M/S Sangam Enterprises vs Sri Tushar Girinath Ias
2025 Latest Caselaw 9163 Kant

Citation : 2025 Latest Caselaw 9163 Kant
Judgement Date : 15 October, 2025

Karnataka High Court

M/S Sangam Enterprises vs Sri Tushar Girinath Ias on 15 October, 2025

                                        -1-
                                                    WA No. 73 of 2025
                                              C/W CCC No.1332 of 2024



                  IN THE HIGH COURT OF KARNATAKA AT BENGALURU

                    DATED THIS THE 15TH DAY OF OCTOBER, 2025

                                      PRESENT
                   THE HON'BLE MR. VIBHU BAKHRU, CHIEF JUSTICE
                                        AND
                        THE HON'BLE MR. JUSTICE C M JOSHI
                       WRIT APPEAL NO. 73 OF 2025 (LB-BMP)
                                        C/W
                     CIVIL CONTEMPT PETITION NO. 1332 OF 2024

             IN W.A. NO. 73 OF 2025
             BETWEEN:

             1.   THE BRUHATH BENGALURU MAHANAGARA PALIKE
                  REP. BY ITS CHIEF COMMISSIONER
                  N.R. SQUARE
                  BENGALURU - 560 002.

             2.   THE JOINT DIRECTOR OF TOWN PLANNING
                  BBMP, N.R. SQUARE
                  BENGALURU - 560 002.
Digitally                                               ...APPELLANTS
signed by
SRIDEVI S    (BY SRI MONESH KUMAR K.B., ADVOCATE)
Location:
High Court   AND:
of Karnataka
             1.   M/S. SANGAM ENTERPRISES
                  NO.15, DHANAVANTHRI ROAD
                  MAJESTIC, BENGALURU-560009
                  REP. BY ITS MANAGING PARTNER
                  R CHANDRU.

             2.   THE STATE OF KARNATAKA
                  REP. BY ITS PRINCIPAL SECRETARY
                             -2-
                                        WA No. 73 of 2025
                                  C/W CCC No.1332 of 2024



     URBAN DEVELOPMENT DEPARTMENT
     VIKAS SOUDHA
     BENGALURU - 01.
                                         ...RESPONDENTS
(BY SRI DHYAN CHINNAPPA, SENIOR ADVOCATE A/W
 SRI VIJAYKUMAR, ADVOCATE FOR R-1 &
 SRI K.S. HARISH, GOVERNMENT ADVOCATE FOR R-2)


       THIS WRIT APPEAL IS FILED UNDER SECTION          4 OF
THE KARNATAKA HIGH COURT ACT PRAYING TO SET ASIDE
THE ORDER PASSED BY THE LEARNED SINGLE JUDGE IN
W.P.No.80/2023   (LB-BMP)   DATED    29.05.2024   AND    BE
FURTHER PLEASED TO DISMISS THE SAME & ETC.


IN CCC NO. 1332 OF 2024

BETWEEN:

1.   M/S. SANGAM ENTERPRISES
     REPRESENTED BY ITS MANAGING PARTNER,
     SRI. R CHANDRU
     AGED ABOUT 54 YEARS
     NO.15, DHANVANTRI ROAD
     MAJESTIC, BENGALURU - 560 009.
                                     ...COMPLAINANT
(BY SRI DHYAN CHINNAPPA, SENIOR ADVOCATE A/W
 SRI VIJAYKUMAR, ADVOCATE)

AND:

1.   SRI TUSHAR GIRINATH (IAS)
     CHIEF COMMISSIONER,
     BRUHAT BENGALURU MAHANAGARA PALIKE
     BENGALURU - 560 002.
                             -3-
                                          WA No. 73 of 2025
                                    C/W CCC No.1332 of 2024



2.    SMT. SAVITHRI PATIL
      JOINT DIRECTOR TOWN PLANNING
      BRUHAT BENGALURU
      MAHANAGARA PALIKE
      N.R SQUARE
      BENGALURU - 560 002.
                                           ...ACCUSED
3.    THE STATE OF KARNATAKA
      REP BY PRINCIPAL SECRETARY,
      URBAN DEVELOPMENT DEPARTMENT,
      BANGALORE 560001

                                   ...PRO FORMA RESPONDENT

(BY SRI K.B. MONESH KUMAR, ADVOCATE)

      THIS CCC IS FILED UNDER SECTION 11 AND 12 OF THE

CONTEMPT OF COURTS ACT, 1971, PRAYING TO INITIATE

CONTEMPT     OF   COURT     PROCEEDINGS      AGAINST   THE

ACCUSED FOR HAVING COMMITTED CONTEMPT OF COURT

IN NOT IMPLEMENTING THE DIRECTION ISSUED BY THIS

HON'BLE COURT DATED 29.05.2024 IN W.P. NO.80/2023 AND

PUNISH THE ACCUSED IN ACCORDANCE WITH LAW.


       THIS WRIT APPEAL AND CCC, HAVING BEEN HEARD

AND    RESERVED   FOR     JUDGMENT,      COMING   ON   FOR

PRONOUNCEMENT        THIS         DAY,   JUDGMENT      WAS

PRONOUNCED AS UNDER:
                                  -4-
                                              WA No. 73 of 2025
                                        C/W CCC No.1332 of 2024



CORAM: HON'BLE MR. VIBHU BAKHRU ,CHIEF JUSTICE
       and
       HON'BLE MR. JUSTICE C M JOSHI

                          CAV JUDGMENT

(PER: HON'BLE MR. VIBHU BAKHRU, CHIEF JUSTICE)

1. For the reasons stated in the application - I.A.1/2025, the

same is allowed. The delay in filing the appeal is condoned.

2. The appellants - Bruhath Bengaluru Mahanagara Palike

[hereinafter BBMP] - have filed the present appeal impugning an

order dated 29.05.2024, passed by the learned Single Judge in

W.P.No.80/2023 (LB-BBMP) captioned M/s. Sangam Enterprises v.

The State of Karnataka and others, whereby the said writ petition

was allowed. Respondent No.1, a partnership firm, had filed the

aforementioned writ petition praying that directions be issued to

BBMP to consider approving the Modified Plan submitted by it on

28.03.2014 [Modified Plan] in terms of the Rules that existed on

the date of filing the Modified Plan. The writ petitioner also sought

directions to be issued to BBMP for considering the representations

submitted by the petitioner in this regard.

3. The Modified Plan is not in accordance with the Karnataka

Town and Country Planning (Benefit of Development Rights)

Rules, 2016, which were notified on 04.03.2017. Notwithstanding

the same, the petitioner claims that the Modified Plan is required to

be approved as the same is in accordance with the Rules that

existed on the date of the application, that is, as on 28.03.2014.

BBMP contends to the contrary.

4. The controversy arises in the context of loading of

Transferable Development Rights [TDR] and the provisions for

relaxation of the set back requirements under the applicable Rules.

5. The learned Single Judge had accepted the writ petitioner's

contention that the Rules as in force on the date when the approval

of Modified Plan was sought, are applicable. The learned Single

Judge reasoned that the statutory amendment of Section 14B of

the Karnataka Town and Country Planning Act, 1961 [KTCP Act]

and the Rules as notified on 04.03.2017 did not have any

retrospective operation. Thus, the principal question that requires

to be addressed in the present appeal is whether the approval of

the Modified Plan is required to be considered in accordance with

the KTCP Act and the relevant Rules that were in operation on the

day of the application of the Modified Plan or on the date of

sanction.

Prefatory facts

6. The writ petitioner holds lease hold rights in respect of the

properties bearing the address No.15, Dhanvanthri Road,

Bengaluru and No.13/3, Subedar Chatram Road (both adjacent

properties) measuring 5630.30 square meters.

7. The writ petitioner furnished a plan for construction of a

building comprising of a basement, ground floor, first floor, second

floor, third floor and terrace conforming to the height of 15 meters.

It proposed constructing the building for commercial complex and a

multiplex. The said building plan for construction of the commercial

complex was sanctioned by BBMP on 16.04.2013.

8. The writ petitioner proposed to raise additional construction

with the intermittent height up to 29.60 metres, with relaxation of

the set back norms. Accordingly, it entered into an agreement with

one M/s. Aishwarya Heights Infra Private Limited for purchasing

development Rights [TDR] on 15.11.2013. The writ petitioner

claims that it also made advance payment of Rs.1.00 crore for

purchasing the said TDRs. In addition, the writ petitioner also

purchased TDRs from one Smt. Aanemma, wife of late Aaneppa,

measuring 7477.06 square meters.

9. Thereafter, the writ petitioner furnished the Modified Plan for

construction of additional floor by loading the TDRs. The Modified

Plan also entailed relaxation of set backs in accordance with the

Circular dated 23.11.2009 issued by BBMP, which was applicable

at the material time. The Modified Plan was not accepted and

appellant No. 2 issued an endorsement (order) directing the writ

petitioner to secure and furnish an NOC from the Fire Service

Department.

10. In view of the said endorsement, the writ petitioner applied

for NOC with regard to the Modified Plan, to the Fire Service

Department. The Fire Service Department inspected the site and

issued an endorsement dated 08.05.2017, inter alia stating that it

was not accepting plans that entail relaxation of set backs.

11. The writ petitioner being aggrieved by the endorsement

dated 08.05.2017, filed a writ petition being WP.No.25321/2017.

The said petition was disposed of on 22.06.2017 with a direction to

the concerned department to dispose of the writ petitioner's

application for NOC as expeditiously as possible and in any event

with an outer limit of two weeks from the date of the said order.

The learned Single Judge also held that "the consideration of the

petitioner's application shall date back to 22.02.2017, on which

date the petitioner first submitted the application for issuance of

NOC".

12. In compliance with the said directions, the Karnataka Fire

Service Department issued NOC dated 07.10.2017. Thereafter, on

13.10.2017, the writ petitioner submitted a representation to the

BBMP to approve the Modified Plan, which was submitted on

28.03.2014 as per the Rules existing on that date. Similar

representations were also made on 04.07.2018 23.01.2019

22.02.2021, 24.11.2021 and 19.10.2022. However, The said

representations did not elicit any response. In the aforesaid

context, the writ petitioner filed a writ petition being WP.No.80/2023

(LB-BMP), which was disposed of in terms of the impugned order.

The Controversy

13. The Bangalore Development Authority [BDA] issued the

Revised Master Plan 2015 on 22.06.2007. Thereafter on

12.07.2019, BBMP had issued a Circular providing for relaxation of

set backs for sanctioning of building plans.

14. The KTCP Act was amended by Act No.23 of 2004 with

effect from 03.06.1994. The amendments included insertion of

Section 14B, which contained provisions for providing benefit on

development rights [TDRs] in the KTCP Act. The relevant extract of

Section 14B of the KTCP Act as introduced with effect from

03.06.2004 is set out below:

"14-B. Benefit of development rights: Where any area within a local planning area is required by a Planning Authority or local authority for a public purpose and the owner of any site or land which comprises such area surrenders if free of cost and hands over possession of the same to the planning authority or the local authority free of encumbrances, the planning authority or the local authority, as the case may be, may notwithstanding anything contained in this Act or the regulations but subject to such restrictions or conditions as may be specified by notification by the State Government, permit development rights in the form of additional floor area which shall be equal to one and half times of the area of land surrendered. The development right so permitted may be utilised either at the remaining portion of the of the area after the surrender or anywhere in the local planning area, either by himself or by transfer to any other person, as may be prescribed. The area remaining after surrender shall have the same floor area which was available before surrender for the original site or land as per regulations.

Explanation: For the purpose of this section,-

(a) "Public purpose" means,-

(i) widening of an existing road or formation of a new road;

(ii) providing for parks, playgrounds and open spaces or any other civic amenities;

- 10 -






             (iii) maintaining or improving         heritage
             building or precincts notified         by the
             State Government. '

(iv) Any other purpose notified by the State Government from time to time.

(b) "Development right" means the right to carry out development or to develop land or building or both."

15. The scheme entails providing for development rights in the

form of additional floor area equal to one and a half times the area

surrendered by an owner of any site or land, which is required for

any public purpose, such as widening of the roads, parks etc. The

development rights could be utilized for additional construction in

the portion of the area remaining with the owner after the

surrender of part of the site or land for public purposes, free of cost.

Additionally, the right holder could also transfer these rights to

another person for utilizing the same.

16. Paragraph 10 of Chapter X of the Revised Plan also

permitted relaxation of the set back area upto a maximum extent of

50%, in cases where the permissible floor area ratio would not be

achieved after utilizing the TDRs. Paragraph 10 of the Revised

Master Plan, 2015, is set out below:

"10. The Authority may consider relaxing set backs, and coverage to a maximum extent of fifty percent,

- 11 -

when the permissible Floor Area Ratio cannot be achieved, in case of D.R.C. arising out of land surrendered free of cost for road widening. This relaxation is also permissible in the receiving plot or in the same plot left over after surrender. When plot generating the TDR utlises the DRC as the receiving plot, then the incremental parking need not be insisted. No relaxation can be given for area required for parking in receiving plot. While exercising the above power, the Authority shall finalise the building line for the entire road taken up for widening keeping in view the developments existing, feasibility and smooth flow of traffic and notify the same. No construction shall be allowed in violation of such notified building line".

17. On 23.11.2009, BBMP issued a Circular holding that "50%

discount is allowed in the areas and median spaces".

18. The writ petitioner seeks benefit of the relaxation to the

extent of 50% of set backs as per the policy that was in vogue prior

to the notification of the Rules on 04.03.2017.

19. Section 14B of the KTCP Act was substituted by virtue of Act

No. 38 of 2015 with effect from 10.09.2015. Sub-section (12), (13)

and (14) of Section 14B of the KTCP Act as introduced are relevant

and are set out below:

Section 14.

      ***                ***                 ***

      Section 14-B
                                  - 12 -






      ***                ***                  ***


(12) The Development Rights so issued shall be utilised within the same Local Planning Area to which it is issued.

[(13) The Development rights may be utilised within the same plot or in other area in the same Local Planning area or as notified by the Government, by the owner or the owner of such Development Rights may transfer the Development rights to a transferee as Transferable Development Rights which may be sold or utilised in any area as prescribed within the Local Planning Area or as notified by the Government.]

(14) The utilisation of Development Rights at the receiving plot shall be subject to limitations, as may be prescribed.

20. Thereafter, the Karnataka Town and Country Planning

(Benefit of Development Rights) Rules, 2016 [The Rules] were

framed under the KTCP Act and were notified on 04.03.2017. The

said Rules provided for set back relaxations. Sub-Rule (8) of Rule 4

of the Rules is relevant and set out below:

"4. Terms and Conditions for grant of Development Rights:-

      ***                ***                  ***

      (8) Setback relaxation:

      (a) In Originating plots
                           - 13 -





(1) With building below 15.0 m. height - In the originating plot where there is no option for increasing the setback area in case of loading of the Development Rights on the existing building, the available existing side and rear setbacks shall be considered as the permitted back in case of the final height of the building is below 15.0 m. after loading of the development rights.

In case of road widening the available front setback shall be the permitted setback after road widening

(ii) With building above 15.0m. In case the height of the building is 15.0m and above, due to utilization of Development Rights on the existing building, setbacks shall be followed as under,-

(a) Relaxation in setback and coverage in the remaining plot after surrender shall not exceed beyond twenty five percent of the prescribed setback proportionate to the quantum of the Development Rights utilized as explained below:

Example (1) ********

Example : (2) ********

(b) For buildings with 15 Meters and above height the No objection Certificate from Fire Force Department shall be produced.

(c) In case of Road widening the available front setback shall be treated as the permitted setback after road widening.

(iii) On vacant land: When the originating plot itself becomes the receiving plot the terms and conditions applicable to the plot size after deducting the surrendered area and the setback relaxation shall be as per sub-rule (8)(b).

- 14 -

(b) Transfer of Development Rights at Receiving Plots,-

(i) The Development Rights shall be utilized over and above the ordinarily permissible Floor Area Ratio at the receiving plot which is either vacant or has an existing building. In case if the applicant utilizes Floor Area Ratio less than the permissible Floor Area Ratio to avail the benefit of relaxation of set back by utilizing the Transferable Development Rights, in such cases the additional Floor Area Ratio shall be 0.6 times the actual Floor Area Ratio utilized within the permissible Floor Area Ratio.

(ii) Relaxation in setback and coverage may be permitted for the buildings in the receiving plots utilizing Transferable Development Rights and this relaxation shall be proportionate to the quantum of the Transferable Development rights utilized and in any case shall not exceed beyond twenty five percent of the prescribed setback as explained below:

Example: (1) ************** Example:(2) ***************

Note. A Transferable Development Right when utilized in respect of an existing building, the existing all round setbacks shall be in compliance with the requirements for the additional Floor Area Ratio and the additional height of the building due to loading of Development Rights / Transferable Development Right".

21. It is apparent from the above, that the relaxation of setbacks

is permissible upto the maximum extent of 25%. Concededly, the

Modified Plan does not conform to the said set back norms. In the

aforesaid context, the point in issue is whether the policy/Rules as

existing at the time of filing the application for sanction of the

- 15 -

Modified Plan or as in force on the date when the approval is

granted, is applicable.

Impugned Orders

22. As noted above, the learned Single Judge accepted the

contention that the rules as applicable on the date when the

application for approval of Modified Plan was made is applicable.

23. The learned Single Judge referred to the decision of this

court in the case of M/s. Aishwarya Heights Infra Private Limited

v. State of Karnataka and others: WP.No.2618/2016 (LB-BBMP)

decided on 24.03.2016. In that case the court had allowed the writ

petition and directed BBMP to consider approval of modified plans,

which were submitted on 28.07.2014 in accordance with the bye-

laws as on the date of the application and in terms of the Circular

dated 23.07.2009. The learned Single Judge held that the Section

14B as amended with effect from 10.09.2015 would have no

application since the approval for the re-modified plan was

furnished prior to the substituted Section 14B coming into effect.

24. The impugned order was passed following the decision in

M/s. Aishwarya Heights Infra Private Limited (supra).

- 16 -

Reasons and Conclusions

25. The decision in M/s. Aishwarya Heights Infra Private

Limited (supra) is founded on the premise that filing an application

for sanction of building plan results in vesting of an absolute or

indefensible right with the applicant. Thus, application would

require to be considered on the basis of the Rules as on that date.

The relevant extract of the decision in M/s. Aishwarya Heights

Infra Private Limited (supra) is set out below.

"11. Section 14-B of the Act has been amended w.e.f. 10.9.2015 by Karnataka Act No.38/2015. It is evident that this amendment has prospective effect. It is no doubt true that Rules have not been framed under Section 14-B of the amended Act. However, this amendment has no application to the instant case.

12. It is settled position that when a particular provision of an Act is in force when particular transaction was effected, then, the subsequent repeal of the statute will not affect the merits, rights or liabilities of the parties on the date of that transaction. A statute affecting vested rights is prima facie prospective unless it expressly or by necessary implication indicates to the contrary. The Legislature has full power to make a law retrospective so as to destroy a right or a remedy altogether but this must be expressly laid down or this result must flow by necessary implication.

13. The word 'vest' is normally used where an immediate fixed right in present or future enjoyment in respect of a property is created. The Hon'ble Supreme Court in J.S.YADAV's case (supra), has explained the meaning of the expression 'vested right' as under:

- 17 -

"21. The word 'vest' is normally used where an immediate fixed right in present or future enjoyment in respect of a property is created.

With the long usage the said word 'vest' has also acquired a meaning as 'an absolute or indefeasible right'. It had a 'legitimate' or 'settled expectation' to obtain right to enjoy the property, etc. Such 'settled expectation' can be rendered impossible of fulfillment due to change in law by the legislature. Besides this, such a 'settled expectation' or the so- called 'vested right' cannot be countenanced against public interest and convenience which are sought to be served by amendment of the law (vide Howrah Municipal Corporation Vs. Ganges Rope Co.

Ltd. - (2004) 1 SCC 663).

22. Thus, 'vested right' is a right independent of any contingency. Such a right can arise from a contract, statute or by operation of law. A vested right can be taken away only if the law specifically or by necessary implication provides for such a course."

(emphasis supplied by me)

14. Section 6 of the Karnataka General Clauses Act states that repeal of the Act shall not affect any right or privilege accrued or acquired under an enactment so repealed, unless a different intention appears. This Section does not profess to preserve an abstract right accrued under a repealed statute. It would apply to specific rights given to a party consequent on happening of one or the other event as specified in the statute.

15. In VIDEOCON INTERNATIONAL LIMITED's case (supra), the Hon'ble Supreme Court has held that the amendment of a statute, which is not retrospective in operation, does not affect pending proceedings, except where the amending provision expressly or by

- 18 -

necessary intendment provides otherwise. Pending proceedings are to continue as if the un-amended provision is still in force. When a lis commences, all rights and obligations of the parties get crystallized on that date and the mandate of Section 6 of the General Clauses Act simply ensures that pending proceedings under the un-amended provision remain unaffected.

16. Section 14-B of the Act was amended by Karnataka Act No.38/2015, which has come into effect from 10.9.2015 is not retrospective in operation either expressly or by necessary implication. Therefore, the rights accrued under the repealed enactment are saved and the old procedure will subsist for enforcement of the rights accrued under the repealed enactment. The amended Act does not affect any right, privilege, obligations or liability acquired or incurred under the repealed enactments In fact with an intention to secure certain relaxation in the set back and to increase the number of multiplexes from 3 to 5 along with incremental height to 29.63 meters, petitioner purchased development right from B.S.Leelavathy. The TDR certificates dated 23.7.2010 are at Annexure-H series. The petitioner was also granted loan in principle on the project by the Syndicate Bank, which is evident from the communication at Annexure-J dated 17.6.2014. Having secured the financial assistance from the Nationalised Bank, subject to sanction of the re- modified plan to be submitted to the 2nd respondent, the petitioner applied for sanction of the re-modified plan after loading the TDRs seeking relaxation of the set backs as per the circular at Annexure 'D' dated 23.11.2009.

17. It is also to be stated here that the Deputy Commissioner, Bengaluru District under the Cinema Regulations has granted approval for construction of five screen multiplex in 6th and 7th floor under Regulation 31(3) of the Regulations as per Annexure 'R' dated 14.12.2015. During the pendency of the petitioner's application for grant of re- modified plan, Section 14-B was amended w.e.f. 10.9.2015 prescribing

- 19 -

certain restrictions regarding relaxation in the set backs, which has no application to the instant case. In my opinion, the 2nd respondent has to consider approval of the re-modified plan submitted on 28.7.2014 in terms of the existing bye-laws as on the date of the application in terms of the circular at Annexure-D dated 23.11.2009".

26. In our view, the question whether the building plan has to be

sanctioned on the basis of the Rules and bye-laws prevailing on

the date of the application or on the date when the sanction is

accorded, is no longer res integra. It is also material to note that in

M/s. Aishwarya Heights Infra Private Limited (supra), the

learned Single Judge had set out paragraph 21 of the decision of

the Supreme Court in J.S. Yadav v. State of Uttar Pradesh and

another : 2011 6 SCC 570, which in turn referred to the decision in

the case of Howrah Municipal Corporation and others v.

Ganges Rope Co. Ltd., and Others: (2004) 1 SCC 663.

However, the learned Single Judge had erred in not considering

the import of that decision.

27. In Howrah Municipal Corporation (supra), the Supreme

Court considered an appeal arising out of the decision of the

Division Bench of the Kolkata High Court directing grant of sanction

for construction of three additional floors in a multi storey complex.

The said complex was constructed upto four floors and the

- 20 -

sanction of a modified plan for constructing the additional floors

was denied by the Howrah Municipal Corporation. In that case, the

respondent company (Ganges Rope Co. Ltd.) had applied for

sanction for construction of a complex upto seven floors on

06.07.1992. The said sanction was not accorded within a period of

sixty days as required under the applicable Building Rules.

27.1. In the given circumstances the said company had

approached the Calcutta High Court by filing a writ petition, which

was disposed of on 26.04.1993 with a direction to the Howrah

Municipal Corporation to consider the application for grant of

sanction of a building plan submitted on 06.07.1992 in accordance

with the Howrah Municipal Corporation Act and Building Rules.

However, the Corporation neither granted nor refused to grant

sanction within the stipulated period. This led the respondent to

once again approach the Calcutta High Court on 23.12.1993. The

Court disposed of the application by directing Howrah Municipal

Corporation to grant sanction to the respondent's plan upto fourth

floor level if all requirements were duly complied with. The Court

further directed the Howrah Municipal Corporation to grant the

sanction within a period of one month from the date of

communication of the order. Additionally, the Court clarified that

- 21 -

the order would not prevent the writ petitioners from applying for

further sanction, if the same is permissible, at a later date.

27.2. The writ petitioner completed the building complex up to the

fourth floor level and in view of the liberty granted by the Calcutta

High Court applied for sanction to construct additional three floors

beyond the fourth floor by a letter dated 27.05.1994. The Howrah

Municipal Corporation did not entertain the said application.

Aggrieved by the same, the writ petitioner once again approached

the Calcutta High Court. The Court observed that the right of the

writ petitioner to apply for sanction of further floors was explicitly

reserved under the order dated 23.12.1993 and therefore directed

the Corporation to pass appropriate orders regarding sanction for

construction of the additional three floors within a period of four

weeks.

27.3. The writ petitioner sent a letter dated 28.06.1994 seeking

sanction for construction of additional three floors. In response to

the said letter, the Corporation called upon the writ petitioner to

furnish fresh plans. Thereafter, the Corporation sent another letter

dated 19.09.1994 calling upon the writ petitioner to submit requisite

number of prints of the proposal, tax clearing certificate, previous

- 22 -

sanction plan, indemnity bond for deep foundation work, approval

of the Fire Services Authority and documents showing permission

for change of user. The writ petitioner complied with the said

directions.

27.4. While the petitioner's application for sanction of additional

floors was pending, the Government of West Bengal issued a

notification dated 15.07.1994 amending the Building Rules,

whereby the height of the high rise buildings was restricted to a

prescribed level depending on the width of the street on which the

building is proposed to be constructed.

27.5. In view of the amended Building Rules restricting the height

of the buildings commensurate to the width of the road, the writ

petitioner's proposal for constructing additional floors was

cancelled. The learned Single Judge declined to interfere with the

said decision. The writ petitioner appealed the said decision before

the Division Bench of the Calcutta High Court, which reversed the

judgment passed by the learned Single Judge.

27.6. The Division Bench reasoned that the writ petitioner's

application seeking sanction for additional construction was

governed by the amended rules and regulations as in force on the

- 23 -

date of submission of the applications and the amendment of the

Building Rules could not take away the vested rights. At this stage,

we may note that this is precisely the reasoning on which the

decision in M/s. Aishwarya Heights Infra Private Limited (supra)

rests.

27.7. In view of the above, one of the questions that fell for

consideration of the Supreme court was whether the application

filed by the writ petitioner in Ganges Rope Co. Ltd. had resulted in

a vested right for the same to be construed in accordance with the

law as was in force on the date of the application. In this regard,

the Supreme Court held as under.

"37. The argument advanced on the basis of so-called creation of vested right for obtaining sanction on the basis of the Building Rules (unamended) as they were on the date of submission of the application and the order of the High Court fixing a period for decision of the same, is misconceived. The word "vest" is normally used where an immediate fixed right in present or future enjoyment in respect of a property is created. With the long usage the said word "vest" has also acquired a meaning as "an absolute or indefeasible right" [see K.J. Aiyer's Judicial Dictionary (A Complete Law Lexicon), 13th Edn.].

The context in which the respondent Company claims a vested right for sanction and which has been accepted by the Division Bench of the High Court, is not a right in relation to "ownership or possession of any property" for which the expression "vest" is generally used. What we can understand from the claim of a "vested right' set up by the respondent

- 24 -

Company is that on the basis of the Building Rules, as applicable to their case on the date of making an application for sanction and the fixed period allotted by the Court for its consideration, it had a "legitimate" or "settled expectation" to obtain the sanction. In our considered opinion, such "settled expectation", if any, did not create any vested right to obtain sanction. True it is, that the respondent Company which can have no control over the manner of processing of application for sanction by the Corporation cannot be blamed for delay but during pendency of its application for sanction, if the State Government, in f exercise of its rule-making power, amended the Building Rules and imposed restrictions on the heights of buildings on G.T. Road and other wards, such "settled expectation"

has been rendered impossible of fulfilment due to change in law. The claim based on the alleged "vested right" or "settled expectation" cannot be set up against statutory provisions which were brought into force by the State Government by amending the Building Rules g and not by the Corporation against whom such "vested right" or "settled expectation" is being sought to be enforced. The "vested right" or "settled expectation" has been nullified not only by the Corporation but also by the State by amending the Building Rules. Besides this, such a "settled expectation" or the so-called "vested right" cannot be countenanced against public interest and convenience which are sought to be served by amendment of the Building Rules and the resolution of the Corporation issued thereupon".

28. In M/s. Aishwarya Heights Infra Private Limited (supra),

the learned Single Judge had set out an extract from the decision

of the Supreme Court referring to the decision in the Howrah

Municipal Corporation (supra). But the decision M/s. Aishwarya

- 25 -

Heights Infra Private Limited (supra) is quite contrary to the

principles as explained in the said decision.

29. In Howrah Municipal Corporation (supra), the Supreme

Court had also referred to the decision in the case of Usman Gani

J. Khatri v. Cantonment Board : (1992) 3 SCC 455. The following

observations of the Supreme Court in that case are equally

instructive:

"In any case, the High Court is right in taking the view that the building plans can only be sanctioned according to the building regulations prevailing at the time of sanctioning of such building plans. At present the statutory bye-laws published on 30-4-1988 are in force and the fresh building plans to be submitted by the petitioners, if any, shall now be governed by these bye-laws and not by any other bye-laws or schemes which are no longer in force now. If we consider a reverse case where building regulations are amended more favourably to the builders before sanctioning of building plans already submitted, the builders would certainly claim and get the advantage of the regulations amended to their benefit."

30. In New Delhi Municipal Council and others v. M/s. Tanvi

Trading and Credit Private Limited and others : Civil Appeal

Nos.5292/2008 and 5293/2008 decided on 28.08.2008, the

Supreme Court reiterated the view as expressed in Usman Gani J.

Khatri (supra). We consider it apposite to set out the following

extract from the said decision.

- 26 -

"11. It is well settled that the law for approval of the building plan would be the date on which the approval is granted and not the date on which the plans are submitted. This is so in view of paragraph 24 of the decision of this Court in Usman Gani J. Khatri of Bombay vs. Cantonment Board and others etc. etc. (1992) 3 SCC 455. It would not be out of place to mention that on February 7, 2007, the Master Plan 2021 has been approved in which the LBZ guidelines have been incorporated and since plan submitted by the respondents were not approved up to the date of coming into force of Master Plan of 2021, the LBZ guidelines will apply with full force to the plan submitted by the respondents and the plan which is contrary to the LBZ guidelines could not have been directed to be sanctioned".

31. The decision in the case of M/s. Aishwarya Heights Infra

Private Limited (supra) is contrary to the law as settled by the

Supreme Court in Howrah Municipal Corporation and others v.

Ganges Rope Co., Ltd., and others; Usman Gani J. Khatri v.

Cantonment Board; as well as the decision of the Supreme Court

in NDMC and others v. Tanvi Trading and Credit Private

Limited and others. The said decision is accordingly overruled.

32. Coming to the facts of the present case, the writ petitioner

filed an application for seeking NOC for the Modified Plan from the

Karnataka Fire Service Department on 22.02.2017. However, as on

that date, Section 14B of the KTCP Act had been amended and the

Rules had been notified. In terms of the Rules, the set back

- 27 -

relaxation is confined to 25%. Admittedly, the Modified Plan is not

in conformity with the said norms. Accordingly, no directions could

be issued for sanction of the Modified Plan. Thus, the impugned

order directing the appellants to sanction the Modified Plan,

permitting the petitioner to utilize the TDR certificate dated

18.04.2015, cannot be sustained.

33. Before concluding, we may also note that Mr. Chinnappa,

learned Senior Counsel had during the course of his arguments

referred to paragraph 10 of Chapter X of the Revised Master Plan,

2015 and submitted that in terms of paragraph 10, the BBMP was

required to consider relaxing of set backs and coverage to a

maximum extent of 50% and therefore, the writ petitioner was

entitled to such relaxation. This was countered by the learned

counsel for the BBMP. He submitted that the paragraph 10 of the

Revised Master Plan is applicable only where the permissible floor

area ratio cannot be achieved. He submitted that in the present

case the said condition was not satisfied.

34. We are not persuaded to accept that the writ petitioner can

draw any benefit from paragraph 10 of the Master Plan. It is clear

from the plain language of paragraph 10 of the Revised Plan that

- 28 -

the same enables the concerned authority to consider relaxing set

backs up to a maximum extent of 50%. It does not mandate that

relaxation to 50% set backs is required to be granted. BBMP has

framed Rules regarding the permissibility of the norms relating to

set backs and cannot sanction a plan contrary to the Rules.

35. In view of the above, the present appeal is allowed and the

impugned judgment is set aside.

36. The Contempt petition - CCC.No.1332/2024 - which alleges

wilful disobedience of the order impugned in the appeal

(WA.No.73/2025) is, accordingly, closed.

37. Pending application stands disposed of.

Sd/-

(VIBHU BAKHRU) CHIEF JUSTICE

Sd/-

(C M JOSHI) JUDGE

SD

 
Download the LatestLaws.com Mobile App
 
 
Latestlaws Newsletter
 

Publish Your Article

 

Campus Ambassador

 

Media Partner

 

Campus Buzz

 

LatestLaws Guest Court Correspondent

LatestLaws Guest Court Correspondent Apply Now!
 

LatestLaws.com presents: Lexidem Offline Internship Program, 2026

 

LatestLaws.com presents 'Lexidem Online Internship, 2026', Apply Now!

 
 

LatestLaws Partner Event : IDRC

 
 
Latestlaws Newsletter