Il And Fs Financial Services ... vs Kohinoor Realty Management ...
2023 Latest Caselaw 4569 Bom

Citation : 2023 Latest Caselaw 4569 Bom
Judgement Date : 3 May, 2023

Bombay High Court
Il And Fs Financial Services ... vs Kohinoor Realty Management ... on 3 May, 2023
Bench: N. J. Jamadar
2023:BHC-OS:3923

                                                                                         sj-44-2019.doc




                          IN THE HIGH COURT OF JUDICATURE AT BOMBAY
                             ORDINARY ORIGINAL CIVIL JURISDICTION

                              SUMMONS FOR JUDGMENT NO.44 OF 2019
                                             IN
                            COMMERCIAL SUMMARY SUIT NO.839 OF 2019

             IL & FS Financial Services Limited (IFIN)                    ...Applicant
                   In the matter between
             IL & FS Financial Services Limited (IFIN)                    ...Plaintiff
                   vs.
             Kohinoor Realty Management Private Limited
             and Others                                                   ...Defendants


             Dr. Birendra Saraf, Senior Advocate a/w. Mr. Sachit Bhogle, Mr.
             Bhushan Shah, Mr. Akash Jain and Mr. Akash Mehta i/b.
             Mansukhlal Hiralal & Co., for the Plaintiff.

             Mr. Akshay Patil i/b. Mr. Akshay Kamble, for Defendant No. 1.

             Dr. Veerendra Tulzapurkar, Senior Advocate i/b. Mr. Mandar
             Soman, for Defendant Nos. 2 and 3.

                                               CORAM : N. J. JAMADAR, J.
                                         RESERVED ON :        28th NOVEMBER, 2022
                                       PRONOUNCED ON :        3rd MAY, 2023.
                                                   -------------

             ORDER :

1. This Commercial Division Summary Suit is instituted to

recover a sum of Rs. 17,52,56,942/- along with further interest @

14% p.a. till payment and/or realization.

2. The material averments in the plaint can be summarized as

under:

             Vishal Parekar, P.A.                                                                  ...1





                                                                       sj-44-2019.doc




a] The plaintiff is a non banking financial company engaged in the

business of finance and advisory services. It is a 100% subsidiary of

Infrastructure Leasing and Financial Services Limited (IL & FS).

The defendant No. 1 is a company incorporated under the

Companies Act, 1956. The defendant No. 2 is the Chairman and

Managing Director of defendant No. 1. Defendant No. 3 is a Director

of defendant No. 1.

b] The plaintiff asserts in or about December, 2017, the

defendant No. 2, in the capacity of the promoter of defendant No. 1,

had approached the plaintiff for a short term loan of Rs. 16 Crores.

Based on the representations of the defendants, the plaintiff had

offered to provide a short term loan facility of Rs. 16 Crores to

defendant No. 1 on the terms and conditions set out in the letter

dated 27th December, 2017. Under the terms of the said letter, the

short term loan was to be repaid within a period of six months from

the date of disbursement. The said facility was to be used for the

purpose of expenses relating to Cluster Redevelopment Project at

Mahim.

c] Pursuant to the terms of the said letter, the plaintiff and

defendant No. 1 had entered a loan agreement dated 4 th January,

2018 for extension of a short term loan of Rs. 16 Crores. Pursuant

to and in accordance with the loan agreement, the plaintiff asserts,

Vishal Parekar, P.A. ...2

sj-44-2019.doc

a number of instruments were executed, namely, the defendant No.

1 executed a Deed of Undertaking I dated 16th February, 2018

followed by another Deed of Undertaking II. An irrevocable,

absolute and unconditional personal guarantee vide letter dated 4 th

January, 2018 was executed by defendant No. 2. An agreement of

first ranking pari pasu pledge of 100% equity shares of Kohinoor

Planet Constructions Private Limited (KPCPL) dated 16 th February,

2018 (Pledge Agreement) was executed by defendant No. 1, as

borrower, and defendant Nos. 2 and 3, as pledger cum guarantors.

Under the Pledge Agreement, defendant Nos. 2 and 3 also agreed to

be jointly and severally liable as a principal debtor without

exclusion/ reference to others for the payment/repayment of the

dues under the loan agreement.

3. The plaintiff claimed that it disbursed the first tranche of Rs.

9,62,78,218/- to defendant No. 1 on 5 th January, 2018. The second

tranche of Rs. 5,35,00,000/- was disbursed on 28th June, 2018.

4. The plaintiff claimed that it repeatedly called upon the

defendant No. 1 to repay the outstanding amount. Defendants failed

and neglected to repay the due amount. Despite service of the last of

the notices dated 21st February, 2019, the defendants neither paid

Vishal Parekar, P.A. ...3

sj-44-2019.doc

the amount nor gave any reply. Thus, the plaintiff was constrained

to institute the suit for recovery of a sum of Rs. 17,52,56,942/-

along with interest @ 14% p.a.

5. In response to the writ of summons the defendant Nos. 1 to 3

appeared. Thereupon, the plaintiff took out the Summons for

Judgment.

6. The defendant Nos. 1 to 3 have filed separate affidavits in

reply seeking an unconditional leave to defend the suit. Since the

defendants No. 1 to 3 have heavily relied upon the affidavit in reply

filed on behalf of defendant No. 2, it may be expedient to first note

the grounds on which defendant No. 2 seeks an unconditional leave

to defend the suit.

7. At the outset, the tenability of the summary suit was assailed

on the ground that it pertains to the claims which are not covered

by the provisions contained in Order 37, Rule 1(2) of the Code of

Civil Procedure, 1908 (the Code). The tenability of the suit was

assailed on the ground that the plaintiff is prosecuting the present

suit without giving up the security namely the shares of Kohinoor

Planet Constructions Private Limited pledged by defendant Nos. 2

Vishal Parekar, P.A. ...4

sj-44-2019.doc

and 3. The defendant No. 2 also assailed the tenability of the suit

qua defendant No. 3 as defendant No. 3 is merely a pledgor of the

shares held by defendant No. 3 in KPCPL. The defendant No. 3 is not

personally liable for the repayment of the amount covered by suit

claim.

8. Defendant No. 2 further contended that the suit suffers from

vice of suppression of material facts and, therefore, the plaintiff is

not entitled to any relief.

9. According to the defendant No.2, the real transactions

between IL & FS group and Kohinoor group, evidenced by a number

of documents, were materially distinct from the transaction

asserted in the plaint. IL & FS group and Kohinoor group had a joint

venture agreement and understanding for the acquisition of the

plot of land with structures of Kohinoor Mill-3 for implementation

of a development project thereon namely Kohinoor Square project.

10. A Consortium Agreement dated 20 th July, 2005 was entered

into by and between Kohinoor and IL & FS group was for acquisition

of the Kohinoor Mill-3 and execution and implementation of the

Kohinoor Square project. Pursuant to the said agreement Kohinoor

Vishal Parekar, P.A. ...5

sj-44-2019.doc

CTNL Infrastructure Company (KCTNL) was incorporated as a

Joint Venture Company and special purpose vehicle. The plaintiff,

IL & FS group company, and KPPL, a Kohinoor group company,

subscribed to the equity share capital of KCTNL as per the First

Shareholders Agreement. Later on, the plaintiff sold its share

holding in KCTNL to the Kohinoor Group Company and as per the

Second Shareholders Agreement and Second Supplemental

Shareholders Agreement, IFIN Realty Trust and IIRF India VII

Limited, two other IL & FS group entities, subscribed to the equity

and preference share capital of KCTNL so that upon such

subscription the Kohinoor group and IL & FS group held the share

capital in the ratio of 60:40.

11. The defendant contends the plaintiff deliberately suppressed

the fact that all amounts given to Kohinoor group by IL & FS group

were meant for financing the Kohinoor Square Project and the

amounts given, either directly or routed through Kohinoor group

companies, were in the nature of quasi equity participation though

they were shown as loans and advances. The said money brought in

by IL & FS group was treated as an exposure in the Kohinoor

Square project. Drawing heavily upon a Memorandum of

Understanding (MOU) dated 20th January, 2016 the defendant

Vishal Parekar, P.A. ...6

sj-44-2019.doc

contends that the repayment towards quasi equity participation in

the form of loans from the IL & FS in KCTNL, was to be made out of

the sale proceeds of Kohinoor Square project.

12. The defendant No. 2 further contended that by an order dated

21st February, 2018 passed by National Company Law Tribunal,

KCTNL underwent corporate insolvency resolution process. In

accordance with the resolution plan, the share capital held by

Kohinoor group in KCTNL was reduced to 1.2% of the equity

shareholding and that of the IL & FS group to 18.8% equity

shareholding, to be held by IIRF India Realty VII Limited. The loan

purportedly advanced by the plaintiff being in the nature of quasi

equity participation for the Kohinoor Square project, the plaintiff is

not entitled to recover the same as a loan simpliciter. Therefore,

defendant No. 2 is entitled to an unconditional leave to defend suit.

13. The defendant No. 1 also seeks unconditional leave by taking

the grounds which are raised by defendant No. 2. In fact, defendant

No. 2 has sworn an affidavit on behalf of defendant No. 1 in the

capacity of the Director of defendant No. 1.

14. Affidavit in reply on behalf of defendant No. 3 proceeds on an

identical line.

Vishal Parekar, P.A.                                                               ...7





                                                                        sj-44-2019.doc




15. In the affidavits in rejoinder, the plaintiff avers the

transactions referred to in the affidavits in reply have no bearing on

the suit. The claim in the instant suit is stated to be an independent

transaction governed by an independent agreement between the

parties. The transaction, according to the plaintiff, was not the

subject matter of the alleged MOU as the loan agreement was

executed much after the said MOU. At any rate, according to the

plaintiff, the MOU clearly provides that it does not contain any

binding legal duties and obligations. The parties were not obligated

to consummate any transaction with reference to MOU. The plaintiff

asserts, reference to the transactions and the documents in the

affidavit in reply has been made with a view to create a confusion

about the transaction in question and obtain leave to defend the suit

which the defendants are otherwise not entitled to. Affidavits in

sur-rejoinder were also filed on behalf of the defendants.

16. In the wake of the aforesaid pleadings, I have heard Dr.

Birendra Saraf, learned senior advocate for the plaintiff, and Mr.

Akshay Patil, learned counsel for defendant No. 1 and Dr. Veerendra

Tulzapurkar, learned senior counsel for defendant Nos. 2 and 3.

With the assistance of the learned counsel for the parties, I have

carefully perused the material on record.

Vishal Parekar, P.A.                                                             ...8





                                                                          sj-44-2019.doc




17. Dr. Saraf, the learned senior counsel for the plaintiff

submitted that the plaintiff's claim is supported by documents of

unimpeachable character which render the defences sought to be

urged on behalf of the defendant unworthy of grant of leave to

defend the suit. Laying emphasis on the loan agreement dated 4 th

January, 2018, the undertakings of the defendant dated 16 th

February, 2018, personal guarantee executed by defendant No. 2 on

4th January, 2018 and the pledge agreement dated 16 th February,

2018 executed by defendant Nos. 1 to 3, Dr. Saraf would urge that

advance of loan by the plaintiff to the defendant is rather

incontestable. To add to this, according to Dr. Saraf, there is a clear

and unequivocal acknowledgment of the liability in the balance-

sheets of the defendant for the financial year 2017-18 and 2018-19.

The defences now sought to be put forth by the defendants are

creatures of afterthought and do not raise any triable issue. Thus a

decree must follow, urged Dr. Saraf.

18. In contrast to this, Dr. Tulzapurkar, learned senior counsel

for defendant Nos. 2 and 3 strenuously submitted that the

defendant deserves an unconditional leave to defend the suit for

deliberate suppression of facts on the part of the plaintiff. Whole

body of instruments, which evidence transactions between the

Vishal Parekar, P.A. ...9

sj-44-2019.doc

Kohinoor and IL and FS Group, was suppressed by the plaintiff.

Such deliberate suppression of material facts, in itself, constitutes a

ground to dismiss the Summons for Judgment, urged Dr.

Tulzapurkar. Taking the Court through the Consortium Agreement

executed between Kohinoor Projects Private Limited, a group

company of a Kohinoor Group, and Consolidated Transportation

Networks Limited, the then subsidiary of IL and FS Group dated

20th July, 2005 to develop the Kohinoor Square Project,

Shareholders Agreement dated 11th October, 2005, Share

Subscription cum Shareholders Agreement dated 29 th September,

2008 executed between Kohinoor CTNL Infrastructure Company

Limited, Kohinoor Projects Private Limited, IL and FS Trust

Company Limited and IIRF India Realty VII Limited and defendant

No. 2 as the promoter, Supplemental Share Subscription cum

Shareholders Agreement and Memorandum of Understanding

dated 20th January, 2016 (MOU), Dr. Tulzapurkar would urge that

the documents unmistakably indicate that there have been

transactions between various entities of IL and FS and Kohinoor

Group. Yet the plaintiff approached the Court as if the transaction

in question was one of the ordinary transactions between a lender

and creditor. Had the plaintiff approached the Court with a case

that the transaction in question is distinct from the transaction

Vishal Parekar, P.A. ...10

sj-44-2019.doc

evidenced by aforesaid documents, according to Mr. Tulzapurkar

different considerations would have come into play. In view of the

suppression of the genesis of the jural relationship between the

parties arising out of commercial transactions, over a period of

time, the defence of the defendant that the advance in question is

also a part of the transaction between IL and FS and Kohinoor

Group cannot be brushed aside as a sham and moonshine defence.

The defendant No. 2 thus deserve an opportunity to prove to the

contrary, at the trial.

19. Dr. Tulzapurkar further submitted that the plaintiff can not

draw mileage from the entry in the balance-sheets for the financial

year 2017-18. In the succeeding year, the defendants have clarified

the said entry in the balance-sheet. Resultantly, the statement in

the balance-sheet for the year 2017-18 cannot be relied upon as a

clear and unequivocal acknowledgment of the liability, which only

can sustain a decree.

20. As regards the liability of defendant No. 3 it was urged that

defendant No. 3 being a pledgor cannot be held personally liable.

The plaintiff has his remedies under section 174 of the Indian

Contract Act in respect of the pledged shares. However, in the case

Vishal Parekar, P.A. ...11

sj-44-2019.doc

at hand, the plaintiff is seeking to proceed against the pledgor as a

guarantor, which is impermissible in law, submitted Dr.

Tulzapurkar.

21. Mr. Patil, the learned counsel for defendant No. 1 while

supplementing the submissions of Dr. Tulzapurkar, made an

endevour to draw home the point that terms of MOU dated 20 th

January, 2016 are comprehensive enough to include the subject

transaction. The MOU, according to Mr. Patil, encapsulates the

course of business dealings between the IL and FS and Kohinoor

group and, thus, the fact that the advance in question was made

after the MOU dated 20th January, 2016 does not detract materially

from the defence of the defendants.

22. To start with, it may be appropriate to note that the factum of

advance of a sum of Rs. 17,52,56,942/- in two tranches of Rs.

9,62,78,218/- on 5th January, 2018 and Rs. 5,35,00,000/- on 28 th

June, 2018, as such, is not in contest. Nor the fact that a loan

agreement came to be executed on 4 th January, 2018 between the

plaintiff and the defendants is in dispute. The execution of the

undertaking on 16th February, 2018 by the defendant in favour of

the plaintiff is also not controverted. Defendant No. 2 indisputably

Vishal Parekar, P.A. ...12

sj-44-2019.doc

executed a letter of guarantee on 4 th January, 2018, unconditionally

agreeing to pay the said loan amount alongwith interest and

charges within 24 hours of the demand. Under the pledge

agreement the defendant Nos. 1 to 3 pledged the shares they held in

Kohinoor Planet Constructions Private Limited.

23. Without controverting the execution as such of all the

aforesaid instruments, the defendants essentially questioned the

character of the transaction between the parties. The substance of

the defence is that the loan in question is a subterfuge and the real

transaction was of infusion of quasi equity into Kohinoor Group, in

general, and Kohinoor Square Project, in particular, with an

understanding that the repayment of the said amount would be

made out of the sale proceeds of the Kohinoor Square Projects and,

in the event the amount could not be repaid, through the proceeds

of any other project developed by the Kohinoor Group.

24. Since the defendants faced an obstacle in the nature of the

admission of liability in the balance-sheet, for the financial year

2017-18, an endevour was made to show that the entry in the said

balance-sheet has since been explained. I deem it in the fitness of

things to first deal with this contention.

Vishal Parekar, P.A.                                                           ...13





                                                                                  sj-44-2019.doc




25. In the balance-sheet as of 31st March, 2018, the sum of Rs.

9,62,78,218/- which was advanced on 5th January, 2018, was shown

as a short term borrowing. In the balance-sheet as of 31 st March,

2019, a sum of Rs. 14,66,02,356/- was shown as a short term

borrowing owed to the plaintiff. An explanatory note came to be

added thereto, to the effect that the said loans were recalled by

letter dated 19th October, 2018 and, according to the management of

the company, it was a quasi equity and thus the company contested

the above mentioned liability and therefore no provision for any

interest was made during FY 2018-19 and 2019-20. Whether this

explanation is of assistance to the defendants ?

26. Dr. Saraf, learned senior counsel for the plaintiff, submitted

that the aforesaid explanation which came to be added after

institution of the suit is of no significance as it is self serving.

Placing reliance on the judgment of the Supreme Court in the case

of Asset Reconstruction Company (India) Limited vs. Tulip Star

Hotels Limited and Others1 Dr. Saraf submitted that the

acknowledgment in the balance-sheet for the year 2017-18 being

unequivocal and contemporaneous with the advance, deserves

precedence.

1 2022 SCC OnLine SC 944.

Vishal Parekar, P.A.                                                                     ...14





                                                                       sj-44-2019.doc




27. An endevour was made on behalf of the defendants to draw

home the point that it is not the law that an erroneous admission

cannot be explained. In fact, this Court has held that the statement

in the balance-sheet can be explained in subsequent balance-sheet.

Therefore, the statement in the balance-sheet for the year 2017-18

cannot be construed as sacrosanct. Once the defendants succeed in

demonstrating that the statement in the balance-sheet was not

correct, the plaintiff can not draw any mileage therefrom.

28. To bolster up the aforesaid submission, Dr. Tulzapurkar

placed reliance on the judgment of the Delhi High Court in the case

of Vijay Gupta and Others vs. Ashok Kumar Gupta 2 and Karnataka

High Court in the case of Raj A. menda and Others vs. M/s. Rani

Rasamani Real Estate and Others3. The circumstances, in which a

decree on an admission can be justifiably passed under Order XII

Rule 6 of the Code of Civil Procedure, 1908 were considered in the

aforesaid judgments.

29. Mr. Patil placed a strong reliance on the judgment of the

Division Bench of this Court in the case of Inteltek Automation Pvt.

Ltd. vs. Indusind Bank Ltd.4 wherein it was enunciated that in view

2 2007 (95) DRJ 167.

3 ILR 2007 KAR 2627.

4   2011 (1) Mh.L.J. 935

Vishal Parekar, P.A.                                                          ...15





                                                                          sj-44-2019.doc




of the statement in the balance-sheet that the claim for interest and

principal was in dispute, a decree on admission could not have been

passed on the basis of audit report which forms part of the balance-

sheet. The Division Bench followed the judgment of another Division

Bench of this Court in the case of Ultramatix Systems Pvt. Ltd. vs.

State Bank of India and Others5 wherein it was enunciated that the

statement contained in the balance sheet and profit and loss

account of a company would an admission of its liability, unless

subsequent balance sheets were filed to show that either the

amounts have been paid or were not due and payable and/or any

other material was produced to hold otherwise.

30. Mr. Patil also placed reliance on the judgment of the Supreme

Court in the Reliance Asset Reconstruction Company Limited vs.

Hotel Poonja International Private Limited6 wherein in the facts of

the said case in view of the note appended to the balance-sheet, it

was held that in view of the notes, the balance-sheet cannot be

treated as an acknowledgment of the liability.

31. It is trite to sustain a decree on admission, the admission of

liability ought to be clear, explicit and unequivocal. In the case at

5 2007(4) Mh.L.J. 847 6 (2021) 7 Supreme Court Cases 352

Vishal Parekar, P.A. ...16

sj-44-2019.doc

hand, the defendants endevoured to wriggle out of the situation

brought about by an entry in the balance-sheet for the year 2017-18

by placing reliance on the explanation sought to be offered in the

balance-sheet for the succeeding year. In a given situation, a party

could be permitted to demonstrate that the statement in a balance-

sheet is incorrect or that the liability has since ceased. However, it

all turns upon the fact situation which obtains. It is imperative to

note that the first tranche of loan was advanced on January, 2018.

In the balance-sheet as of 31st March, 2018 the very same amount

was shown as a short term borrowing. The statement in the

balance-sheet as of 31st March, 2018 thus has an element of

spontaneity.

32. In the wake of dispute between the parties and institution of

suit on 19th April, 2019, in the balance-sheet for the succeeding

year, the defendants made an attempt to explain away the position.

The fact that the said explanation came to be offered after the

institution of the suit cannot be lost sight of. Had it been a case that

the same explanation found place in the balance-sheet as of 31 st

March, 2018, it would have lent an element of credence to the said

version. Since the explanation was sought to be offered after the

dispute arose between the parties as regards the liability to repay

Vishal Parekar, P.A. ...17

sj-44-2019.doc

the said amount, the defendants cannot be permitted to bank upon

the said explanation to contend that they have a substantial

defence.

33. This takes me to the core of the defence of the transaction in

question being a part of the series of advances by the IL & FS Group

to the Kohinoor Group as and by way of quasi equity. Edifice of this

defence, in addition to Consortium Agreement and Share

Subscription cum Shareholders Agreement, is principally built

around the MOU dated 20th January, 2016. It may be apposite to

consider the relevant clauses of the MOU dated 20 th January, 2016.

They read as under:-

A. KCTNL was set up with equity interest of 60:40 between Kohinoor Group and IL and FS Group and is developing a mixed use real estate project to be called as "Kohinoor Square", Kohinoor Square comprises commercial and residential units, Kohinoor Square has saleable area 1:40 million square feet including area already sold to third parties.

B. KCTNL has entered into non-binding arrangement with Blackstone (as defined herein) (Non-Binding Arrangement) who propose to acquire specified commercial area of 0.74 million square feet for a consideration of Rs. 13,500 mn in Kohinoor Square. Subsequently, KCTNL has also received proposal from other Potential Investors to purchase the above area at aggregate consideration of Rs. 14,500 mn and is under final stage of negotiation.

C. Out of the aggregate 0.74 million square feet commercial area, KCTNL has already allocated in aggregate area of 278,789 square feet to IL & FS Group and as more particularly described in Annexure I hereto

Vishal Parekar, P.A. ...18

sj-44-2019.doc

(IL & FS Group Area).

D. In addition to the above exposure, IL & FS Group has exposure in the form of Loans extended to the Kohinoor Group for the purpose of construction of Kohinoor Square. The aggregate exposure of the IL & FS Group to KCTNL is Rs. 9,550 mn as per Annexure II enclosed hereto (IL & FS Group Exposure).

E. The Aggregate Exposure of IL & FS Group and Kohinoor Group (after netting off indirect Exposure of IL & FS Group) to the Kohinoor Square is as under:

                Particulars          Current   Existing   Realignment      Excess
                                    Exposure    Ratio     of Exposure     Exposure
                 Kohinoor            4,110      30.5%        4,110             -
                  Group
                  IL & FS            9,550      69.5%        2,740           6,810
                   Group
                                     13,660    100.0%        6,850           6,810


F. KCTNL to utilise the Sale Proceeds of the project so as to realign the Exposure of IL & FS Group and Kohinoor Group in accordance with the equity interest. The realign process would require priority payment to the parties having excess exposure and its more particularly defined in Clause (5) of this MOU.

G. Kohinoor Group shall assign another Project to KCTNL in order to recoup the loss incurred by IL & FS Group in the Kohinoor Square more particularly defined under Clause (5) of this MOU.

H. KCTNL has requested IL & FS Group's co-operation to enable KCTNL to conclude the Divestment Deal (as defined herein). The parties are therefore entering into this MOU to record the non-binding understanding amongst the parties.

I. Definations :-

... ....

(f) IL & FS Group Loans : shall mean the loans provided by IL & FS Group to Kohinoor Group.

(g) Non-Binding Agreement: shall have the same meaning as assigned to it in Recital B.

Vishal Parekar, P.A.                                                                         ...19





                                                                                          sj-44-2019.doc




(h) Sale Proceeds : shall mean proceeds of Rs. 14,500 mn to be received by KCTNL from Blackstone or Potential investors pursuant to the Demerger Scheme.

3. Application of Sale Proceeds on Approval of Demerger:-

(a) Immediately upon receipt by KCTNL of Sale Proceeds from Blackstone or Potential investor towards demerger of the Commercial Area from KCTNL and transfer to Blackstone or Potential Investor pursuant to the Demerger Scheme, KCTNL shall apply the sale proceeds in the following manner.

                                    Particulars                      Inflow       Outflow
                Proceeds of Divestment Deal                          14,500
                Utilization of the Proceeds
                Repayment of Banks Borrowing including                             6,300
                interest
                Amount set aside          for     Completion   of                  1,300
                Commercial Project
                Payout to IFIN & ITNL towards their                                5,855
                respective area
                Part payment of IL & FS Group Loans                                1,045
                Total                                                14,500       14,500


(b) KCTNL shall comply with all applicable laws in connection with the utilization of Sale Proceeds, including compliance with Section 185 and section 186 of the Companies Act, 2013.

(c) Post divestment of the commercial project, KCTNL would be left with residential project, proceeds from the sale of residential project would be used for repayment of liabilities and residual equity interest.

... .....

6. Parties Intentions and Compliance :-

Except for the Confidentiality provision (Clause 3), Duration and Termination provision (Clause 5) and Miscellaneous provisions (Clause 9), this MOU is only a statement of intent and does not set forth any legally or binding duties and obligations under any applicable law

Vishal Parekar, P.A. ...20

sj-44-2019.doc

with respect to either party. The parties are not obliged to consummate or complete any transaction under or with reference to this MOU.

In the event that any of the activities envisaged under this MOU fail to materialize or not achieved, none of the parties shall have any obligation or liability (as a matter of contract, tort or otherwise) to the other party with respect to or arising out of or in connection with the maters contemplated under this MOU for any direct or indirect or consequential or economic loss, damages, costs, expenses or any other claim for compensation of any other party.

7. Duration and Termination :-

This MOU shall continue for a period of 1 year from the date of this MOU unless terminated earlier by delivery of 3 (three) months' prior written notice by either Party to the other.

... .....

                                     Annexure II
                        Details of IL & FS Group Exposure
                       Particulars      Equity in    Kohinoor     Loan to       Total
                                        Kohinoor      Square     Kohinoor
                                         Square      Property     Group


                   IL & FS Group             2,000      5,855         1,695     9,550
                   Exposure Total



34. The crucial question that wrenches to the fore is whether the

aforesaid MOU even if construed in the manner the defendants

desire the Court to do, subsumes the transaction in question in its

fold. Indisputably, the said MOU so far as it related to the executory

part namely de-merger of KCTNL and transfer of the assets to

Blackstone or any other prospective purchase did not

Vishal Parekar, P.A. ...21

sj-44-2019.doc

materialize. What the defendants can legitimately draw upon is the

statement of facts contained in the said MOU. Evidently, the said

MOU records the exposure of IL & FS Group into Kohinoor Group to

the tune of Rs. 9550 million as of 20 th January, 2016. Indisputably,

the amounts in question were advanced on 5 th January, 2018 and

20th June, 2018. Whether the said advances were in continuation of

the same operandi, is the question.

35. On first principles, in my view, in the absence of any material

show the nexus between the transactions in question and the

transactions evidenced by the MOU, it would be audacious to draw

an inference merely on the basis of past transactions. Attendant

circumstances, undoubtedly, play a role. Those circumstances,

manifested in the execution of the loan agreement, personal

guarantee and pledge agreement run to the contrary. The nature of

the transactions and the jural relationship brought about by these

documents, is to be inferred from the contract between the parties

as evidenced by those documents.

36. On a cumulative reading of the aforesaid documents, it

becomes evident that the loan was advanced for the cluster

development project at Mahim, Macchimar Nagar. This

Vishal Parekar, P.A. ...22

sj-44-2019.doc

disentangles the transaction from the Kohinoor Square Project,

which the MOU was primarily concerned with. Secondly, the letter

dated 27th December, 2017 under which the loan was sanctioned

explicitly records that there were existing loan facilities to the tune

of Rs. 1200 million by IFIN to Kohinoor Housing Development

Project Limited. Prima facie, it appears to be a historical fact and

shows the relationship between the parties. Thirdly, the borrower

was not shown to be a part of the group companies which

represented the Kohinoor Group in the MOU dated 20 th January,

2016. The matter would be required to be stretched too far to bring

each and every transaction which takes place between the entities

of IL & FS and Kohinoor Group within the ambit of MOU dated 20 th

January, 2016, whatever be the length of time and the nature of

transaction. Such construction of the contract between the

Corporate entities cannot be countenanced. The intent of the

parties to a commercial contract is required to be ascertained

primarily from the terms of the contract.

37. I, therefore, find it difficult to accede to the submission on

behalf of defendant No. 1 and 2 that they are entitled to an

unconditional leave to defend the suit on the count that the

transaction in question also represents quasi equity infusion by the

Vishal Parekar, P.A. ...23

sj-44-2019.doc

IL & FS Group into Kohinoor Group.

38. The defendant Nos. 1 and 2, however, deserve an opportunity

to contest the suit. The defence sought to be raised by defendant

Nos. 1 and 2 cannot be totally brushed aside as vexatious and sham.

In the facts of the case, even if the probability of the defence may be

questioned yet the defendants cannot be deprived of the

opportunity to contest the suit. A conditional leave would, thus, be

in order.

39. The case of defendant No. 3 stands on a different footing.

Defendant No. 3 has executed a pledge agreement. The schedule

appended to the pledge agreement indicates that the defendant No.

3 has pledged all the shares of Kohinoor Planet Constructions

Private Limited (KPCPL). The defendant No. 3 is, however,

professed to be held personally liable for the debt, on the strength of

the recitals in the pledge agreement, as a guarantor.

40. Dr. Saraf placed reliance on the following covenants in the

pledge agreement.

5.1 Affirmative Covenants by the Pledgor :-

During the currency of this Agreement, the Facility Agreements and until the Borrowers' Dues payable by

Vishal Parekar, P.A. ...24

sj-44-2019.doc

the Borrowers to IFIN remains outstanding, the Pledgor shall:

.... .....

(g) be jointly and severally liable as principal debtors without exclusion/ preference to the other or others of them for the payment of the Borrowers' Dues to IFIN and IFIN shall be entitled to recover at its option the amounts due in respect thereof from the Pledgors without exercising or exhausting any other remedy/right it has against the Borrowers. .... .....

6.2 Remedies :-

.... ......

(b) Sale of Pledged Securities :-

..... ........ In case, the proceeds of sale or disposal of the Pledged Securities are not sufficient to pay/ repay the Borrowers' Dues to IFIN, the Borrowers and the Pledgors bind themselves and undertake to make good the deficit immediately on being required to do so by IFIN.

41. Dr. Saraf would urge that the aforesaid covenants would

indicate that the pledge agreement does not evidence a pledge

simpliciter. It also constitutes a guarantee furnished by defendant

No. 3. The nomenclature of the documents is not decisive and,

therefore, the defendant No. 3 can be said to have undertaken the

liability to discharge the entire debt in the event of default on the

part of borrower/ defendant No. 1.

42. Dr. Saraf placed a strong reliance on a Division Bench

judgment of this Court in the case of Il & FS Financial Services

Vishal Parekar, P.A. ...25

sj-44-2019.doc

Limited vs. Vandana Global Limited7. Construing the terms of the

Article II, Put Option therein, the Division Bench held that the

petitioner therein irrevocably, absolutely and unconditionally

agreed with and undertook to IFIN that in the event of the

occurrence of an Event of Default under the Facility Agreement

IFIN may, at its discretion, issue the Put Notice; and upon the

receipt of the Put Notice VGL and VL shall, without demur or

protest, make payment of the Exercise Price to IFIN and accept by

way of assignment from IFIN the Facility along with all rights and

liabilities thereunder.

43. The aforesaid decision, with respect, turns on the

construction of particular instrument in the said case. It is trite a

document is required to be read as a whole. To gather the real

intention of the parties, the terms and stipulations in an instrument

cannot be read torn out of context. Undoubtedly, the parties are free

to enter into a contract which gives rise to multiple jural

relationships. In a given case, an instrument of pledge may also

operate as a guarantee. However, such intention of the parties must

be borne out by the instrument and the attendant circumstances.

44. The pledge agreement, in the instant case, primarily deals 7 Company Petition No. 923/2015, Dt. 05/01/2018

Vishal Parekar, P.A. ...26

sj-44-2019.doc

with the pledged securities, the rights and obligations of the

pledgor, the covenants of the pledgor and the consequences which

would ensue in the event of default. The lender is empowered to sale

the pledged securities.

45. On a fair reading of the pledge agreement, as a whole, I find it

difficult to accede to the submission on behalf the plaintiff that the

pledge agreement also constitutes a contract of guarantee. The

aforesaid recitals in the agreement that the pledgors shall be jointly

and severally liable as principal debtors and bind themselves and

undertook to make good the deficit in case the proceeds of the sale

or disposal of the pledged shares are not sufficient to discharge the

debt are required to be considered in context in which the parties

entered into the contract.

46. In the letter dated 27th December, 2017 under which the loan

was sanctioned it was specifically mentioned that the loan was

secured by (a) Demand Promissory Note (b) Personal Guarantee of

defendant No. 2 and (c) First Ranking Pari Pasu pledge of 100%

equity shares of Kohinoor Planet Constructions Private Limited in

demat form together with all accretions thereon. Few things become

abundantly clear. First, the loan was secured by the personal

Vishal Parekar, P.A. ...27

sj-44-2019.doc

guarantee of defendant No. 2. Second, the plaintiff had not insisted

for personal guarantee by defendant No. 3. Third, the loan was

agreed to be secured by pledge of 100% equity shares of KPCPL. It

was nowhere in the contemplation of the parties that defendant No.

3 would also act as a guarantor. This prima facie militates against

the plaintiff's claim that the pledge agreement also operated as a

personal guarantee. In any event, the defendant No. 3 deserves an

opportunity to contest the suit on the ground that her liability was

confined to that of being a pledgor and not a guarantor.

47. The upshot of the aforesaid consideration is that the

defendant No. 3 deserves an unconditional leave to defend the suit.

48. This propels me to the aspect of the conditions subject to

which leave to defend is required to be granted to defendant Nos. 1

and 2. Since the advance of the sum of Rs. 14,97,78,218/- is

incontestable and what the defendants contest is the character of

the said amount and the funds out of which the said amount was to

be repaid, in my view, the defendant Nos. 1 and 2 must be directed

to deposit the said amount in the Court. Since the character of the

said advance is the bone of contention, at this juncture, a direction

to deposit the said amount along with interest may not be

Vishal Parekar, P.A. ...28

sj-44-2019.doc

justifiable. I am, therefore, persuaded to hold that the defendant

Nos. 1 and 2 deserve leave to defend the suit subject to deposit of

the principal amount of Rs. 14,97,78,218/-.

Hence, the following order:

ORDER

1] The defendant Nos. 1 and 2 are granted leave to

defend the suit subject to deposit of the sum of Rs.

14,97,78,218/- in this Court within a period of six

weeks from today.

2] If the aforesaid deposit is made within the

stipulated period, this suit shall be transferred to the

list of Commercial Causes and the defendant Nos. 1

and 2 shall file written statement within a period of

six weeks from the date of deposit.

3] If this conditional order of deposit is not

complied with, within the above stipulated period,

the plaintiff shall be entitled to apply for an ex-parte

decree against the defendants Nos. 1 and 2 after

obtaining a non-deposit certificate from the

Vishal Parekar, P.A. ...29

sj-44-2019.doc

Prothonotary and Senior Master of this Court.

4] The defendant No. 3 is granted an unconditional

leave to defend the suit.

5] The defendant No. 3 shall file the written

statement within a period of eight weeks from today.

6] Summons for Judgment stands disposed in the

aforesaid terms.



                                           (N. J. JAMADAR, J.)




Vishal Parekar, P.A.                                                              ...30





 

 
Download the LatestLaws.com Mobile App
 
 
Latestlaws Newsletter
 

Publish Your Article

 

Campus Ambassador

 

Media Partner

 

Campus Buzz

 

LatestLaws Guest Court Correspondent

LatestLaws Guest Court Correspondent Apply Now!
 

LatestLaws.com presents: Lexidem Offline Internship Program, 2026

 

LatestLaws.com presents 'Lexidem Online Internship, 2026', Apply Now!

 
 

LatestLaws Partner Event : Smt. Nirmala Devi Bam Memorial International Moot Court Competition

 
 
Latestlaws Newsletter