submission was made on the basis of each of the six
"1.
clauses, it is necessary to set them out. They read as under :-
The Owner hereby agree to grant
Development Rights in respect of the said property and ultimately transfer and convey the said property in favour of the Developer and/or their nominees including a Co-operative Housing Society as the case may be. The Owner agrees to
grant development rights with vacant structure at
the rate of Rs.300/- (Rupees Three Hundred Only) per sq. foot of Built-up-area as permitted and sanctioned by the M. B. M. C. under building plans. The total consideration shall be paid as follows :
(a) Rs.11,00,000/- (Rupees Eleven Lakhs Only) as by way of earnest money on the execution of his Memorandum of d Understanding. Rs.1,00,000/- (Rupees One Lakh Only) has
already been paid in cash and Rs.10,00,000/- (Rupees Ten Lakhs Only) to be paid by Cheque by the Developer to the Owner towards balance payment of the said sum of Rs.11,00,000/- (Rupees Eleven Lakhs Only). The Owner hereby acknowledges the receipt.
(b) Rs.1,00,00,000/- (Rupees One Crore
Only) within 7 days after the Owner at his cost making out clear and marketable title to the
property free from all encumbrances, executing Development Agreement and irrevocable General Power of Attorney in favour of the Developer or its nominees in respect of his said property.
(c ). Rs.1,00,00,000/- (Rupees One Crore Only) within 7 days from the date the Owner at his cost obtaining General N. O. C. from the U. L. C.
authorities, obtaining Commencement Certificate from M. B. M. C. and N. A. approval from the
Collector, Thane, Demarcation of the Boundaries on the site as per D. I. L. R.. Plan and delivering vacant possession of his property together with the
Bungalow thereon to the Developer with irrevocable licence to commence and complete construction work on his property.
(d) The Developer has agreed to pay the
balance payment within four years in equal
installments, first of these installments to be paid within one year time from the date of the above payment of Rs.1,00,00,000/- (Rupees One Crore Only) made under Clause No.1 (c ) and the
remaining payment in six half yearly equal installments.
2. The Owner shall on the execution of this Memorandum and within Sixty days from the date
hereof fulfill the following obligations at his cost.
(a) demarcate the boundaries of the said property and to get the survey of the said property done through the Office of D. I. L. R.
(b) to obtain all permissions as mentioned in the Clause 1(c) above including Commencement
Certificate from M. B. M. C. for construction of building on the property.
(c ) to obtain Collector's permission for sale or development if necessary ;
(d) If the land is in any other Zone, the same shall be converted by the Owner for "R" and Commercial Zone.
(e) The Owner shall prepare the building plans for construction of the buildings on the said
property according to the requirements of the Developer before submitting the Plans to the M. B. M. C.
3. All cost charges, expenses for obtaining permissions (statutory or otherwise) under Clause 1(c) above including payment of Scrutiny Fees, deposits and other amounts to the M. B. M. C. or
other Government authorities shall be borne and
paid by the Owner.
4. The Owner shall within seven days from the date hereof, will furnish photocopies of the
original Title Deeds, Plans and other documents in respect of the said property to the Developer's Advocates and Solicitors for verification of the title and to cause the Public Notices in the newspaper inviting any objection from the public if any.
5. The Development Agreement when executed by the parties against payment of Rs.1,00,00,000/- (Rupees One Crore Only) under Clause 1(b) shall contain above specified terms and other usual terms and conditions relating to
the development of the property including obtaining of further statutory permits if any required
including containing of further Commencement Certificate, Occupation Certificate of the buildings
and the Building Completion Certificate, delivery and possession of flats and other premises in the building upon completion of the buildings and obtention of Occupation Certificate from the M. B.
M. C.
6. The Stamp Duty and Registration Charges on the Development Agreement, the
irrevocable Power of Attorney the Declaration to be made by the Owner as to title against payment of
Rs.1,00,00,000/- (Rupees One Crore Only) under Clause 1(b) will be borne and paid by the Developer alone. Each party shall bear and pay
their own Advocates costs."
6. Mr.Singh, the learned counsel appearing on behalf of the
Appellant also submitted that clause 4 contemplates the execution of
a formal document namely a formal development agreement to be a
term of the bargain between the parties.
7. As stated above, there is no dispute that the
Plaintiff/Respondent No.1 and the Appellant/Defendant No.1
executed the suit agreement. All the essential terms have been
agreed upon. The property is identified. The suit property comprises
of land admeasuring 3,00,000 sq. ft. together with a dwelling house
standing thereon. The price, Rs. 9,00,00,000/-, has been agreed to.
The time for payment thereof is also stipulated.
8. Mr.Singh did not even suggest which essential term not
mentioned in the suit agreement was required to be agreed upon.
Considering the nature of this agreement, there is no other essential
term which was not agreed upon. It is not even the first Defendant's
case that there was any consideration other the monetary
consideration that was payable. Clause 1 expressly stipulates that in
addition to grant of development rights in respect of the suit property,
the property itself was to be transferred by Defendant No.1 in favour
of the Plaintiff and/or the Plaintiff's nominees including a co-operative
housing society. The mere reference to the execution of a formal
document does not necessarily make the execution thereof to be a
term of the bargain. There is nothing in the present case that
suggests the contrary.
9. Thus as far as the suit agreement itself is concerned, the
Plaintiff has made out more than just a strong prima-facie case that a
concluded agreement had been entered into between the parties.
10. There is no dispute that the Plaintiff paid the initial amount
of Rs.11,00,000/-. The time to make payment of the further amounts
has admittedly not arrived. There is nothing to indicate that the
Appellant fulfilled all the terms and conditions of the suit agreement
including those stipulated in clause 2. It is not even the case of
Defendant No.1 that he has made out a clear and marketable title to
the property free from all encumbrances or that the development
agreement and irrecoverable power of attorney in favour of the
Plaintiff have been executed. Thus, the Plaintiff has fulfilled as its
obligations upto this stage whereas the Appellant/Defendant No.1 has
not.
11. This brings me to the involvement of Defendant
No.2/Respondent No.2 in the matter and the purported termination of
the suit agreement.
It is the Defendants' case that prior to the agreement
between the Plaintiff and Defendant No.1, an agreement dated
25.2.1998 was entered into between Defendant No.1 and Defendant
No.2 by which Defendant No.1 agreed to sell the suit property to
Defendant No.2.
12. As I will now demonstrate, this agreement can by no
stretch of imagination affect the suit agreement dated 24.6.2003 for
more than one reason. The subsequent facts establish how ultimately
the Defendants i.e. The Appellant and Respondent no.2 have
colluded in an endeavour to defeat the Plaintiffs agreement.
13(A). In November, 2003, DefendantNo.2 filed being Suit No.490
of 2003 for specific performance of the alleged agreement dated
25.2.1998. I use the work "alleged" in respect of the agreement
deliberately. The Plaintiff was not a party to the suit.
(B).
Upon the execution of the suit agreement and prior to the
filing of the said Suit No.490 of 2003, the Plaintiff's advocates had
caused to be published public notices all dated 25.9.2003 in three
newspapers stating that Defendant No.1 had agreed to grant in
favour of the Plaintiff development rights in respect of the suit property
and invited claims in respect thereof within 14 days. It appears that
Defendant No.2 raised objections. What the Appellant/Defendant
No.1 averred in paragraphs 9 and 23 of the written statement dated
30.1.2004 filed in Suit No.490 of 2003 is important and reads as
under:-
"9. It is not true that by an Agreement for sale, dated 25th February 1998, the Defendant (Defendant no.1 in the present suit) had agreed to sell the suit properties to the plaintiff (Defendant
no.2 in the present suit) for a total consideration of Rs.40,00,000/- and on the terms and conditions
stipulated therein. As there was no agreement in respect of the suit properties between the plaintiff
& the defendant there is no question of any term & condition between them. Hence all the terms & conditions as stated by the plaintiff in his plaint in para no.2 are imaginary & are based on cock &
bull story.
23. Therefore this defendant was dumb founded when the plaintiff objected the paper
notice issued by Misquita & Co. dated 25.9.2003 in daily Navaskati in respect of the suit properties,
who had issued the said notice on behalf of their client M/s.Evershine Shelters Pvt. Ltd. (Respondent no.1/Plaintiff in the present suit) &
had entered into an agreement to purchase the rest of the suit properties from this defendant for Rs.90,00,00,00/- vide M. O. U. dated 24.6.2003. To the said notice except the plaintiff no body has objected. The plaintiff objected the notice stating
that he has already entered into an agreement
dated 25.2.1998 with the defendant in respect of the suit properties. The defendant strongly denied the same & asked for the proof from the plaintiff. That is how the plaintiff put forward the alleged
agreement dated 25.2.1998. That was a forged document. The different type of the letters speak for themselves. Moreover the alleged power of attorney dated 25.2.1998 in respect of the suit properties is in fact totally false document. The
power of attorney shows that on 25.2.1998 it was notaries by the notary Mrs.Ethel d'mello & was identified by Advocate Sunil Garodia. In fact on that day the defendant never went to the said notary & the signature does not belong to him. Therefore understanding the gravity of the
offences to which extent the plaintiff may go in achieving his ulterior motive this defendant
decided to file his complaint in the economic wing of crime branch Mumbai, within whose jurisdiction
the plaintiff is residing & where the crime must have been perpetuated. The crime branch after investigation has come to a conclusion that the said agreement & power of attorney in respect at
the suit properties are fake. The crime branch called Notary D'mello with relevant registers but she has failed to produce the same & adv. Sunil Garodia has given statement before the crime
branch that he has not identified the deft. on 25.2.1998."
14.
Thus, upto this stage, Defendant No.1 not only confirmed
the agreement in the present suit but denied the said agreement
dated 25.2.1998 of which specific performance was sought in the said
Suit No.490 of 2003 by Defendant no.2/Respondent no.2.
15. Thereafter the Appellant and Respondent no.2 colluded to
defeat the agreement in favour of the Plaintiff/Respondent no.1. A
fresh agreement dated 21.7.2004 was entered into between
Defendant No.1 and Defendant No.2 in respect of the suit property.
16. In order to seek priority of this fresh agreement dated
21.7.2004 over the suit agreement dated 24.6.2003, Mr.Singh
contended that the alleged agreement dated 25.2.1998 stood merged
in the fresh agreement dated 21.7.2004. The argument requires
merely to be stated to be rejected.
17. Firstly, as stated above, Defendant No.1 had denied even
the existence of the agreement dated 25.2.1998 and had termed the
same as fabricated. Secondly, it is important to note clause 5 of the
agreement dated 21.7.2004, which reads as under :-
"5. It is represented by the Vendor/Owner that one MOU has been executed on 24.6.2003 by
him in favour of M/s.Evershine Homes Pvt. Ltd. And against the said MOU he has received
Rs.10,00,000/- (Rupees Ten Lakhs only) from said M/s.Evershine Homes Pvt.Ltd., the Vendor/Owner has undertaken to cancel that MOU and shall
submit such Deed of Cancellation or any such other document to satisfy the Purchaser/Developer. In case, the Vendor/Owner will not be in a position to get the said MOU cancelled there will be option for the
purchaser/Developer to do the needful to cancel
the said MOU on behalf of the Vendor/Owner and the amount that will be required to pay to M/s.Evershine Homes Pvt.Ltd. shall be deducted from the balance amount of consideration.
However, such amount shall not be exceeded the interest @ Rs.18% p.a. On the said amount of Rs.10,00,000/- (Rupees Ten Lakhs only).
" (emphasis supplied)
Thirdly it is interesting to note that consent terms had been
entered into between the Defendants in the suit Suit No.490 of 2003
though, it is stated that they were not ultimately filed in the Court.
Clause 13 of the said consent terms reads thus :-
"(13). The Plaintiff (Appellant herein and Defendant No.1 to the present suit) and Defendant No.1 (Respondent No.2 herein and Defendant No.2 to the present suit) have agreed that they will
not act upon the agreement the power of attorney dated 25.2.1998 and the same stands null, void
and ineffective." (emphasis supplied)
It is thus clear that the agreement dated 21.7.2004 was not
a mere variation of the alleged agreement dated 25.2.1998. The
agreement dated 21.7.2004 was a separate and independent
agreement.
18. Thus the alleged agreement dated 25.2.1998 cannot be
said to have merged into the agreement dated 21.7.2004. Clause 13
of the consent terms removes any doubt and makes it expressly clear
that the agreement dated 25.2.1998 ceased to exist altogether.
19. By no stretch of imagination can it be said that the
agreement dated 21.7.2004 ought to be considered as a mere
variation of the alleged agreement dated 25.2.1998 and therefore, it
be deemed to have priority over the suit agreement dated 24.6.2003.
20. By a letter dated 12.8.2004, Defendant No.1 purported to
terminate the suit agreement. It is of vital importance to note that the
only reason for terminating the agreement was that it was not
possible for Defendant No.1 to complete the transaction due to
"various legal complications". It was also alleged that the Plaintiff had
not taken any steps to compete the transaction as agreed. However,
no particulars in this respect were furnished. The Plaintiff offered to
return the said amount of Rs.11,00,000/-. There is no indication of
any breach on the Plaintiff's part. It is also important to note that the
letter is silent as to the fresh agreement dated 21.7.2004 entered into
between Defendant No.1 and Defendant No.2.
21. The termination is unfounded and without any basis
whatsoever. It indicates no breaches on the Plaintiffs part. It does not
even purport to make time of the essence of the agreement. It does
not indicate what the alleged legal complications are. It does not
disclose the relevant facts about the subsequent agreement with
Defendant No.2. The termination is therefore illegal and of no
consequence.
It is important to note that the Plaintiff made an application
dated 25.8.2004 for being impleaded in the said Suit No.490 of 2003.
This application was opposed by the Defendants. The application
was rejected by the learned Judge on 25.10.2004 who disposed of
the said Suit No.490 of 2003 by permitting the Plaintiff herein i.e.
Defendant No.2/Respondent No.2 herein to withdraw the suit.
22. The present suit was filed in these circumstances in
September, 2005. The impugned order was passed on 28.10.2005.
23. A technical plea was raised to the effect that the application
for injunction does not contain a prayer restraining Defendant No.1
from creating any third party interests in the suit property which is the
relief that has been granted by the impugned order. The application is
for the following prayers :-
"a). That pending the hearing and final disposal of the suit, the Defendant No.1 be restrained by an Order and Injunction of this Hon'ble Court from :
(i). making any application to the
concerned Local authorities, Revenue authorities, U. L. C. authorities for change
of user and/or for the purpose of development of the suit properties;
(ii). From handing over possession of the suit property to the Defendant No.2, his agents and/or servants and/or any
other person ;
(iii). From initiating any steps for the purposes of development of the suit
properties without the consent of the Plaintiff.
b).
Ad-interim and interim relief in terms of prayer clause (a) above."
24. The argument is purely technical. In fact the reliefs sought,
as set out earlier were wider. I cannot fault the learned Judge for
having moulded the relief and in fact having granted a lesser relief.
Indeed, the basis for rejecting the reliefs in terms of prayers (a-i) and
(a-ii) is, with respect to the learned Judge, misconceived. Prayers
(a-iii) has not been rejected. Considering the relief granted, it was
not necessary to grant prayer (a-iii).
25. It was further submitted that the pleading of readiness and
willingness is not adequate. It was contended that the Plaintiff merely
pleaded that it is ready and willing to make payment to the
Defendants towards the agreed price. Mr.Singh contended that the
pleading ought to have been that the Plaintiff always was and is even
now ready and willing to perform all the terms and conditions of the
agreement correctly construed.
26. Firstly, it is clear that all that remained to be done by the
Plaintiff in respect of the suit agreement was to make payment of the
balance purchase price. The time for the same has not even arrived.
There was nothing of any real substance other than that for the
Plaintiff to do. In any event, the plaint read as a whole indicates quite
clearly that the Plaintiff has been and is even now ready and willing to
perform all the terms and conditions of the agreement. The lapse, if
any, can easily be cured by the simple expedient of an amendment.
27. It was further submitted by Mr.Singh that the Plaintiff had
not challenged the agreement between Defendant No.1 and
Defendant No.2. It is not necessary for the Plaintiff to do so. The
Plaintiff's agreement is prior in time. It is expressly admitted by the
Defendants. Thus even assuming that the agreement dated
21.7.2004 is valid, it cannot affect the Plaintiff's agreement.
28. Lastly, it was submitted that the Plaintiff/Respondent No.1
ought to be directed to deposit the balance consideration. I do not
agree.
29. The Plaintiff has done what it was required to do under the
agreement. Every attempt has been made by both the Defendants to
deprive the Plaintiff of its rights under the suit agreement. The
Plaintiff has received absolutely no benefit under the suit agreement.
The Plaintiff's rights under the agreement are being denied even
today. The Plaintiff is not in possession of the suit property and the
Plaintiff can by no means whatsoever enjoy the same presently. In
these circumstances, it would be a travesty of justice to compel the
Plaintiff to deposit the balance consideration as a condition for grant
of an injunction.
30. In the case of Sanjay Agarwal v. Beekalane Fabrics (P) Ltd.
and another, 2007(9) L.J. Soft (URC) 1, I held as under :-
16. Finally, it was submitted that any order in favour of the Plaintiff must as a matter of law, also require the Plaintiff to deposit the balance consideration. I am unable to agree.
17. In a suit for specific performance, the Plaintiff is essentially required to establish that there is a valid and subsisting contract and that the Plaintiff is and always was ready and willing to perform all the essential terms and conditions of
the contract as per its true construction. There is neither any precedent nor principle which
mandates or even warrants that an interlocutory order in a specific performance suit must require
the Plaintiff to deposit the balance consideration. Indeed, such an absolute proposition would be grossly unfair and would cause great injustice to a Plaintiff in a suit for specific performance who has
a good case on merits.
Take for instance the present case where I have come to a prima-facie conclusion in
the Plaintiff's favour on merits. He is required to pay the balance consideration only on or before the
registration of the document and possession being handed over. Thus upon payment the Plaintiff would be entitled to enjoy the benefit of the
property as per the agreement. If I were to require him to deposit the balance consideration today without putting him in possession or ordering the documents to be executed by the Defendants and registered. I would in effect be compelling him to
fulfill his part of the contract without giving him the
benefit of the performance thereof by the other party, the Defendants. If such a view were to be upheld, the Plaintiff would in effect be required to perform all his obligations without being given the
benefit of the agreement. It would penalize an honest Plaintiff and put a premium on the dishonesty of the Defendant. The law does not mandate such an order. Logic far from supports it.
18. It is in the discretion of the court, depending on the facts and circumstances of the case, whether or not to require a Plaintiff to deposit the consideration as a condition of grant of an injunction in a suit for specific performance. As a rule such an order of deposit ought not to be
passed where the Court is satisfied with the merits of the Plaintiff's case and sees no reason to test
the bona-fides of the Plaintiff.
For instance such a course could be resorted to in cases where the Plaintiff is put in possession of and granted the full benefit of the agreement of which specific performance is sought
at the interim stage. Even in such a case such an order would not follow as a matter of course, as an inflexible rule.
19. Mr. Parekh relied on an order of a learned Single Judge of this Court dated 6.11.2006
in Appeal from Order No.1109 of 2005 (Shri Gaurishankar Govardhandas Todi vs. M/s. Evershine Homes Pvt. Ltd. & Anr.) and in particular
to the following observations in paragraph 4 thereof :-
"In order to get an injunction, the respondent No.1 must plead and show that requirements of section
16(c) of the Specific Relief Act) are complied i.e. he
is and always was ready and willing to perform his part of the contract i.e. to pay Rs. 9 crores. Learned counsel for the respondent No.1 was unable to point out specific averment made in the
plaint about his readiness and willingness to perform his part of the agreement. He however submitted that in the application for interim injunction the respondent no.1 has made an averment of his readiness and willingness and if
necessary such an averment would be made in the plaint by an amendment. In order to show his readiness and willingness, respondent no.1 should be required to deposit in this court the entire amount of the consideration. That is also necessary to protect the interest of the appellant
against any loss arising out of any fall in the price of the property as well as loss of interest. In my
view, the injunction should have been conditional upon such deposit of the amount in the court."
I do not read the judgment as laying down any general proposition as contended on behalf of the Defendants. The order was passed in the facts and
circumstances of that case. It is pertinent to note that in that case readiness and willingness, the pleading and proof whereof is a mandatory requirement under Section 16(c) of the Specific
Relief Act, was not even pleaded in the plaint.
20. Mr. Parekh then relied upon the judgment of another learned Single Judge dated 1.8.2007 in the case of (Aditya Munim vs. Kavita
Sanghi & Ors.). Notice of Motion No.2494 of 2007 in Suit No.1870 of 2007. It is true that in this case the learned Judge did come to the conclusion that the Plaintiff had made out a strong prima-facie case and despite the same ordered as under :-
"To ascertain the bona fide of the Plaintiffs while granting ad-interim relief to the Plaintiff so as to preserve the property till the hearing of the Motion, the Plaintiff can be called upon to deposit the entire
sale consideration in this Court including the amounts referred to in Clause (ii) and (iii) of paragraph 3.5 of the Plaint. This course can be adopted in terms of the exposition in decision in Appeal from Order No.1109 of 2005 dated 6th
November, 2006, which decision has been approved by the Apex Court in SLP No.2049 of 2006 decided on 15th December, 2006."
The learned Judge has by no means held that in every case for specific performance
where interlocutory reliefs are granted, the court is bound to order the Plaintiff to deposit the entire
consideration as a condition precedent. In fact the learned Judge has stated that in such a case the
Plaintiff can be called upon to deposit the entire sale consideration. The learned Judge obviously did so "To ascertain the bona-fides of the Plaintiff" therein. In the facts of this case I see no reason to
test the bona-fides of the Plaintiff.
31. It was submitted that in the present case by the order dated
6.11.2006, which is referred to by me in the above judgment, while
admitting the Appeal, the learned single Judge had granted a stay
subject to the Plaintiff/Respondent No.1 depositing the balance
consideration of Rs. 9.00 crores. It is true that the learned Judge
observed that in order to show its readiness and willingness,
Respondent No.1 should deposit the said amount. The learned Judge
also observed that the present value of the property was about Rs. 30
crores.
Respondent No.1 filed Petition for Special Leave (Civil)
No.20498 of 2006 against the said order in so far as it was directed to
deposit a sum of Rs. 9.00 crores. The Supreme Court ordered as
under:-
"The impugned order is an interim order made while admitting the appeal. We are not inclined to
interfere in exercise of powers under Article 136 of the Constitution of India. The learned counsel for
the petitioner, however, points out to Paragraph (15) of the plaint in support of the contention that
the averment as to the plaintiff being ready and willing to perform its part of the contract as required by Section 16 of the Specific Relief Act has been made in the plaint. We are not
concerned about it at this stage. The special leave petition is, accordingly, dismissed. However, the High Court is requested to expeditiously decide the appeal from Order No.1109 of 2005, preferably
within a period of four months. The petitioner would be at liberty to extension of time to make the
32.
deposit before the High Court."
I do not agree with the submission that the order passed
by the learned single Judge at the stage of admission is binding at the
final hearing of this Appeal. There is nothing in the order of the
Supreme Court either which indicates the same.
33. The view taken by me finds support from the judgment of
the Division Bench of this Court in the case of Yusuf Mohamed
Lakdawala v. Sudhakar Kashinath Bokade, 2008(5) LJ Soft 152 =
2008(2) Mah.L. J. 682, where it was held as under :-
"8. In the appeal filed by the Plaintiff it has been submitted that the Learned Single Judge was in error in granting an injunction subject to the condition that the Plaintiff deposits the entire balance of the consideration of Rs.9.21 Crores. On behalf of the Plaintiff it has been submitted that the
Learned Single Judge arrived at a conclusion that it was the Defendant who had committed prima
facie a breach of the agreement of the Memorandum of Understanding dated 3rd April,
2006. In the circumstances, it would be wholly inequitable to direct the Plaintiff to deposit the entire balance of the consideration of Rs.9.21 Crores at the ad interim stage while not enforcing
the obligations cast upon the Defendant firstly, to obtain a deed of reconveyance of the property which was mortgaged, secondly, to put the Plaintiff in possession with a right to construct and develop
and thirdly, to complete the entire transaction against the payment of the balance consideration.
We are of the view that there is merit in the submission urged on behalf of the Plaintiff and to that extent the Appeal of the Plaintiff would have to
be allowed. As we have already noted, Clause 4(b) of the agreement provided that the payment of the second installment of Rs.3.75 Crores was to be made subject to the Defendant fulfilling his obligations viz. of obtaining a deed of
reconveyance from the mortgagee; and placing the
Plaintiff in possession of the property with a right to develop and construct thereon. At the ad interim stage, it would in our view be inappropriate to direct the Plaintiff to deposit the entire balance of
the consideration amount of Rs.9.21 Crores without the Defendant being required to fulfill his part of the remaining obligations. The question of deposit, if any, should, in our view, be more appropriately considered at the hearing of the
Notice of Motion. The order of the Learned Single Judge to the extent to which the grant of an ad interim injunction was made conditional on a deposit of Rs.9.21 Crores would to the extent of the condition imposed have to be quashed and set aside."
34. Upon a consideration of the matter finally I am satisfied
that the Plaintiff has always been and remains ready and willing to
perform all its obligations. There is absolutely nothing that even
remotely suggests that the Plaintiff is not ready and willing to perform
its obligations. It is important to note that the Appellant has not even
dared to test the same by offering to perform the contract. If it did
and the Plaintiff refused it would be a different matter. It is the
Appellant/Defendant No.1 who has committed breaches of the
agreement. I am not inclined to accept the Plaintiff's refusal to
perform its obligations in the absence of Defendant No.1 performing
his obligations as a lack of readiness and willingness on the Plaintiff's
part. It is settled law that the purchaser need not have money ready
with him for the whole period from the date of the agreement to the
date of the hearing of the suit. It is sufficient if he has the capacity to
raise the funds when required. If the vendor were to perform his part
of the contract, the purchaser must have the funds at the time of
performance. At the interlocutory stage the test must be the
satisfaction of the Court as to the purchaser's readiness and
willingness if the vendor were to honour or be made to honour his
obligation. The Plaintiff has satisfied this test.
35. In the circumstances, the Appeal from Order and the Civil
Application are dismissed.
Publish Your Article
Campus Ambassador
Media Partner
Campus Buzz
LatestLaws.com presents: Lexidem Offline Internship Program, 2026
LatestLaws.com presents 'Lexidem Online Internship, 2026', Apply Now!