Narayan Dhyanchandbhai Darji vs Mangal Buildhome Pvt Ltd And 12 Ors
2023 Latest Caselaw 2648 Bom

Citation : 2023 Latest Caselaw 2648 Bom
Judgement Date : 20 March, 2023

Bombay High Court
Narayan Dhyanchandbhai Darji vs Mangal Buildhome Pvt Ltd And 12 Ors on 20 March, 2023
Bench: G. S. Kulkarni, R. N. Laddha
pvr                                                   filefa66666e729ba119992c6792539446


              IN THE HIGH COURT OF JUDICATURE AT BOMBAY

                   ORDINARY ORIGINAL CIVIL JURISDICTION

                         WRIT PETITION NO. 5130 OF 2022

1. Raj M. Ahuja
2. Jain M. Ahuja                                             ... Petitioners

            Versus
1. The Municipal Corporation of Gr.Mumbai
through the Municipal Commissioner.
2. The Executive Engineer (Building
Proposals), Municipal Corporation of
Gr.Mumbai.                                                   ...Respondents

                  WRIT PETITION (LODG) NO.8486 OF 2022
                                  with
                 INTERIM APPLICATION (L) NO.1929 OF 2023
                                  with
                 INTERIM APPLICATION (L) NO.1323 OF 2023

M/s.Mangal Buildhome Pvt.Ltd.                                ...Petitioner
              Versus
The State of Maharashtra & Ors.                              ...Respondents

Mr.Ashish Kamat, Senior Advocate with Mr.Mayur Khandeparkar with
Ms.Pooja Kane-Kshirsagar, Mr.Jitendra Jain, Mr.Laxman Jain, Rohit
Bamne i/b. Yogesh Adhia, for Petitioners in WP 5130/22

Mr. Mayur Khandeparkar a/w Mr. Rajesh Sharma, Ms.Tehashree Paraz i/
b Rajesh Sharma & Associates for Petitioner in WPL/8486/2022

Mr.Amarendra Mishra for Respondent Nos.3 to 9 in WP 5130/22.

Mr. S. K. Pise with Shahin K. Sayed for Applicant in IAL/1929/2023 and
1323/2023 and for R. No. 7 and 9 in WPL/8486/2022.

Mr.Sukanta Karmakar, AGP for Respondent No.1 State in WPL 8486/22.

Mr. A. Y. Sakhare, Senior Advocate a/w Ms. Vandana Mahadik for

                                         1 of 33
                                 -------------------------




::: Uploaded on - 20/03/2023                             ::: Downloaded on - 22/03/2023 12:02:24 :::
 pvr                                                      filefa66666e729ba119992c6792539446


MCGM in WPL/8486/2022

Mr.Dharmesh Vyas with Ms.Vandana Mahadik, for MCGM in WP
5130/22.


                               _______________________

                         CORAM:           G. S. KULKARNI &
                                          R. N. LADDHA, JJ.

Reserved on: MARCH 15, 2023

Pronounced on : MARCH 20, 2023 _______________________

JUDGMENT: (Per G.S.Kulkarni, J.)

1. These are petitions under Article 226 of the Constitution of India,

concerning redevelopment or construction of new buildings. The

existing buildings were demolished, after being declared dilapidated and

dangerous, and were facing action for their demolition under Section

354 of the Mumbai Municipal Corporation Act,1888 (for short 'the MMC

Act').

2. A short question of contemporary importance, which arises for

determination in these petitions is as to whether the Municipal

Corporation for Greater Mumbai (for short 'MCGM') would be justified

in imposing a condition that the owner/landlord who intends to

undertake redevelopment of a demolished building, is required to obtain

2 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

100% consent of all the erstwhile tenants/occupants, by submitting to

the MCGM, 'permanent alternate accommodation agreements', executed

with all the tenants, as a condition for issuance of a commencement

certificate (CC), stated to be mandated by Clause 1.15 of the

"Guidelines issued by the MCGM for declaring private and municipal

buildings as 'C-1' category (Dangerous, Unsafe)" (for short "the 2018

Guidelines") and a similar consequential condition in the Intimation of

Disapproval (IOD).

3. For convenience, we refer to the facts in the first Petition (Raj M.

Ahuja & Anr. Vs. The Municipal Corporation of Gr.Mumbai & Ors.).

4. The petitioners are owners of land bearing Survey No.113(part)

and Survey No.114(part) and bearing CTS No.89/A, 89/A 1 to 13 of

Village Pahadi Eksar, Taluka Goregaon, situated at Jay Prakash Nagar

Road No.2, Goregaon (East), Mumbai. There was an existing building

on such land, having ground plus one upper floor known as 'Madhu

Estate' having an industrial user. It housed 39 industrial units. There

were 17 tenants on the ground floor. Respondent Nos. 3 to 9 are some

of the tenants out of the 17 tenants.

3 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

5. It is not in dispute that on 22 July 2017, MCGM had issued a

notice to the petitioners under Section 354 1 of the MMC Act. Also the

Technical Advisory Committee (TAC) of the MCGM had inspected the

petitioners' building and had declared the same to be dangerous falling

within 'C-1' category. Consequent to such notice, the petitioners

requested the occupants / tenants to vacate the subject building. On 26

December 2017 the MCGM had prepared a list of

tenants/occupants/owners occupying the units, alongwith the carpet

area statement, of each of the units, in the building, which forms part of

the record of the MCGM. After all the formalities were completed, in

December 2017, the MCGM demolished the building.

6. Out of the 39 units housed in the building, 22 units were on the

first floor which were owned by the erstwhile owners of the building

and some of which were let out on leave and licence to third parties.

There is no dispute in regard to any rights being claimed by any third

parties in respect of those 22 units. The remaining 17 units which were

on the ground floor, were in occupation of the tenants. Out of said 17

units, two tenants surrendered their rights in favour of the petitioners.

There is an eviction decree passed against four tenants, the proceedings

1 Sec.354. Removal of structures, etc., which are in ruins or likely to fall.

4 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

in that regard are sub-judice before the Small Causes Court at Mumbai.

Out of the 17 units, in regard to 5 units the petitioners have entered into

agreements/consent terms for permanent alternate accommodation. A

suit for eviction has been filed by the petitioners against one of the

tenants on the ground of sub-letting, which is pending before the Small

Causes Court. Also, there are suits filed by the petitioners against the

tenants in respect of 6 units, which are stated to be pending before the

Small Causes Court. Thus, there are only 7 occupants (Respondent

Nos.3 to 9) who are the disputing occupants, who are not ready and

willing to enter into a permanent alternate accommodation agreement

(for short "PAAA"). They are stated to be the non-consenting members.

7. The case of the respondent Nos.3 to 9 is to the effect that they are

entitled for a permanent alternate accommodation only in an industrial

building which they contend would be in accordance with the guidelines

laid down by a Division Bench of this Court in Writ Petition (L) No.1135

of 2014 (finally numbered as Writ Petition No.1080 of 2015). In short,

such respondents, are not consenting to the petitioners undertaking a

redevelopment, unless the nature of the rights being asserted by them

are recognized by the petitioners. These respondents have also filed a

civil suit before the City Civil Court at Mumbai, on 4 September 2018

5 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

asserting such rights being Long Cause Suit No.2601 of 2018 interalia

praying for the following reliefs:-

"a) That this Hon'ble Court be pleased to declare/direct that the Plaintiffs are entitle for Permanent Alternate Accommodation, free of cost on the Suit Plot, in accordance/compliance of the guidelines laid down by the Hon'ble High Court in W.P. (L) 1135 of 2014.

b) That this Hon'ble Court be pleased to declare that the Reply Notice dt. 09/05/2018 addressed by the Defendant No.1 & 2's Advocate, disputing the rights of the Plaintiffs for Permanent Alternate Accommodation on the Suit Plot, is non-est, illegal, bad-in-law and is contrary to the guidelines laid down by the Hon'ble High Court in W.P. (L) 1135 of 2014.

c) That this Hon'ble Court be pleased to grant Permanent Injunction against the Defendant No. 1 to 7 and/or their servants, agents, persons, body, associations, company or attorney, claiming through them, be restrained from making any construction/ development/redevelopment of the Suit Plot in any manner, whatsoever, without written consent of the Plaintiffs as envisaged by the Hon'ble High Court in W.P.(L) No.1135 of 2014.

d) That this Hon'ble Court be pleased to grant Permanent Injunction, thereby restraining the Defendant No.8 Corporation from issuing any development/redevelopment permissions of the Suit Plot, in favour of the Defendant no.1 to 7 or any persons/associations claiming through them, without following the due process of law, more particularly, without written consent of the Plaintiffs, as envisaged by the Hon'ble High Court in W.P.(L) No.1135 of 2014.

e) That this Hon'ble Court be pleased to grant Temporary Injunction against the Defendant No. 1 to 7 and/or their servants, agents, persons, body, associations, company or attorney, claiming through them, be restrained from making any construction/ development/redevelopment of the Suit Plot in any manner, whatsoever, without written consent of the Plaintiffs as envisaged by the Hon'ble High Court in W.P.(l)

6 of 33

-------------------------

 pvr                                                       filefa66666e729ba119992c6792539446

                 No.1135 of 2014.

f) That this Hon'ble Court be pleased to grant Temporary Injunction, thereby restraining the Defendant No.8 Corporation from issuing any development/ redevelopment permissions of the Suit Plot, in favour of the Defendant No.1 to 7 or any persons/associations claiming through them, without following the due process of law, more particularly, without written consent of the Plaintiffs, as envisaged by the Hon'ble High Court in W.P.(L) No.1135 of 2014.

g) That pending the hearing and final disposal. of the present Suit, the Defendant No. 1 to 8 be directed to maintain 'Status- Quo' in respect of the Suit Plot.

h) Ad-interim or interim reliefs in terms of prayer clause (e), (f) & (g) be granted.

i) For the cost of the Suit."

8. These respondents, however, could not get any interim orders in

such civil suit, so as to restrain the petitioners and the MCGM from

granting any IOD/commencement certificate in favour of the petitioners.

9. The petitioners have contended that, being confronted with a

situation that in the redevelopment being undertaken by them,

construction of a 'industrial building', on the said land was not

economically viable under the prevailing Development Control and

Promotion Regulations-2034 (for short 'the DCPR-2034'). This for the

reason that the DCPR-2034, does not provide for utilization of either

"additional FSI" or "admissible TDR" in the industrial zone as per the

7 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

DCPR Regulation 30 - Table 12. The petitioners state that it was thus

not economically viable to construct one building for industrial user and

another for residential user, and the only method under which the

redevelopment project was viable, was to construct a single residential

building, in which the erstwhile eligible occupants/tenants could be

offered an alternative residential accommodation of an equal size / area

on tenancy basis, subject to the outcome of the eviction suits filed by the

petitioners. The petitioners accordingly approached the MCGM for

change of the zone from 'industrial' to 'residential' which was granted in

favour of the petitioners by the MCGM on 21 April 2022. It is

petitioners case that they have also made a provision for accommodating

the non-consenting tenants, by reserving for them a residential alternate

accommodation, in lieu of the units occupied by them in the building to

be constructed.

10. In the above circumstances, the petitioners submitted plans for

the proposed redevelopment with the MCGM. In pursuance thereto, on

16 June 2022, the MCGM issued to the petitioners an Intimation of

Disapproval (IOD), however, with Condition No.39 and Note Nos. 20

and 21 which are objected by the petitioners. As the controversy in the

present proceedings interalia revolves around these conditions, which

8 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

are based on the 2018 Guidelines as issued by the MCGM, it would be

appropriate to note Condition No.39 alongwith Notes 20 and 21, which

read thus:-

"Conditions .........

39. Existing structure proposed to be demolished shall not be demolished or necessary Phase Programme with agreement will not be submitted & got approved before C.C."

Notes ..... .....

20) The Intimation of Disapproval is given exclusively for the purpose of enabling you to proceeds further with the arrangements of obtaining No Objection Certificate from the Housing Commissioner under Section 13 (h) (H) of the Rent Act and in the event of your proceeding with the work either without an intimation about commencing the work under Section 347(1) (aa) or your starting the work without removing the structures proposed to be removed the act shall be taken as a severe breach of the conditions under which this Intimation of Disapproval is issued and the sanctioned will be revoked and the commencement certificate granted under Section 45 of the Maharashtra Regional and Town Planning Act 1966, (12 of the Town Planning Act), will be withdrawn.

21. If it is proposed to demolish the existing structures after the negotiations with the tenant, under the circumstances, the work as per approved plans should not be taken up in hand unless the City Engineer is satisfied with the following:-

i. Specific plans in respect of evicting or rehousing the existing tenants on hour stating their number and the areas in occupation of each.

ii. Specifically signed agreement between you and the existing tenants that they are willing to avail or the alternative accommodation in the proposed structure at standard rent.

Iii. Plans showing the phased programme of constructions has to be duly approved by this office before starting the work so as not to contravene at any

9 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

stage of construction, the Development Control Rules regarding open spaces, light and ventilation of existing structure."

(emphasis supplied)

11. It is the petitioner's case that after issuance of the IOD, although

respondent Nos.3 to 9 were minority unit-holders in the building which

was demolished, and who were not consenting for residential

redevelopment, the petitioners offered them an equivalent area of

residential accommodation. However, respondent Nos.3 to 9 did not

respond to such offer of the petitioners. In these circumstances, the

petitioners by their letter dated 28 June 2022, as addressed to the

MCGM requested that a commencement certificate be issued, interalia

pointing out that out of 32 unit-holders who were 82% of the unit-

holders/tenants, and who were having about 77% of the carpet area

occupied in the subject building, were agreeable to accept the

petitioners' offer of an alternate residential accommodation being

provided, in lieu of their service industrial units. The petitioners also

recorded that respondent Nos.3 to 9 were not agreeable to similar offers

made by the petitioners. The petitioners also recorded that a provision

was made for accommodating these non-consenting unit-holders by

reserving for them, equivalent alternate accommodation in the proposed

residential building, in lieu of the units occupied by them in the

10 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

demolished building. The petitioners also forwarded to the MCGM a

legal opinion dated 25 July 2022, to the effect that in view of the

majority of the occupants having consented for the proposal, the MCGM

was required to proceed to issue a commencement certificate (CC),

without insisting on a condition of 100% of the tenants agreeing, and/or

permanent alternate accommodation agreements being entered with all

the tenants. As there was no response to the petitioners' request for

issuance of commencement certificate, the petitioners have approached

this Court by the present proceedings, which were filed on 10 August

2022. The petitioners have prayed for the following reliefs:-

"(a) This Hon'ble Court be pleased to declare that Clause 1.15 of the Impugned Guidelines (being Exhibit L hereto) requiring consents/agreements from all the tenants/occupants, is illegal and bad in law, also violative of Article 14 of the Constitution of India, being arbitrary, unreasonable, capricious, impracticable and discriminatory, and this Hon'ble Court be pleased to strike down the same.

(b) This Honourable Court be pleased to issue a Writ of Mandamus, or any other Writ or Order in the nature of Mandamus, ordering and directing the Respondent Nos.1 and 2 to treat the consents of 32 unit holders/occupiers as a sufficient compliance of Condition No. A - 39 and Notes 20 and 21 of Intimation of Disapproval bearing No. CHE/WSII/5566/P/S/337 (NEW)/IOD/1/New dated 16" June 2022;

(c) Pending the hearing and final disposal of the present petition, the Respondent Nos.1 and 2 be directed to issue further permissions, including Commencement Certificate to the Petitioners for redevelopment of the said property, namely, plot of land or ground bearing CTS No.89/A, 89 A 1 to 13 of Village Pahadi Eksar, Taluka Goregaon and admeasuring about 3333.6 sq. yards equivalent to 2,787.32 Sq. mtrs. in the registration District and Sub District of Mumbai City and Mumbai Suburban;

(d) Pending the hearing and final disposal of the present

11 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

Petition, this Honourable Court be pleased to issue a mandatory interim order directing the Respondent Nos.1 and 2 to not to insist upon the consents of/agreements with all the tenants/occupants as a precondition for grant of development permissions including Commencement Certificate to the Petitioners for redevelopment of the said property, namely, plot of land or ground bearing CTS No.89/A, 89/A 1 to 13 of Village Pahadi Eksar, Taluka Goregaon and admeasuring about 3333.6 sq. yards equivalent to 2,787.32 Sq. mts. in the registration District and Sub District of Mumbai City and Mumbai Suburban;

(e) Ad-interim reliefs in terms of prayer clauses (c) and (d) be granted to the Petitioners;

(f) For the costs of the present Petition; and

(g) For such other and further reliefs, as the nature and circumstances of the case may require and this Hon'ble Court may deem appropriate.

12. As seen from the petition, the primary grievance of the petitioner

is in regard to Clause 1.15 of the 2018-Guidelines issued by the MCGM

and the effect of such clause as incorporated in clause 39, and Condition

21(ii) of the Notes as contained in the IOD. The contention of the

petitioners is that the MCGM is interpreting these clauses to mean that

the petitioner is required to have a permanent alternate accommodation

agreement (PAAA) with 100% of the tenants and only after such

agreements are entered between the petitioners and the tenants, a

commencement certificate would be issued.

13. The petitioners contend that the basis for incorporating Condition

21(ii) in the IOD are the 2018-Guidelines ("Guidelines issued by the

12 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

MCGM for declaring private and municipal buildings as C-1 category") ,

under which, clause No.1.15 stands incorporated to provide that the

MCGM while granting a sanction to the redevelopment, the zonal

building proposal department shall include a condition in the 'Intimation

of Disapproval (IOD)' that unless and until an agreement either

providing a permanent alternate accommodation in the newly

constructed building or a settlement is arrived at by and between the

tenants and /or occupiers and landlord, no Commencement Certificate

(C.C.) will be issued under Section 45 of the MRTP Act. Clause 1.15 in

the 2018-Guidelines reads thus:-

"1.15) The corporation shall, while granting the sanction for redevelopment, the zonal building proposal department shall include a condition in intimation of Disapproval (IOD) that "unless and until an agreement either providing a permanent alternate accommodation in newly constructed building or a settlement is arrived at by and between the tenants and / or occupier and the landlord, no Commencement Certificate (C.C) will be issued under section 45 of M.R&T.P Act 1966."

14. It is the legality of Clause 1.15 which is challenged by the

petitioners interalia contending that the same is arbitrary, unreasonable,

impracticable, discriminatory and being violative of Article 14 of the

Constitution. In making such prayer, the petitioners contend that it may

not be always conceivable that 100% tenants agree for the

redevelopment being undertaken by the owners of the land, or it is

13 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

likely that the tenants/occupants impose a counter condition and/or for

some other reasons they are not agreeable to enter into a permanent

alternate accommodation agreement. It is thus submitted that to have a

pre- condition of the owners/developers requiring to enter into PAAA

with 100% of the tenants for grant of a commencement certificate,

would create serious consequences interalia of the project itself being

brought to a stand-still by a minority/minuscule number of tenants or

members of a co-operative society. It is submitted that merely because

there is an opposition on some issues, by some tenants, it cannot result

in the project being delayed, causing a serious prejudice to the other

occupants of the building, the owners and other stakeholders. It is thus

the petitioners' case that such condition as interpreted by the MCGM in

clause 1.15 of the 2018-Guidelines and the impugned conditions as

incorporated in the IOD issued to the petitioners, are required to be held

to be arbitrary and illegal.

15. On the other hand, on behalf of the MCGM, the impugned

conditions as incorporated in the IOD as also Condition No.1.15 of the

2018 Guidelines, are sought to be justified on the ground that it is

incumbent on the Corporation to safeguard the interest of the tenants.

This more particularly, considering the orders dated 23 June 2014

14 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

passed by the Division Bench of this Court in Writ Petition (lodg)

No.1135 of 2014 (Municipal Corporation for Gr. Mumbai vs. State of

Maharashtra & Ors.) whereby in the absence of any policy guidelines the

Division Bench by an interim order had formulated guidelines which are

now incorporated by the MCGM in the 2018-Guidelines. It is submitted

that in the present case all the tenants have not submitted their consent

as respondent Nos.3 to 9 have not consented to the redevelopment, as

also a permanent alternate accommodation agreement was not entered

with them by the petitioners. It is hence submitted that the MCGM was

justified in not issuing a commencement certificate to the petitioners.

Analysis

16. On the above conspectus, we have heard learned Counsel for the

parties, we have perused the record. As noted by us, Condition 39 of

the IOD and Condition Nos.20 and 21(ii) as contained in the Notes

under the IOD as also Clause No.1.15 of the 2018 Guidelines, are

impugned by the petitioners. On a plain reading of such conditions and

of clause 1.15 of the 2018 Guidelines, it is quite clear that the zonal

building proposal department, needs to include a condition in the

Intimation of Disapproval (IOD), that unless and until an agreement

either providing for a permanent alternate accommodation in the newly

15 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

constructed building or a settlement is arrived at by and between the

tenants and / or occupier and the landlord, no Commencement

Certificate (C.C) would be issued under section 45 of M.R&T.P Act

1966. Thus, the MCGM requires consent of 100% tenants to be

submitted by the owner/landlord or the developer to the municipal

corporation, for the owner/landlord to become eligible for issuance of a

commencement certificate.

17. It appears that the basis of such stand as taken by the MCGM is

firstly on account of the interim order dated 23 June 2014 passed by a

Division Bench of this Court in the case of Municipal Corporation for Gr.

Mumbai vs. State of Maharashtra & Ors. (Writ Petition (l) No.1135 of

2014 )(supra). The said proceedings were filed by the MCGM making

prayers against the State of Maharashtra and the concerned police

personnel, to have forcible eviction of the occupants of a building known

as "Sohansingh Mansion" as also other buildings which are declared to

be dilapidated and dangerous by the MCGM and to issue appropriate

guidelines for removal of non-cooperating occupants of dilapidated and

dangerous buildings. In the said proceedings, the MCGM had contended

that it was necessary that guidelines be issued to the parties so as to

avoid any untoward incident of loss of lives of the occupants of the said

16 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

buildings, as well as occupants of the adjoining structures and passers-

by. It is in such context, considering the provisions of the MMC Act, the

Court issued guidelines as contained in paragraph 9(l) to 9(p) of the

said order, observing that such guidelines were necessitated essentially

to make Section 354 of the MMC Act effective and to ensure that human

lives are not in any manner compromised. Such guidelines as contained

in paragraph 9(l) and 9(p) of the said order passed by the Division

Bench read thus:

"9. Accordingly, for the present, in the absence of any policy in that behalf, the following guidelines are issued:- ... ... ..

(l) The rights of the tenants and/or occupiers and/or owners in respect of the said premises/property will not be affected by virtue of evacuation or demolition carried out by the Corporation of such dilapidated and dangerous building in exercise of the power under section 354 of the said Act or by virtue of the fact that the Corporation is the owner of the premises. Such tenant and/or occupier and/or owner will be entitled to re-occupy the premises in respect of the same area after the reconstruction of the building, subject to the prevalent provisions of law pertaining to redevelopment of the property or subject to any arrangement or agreement arrived at by and between such tenants and/or occupiers with the owner of the building. Any action of evacuation/removal / demolition will not affect the inter se rights of owners if there be more than one owner or there is a dispute as to the title of the property. .... ... ...

(p) In case privately owned buildings are demolished by the Corporation in exercise of power under Section 354 read with the present order, then the Corporation shall, while granting sanction of redevelopment, impose a condition in IOD (Intimation of Disapproval) that no Commencement Certificate will be issued under section 45 of the MRTP Act,1966 unless and

17 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

until an Agreement either providing a Permanent Alternate Accommodation in a newly constructed building or a settlement is arrived at by and between the tenants and/or occupiers and the landlord in respect of the said demolished premises, is filed with the Corporation at the earliest."

Thus, the Division Bench in the above order has observed that the

rights of the tenants and/ or occupiers and/or the owners in respect of

the said premises/property would not be affected by virtue of evacuation

or demolition carried out by the Corporation of such dilapidated and

dangerous buildings, in exercise of the power under section 354 of the

MMC Act or by virtue of the fact that the Corporation is the owner of the

premises. It was interalia observed that a tenant/occupier and/or owner

will be entitled to re-occupy the premises of the same area after the

reconstruction of the building, subject to the prevalent provisions of law

pertaining to redevelopment of the property or subject to any

arrangement or agreement arrived at by and between such tenants and/

or occupiers, with the owner of the building. It was also observed that

any action of evacuation /removal / demolition will not affect inter se

rights of owners if there be more than one owner or there is a dispute as

to the title of the property. It was also observed that in case privately

owned buildings are demolished by the MCGM in exercise of powers

under Section 354, read with the said order passed by the Division

18 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

Bench, then the MCGM while granting sanction for redevelopment, shall

impose a condition in the Intimation of Disapproval (IOD) that no

'Commencement Certificate' will be issued under section 45 of the MRTP

Act,1966 unless and until an Agreement either providing for a

Permanent Alternate Accommodation in a newly constructed building or

a settlement is arrived at by and between the tenants and/or occupiers

and the landlord, in respect of the said demolished premises, and the

same is submitted to the Corporation. It is exactly as what has been

observed by the Division Bench in paragraph 9 Clause (l) and (p) of its

order dated 23 June 2014 finds recognition in Clause 1.15 of the 2018-

Guidelines for declaring private and Municipal buildings as C-1 Category

(Dangerous, Unsafe).

18. As noted above the 2018-Guidelines were issued under the

interim orders dated 23 June 2014 passed by this Court in the

"Municipal Corporation for Gr. Mumbai vs. State of Maharashtra & Ors."

(supra). The said writ petition was finally disposed of by judgment and

order dated 28 February 2018 passed by a Division Bench of this Court.

The said judgment in paragraph 3 has observed that an affidavit was

filed on behalf of the MCGM dated 8 February 2018, interalia stating

that the MCGM had framed guidelines for declaring private and

19 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

municipal buildings as falling in 'C-1' category (Dangerous/Unsafe). It

was stated that such guidelines were approved by the Municipal

Commissioner. The Court observed that at the earlier hearing of the

said proceedings, on behalf of the MCGM a note dated 22 February

2018 signed by the Director (E.S.&P) and Chairman of the Technical

Advisory Committee (TAC), was tendered across the bar. Such note was

also approved by the Municipal Commissioner on 23 February 2018. It

was observed that the policy annexed to the said affidavit as filed on

behalf of the MCGM, was amended to the extent provided in the said

note dated 22 February 2018. The Court observed that in view of the

policy guidelines which were placed on record by the said affidavit, it

was no longer necessary for the Court to exercise jurisdiction to issue

policy guidelines. The operative part of the said order passed by the

Division Bench in paragraph 28(9) observes that in view of the policy

guidelines which were placed on record, it was also not necessary for

the Court to continue interim order dated 23 June 2014, as the

Municipal Corporation was bound to follow its own policy guidelines. It

was observed that for exercising powers under Section 354 of the MMC

Act, from the date of the said judgment, the Municipal Commissioner

shall follow its own policy guidelines as the interim directions were no

longer operative. The relevant paragraphs of the said order are required

20 of 33

-------------------------

 pvr                                                      filefa66666e729ba119992c6792539446


to be noted, which reads thus:

                 "4      We have perused the said policy which lays down an

elaborate procedure to be followed before issuing a notice under Section 354 of the said Act of 1888. In this Petition, we are not called upon to go into the question of legality and validity of the contents of the said policy. But suffice it to say that policy as amended on 23rd February 2018 by the Municipal Commissioner is binding on the Municipal Corporation.

5 The necessity of passing interim order dated 23 rd June 2014 was the absence of a policy or guidelines. That is very clear from the observations made in the paragraph 8 of the said order. In view of the policy guidelines which are placed on record by the affidavit dated 8th February 2018 as modified on 23rd February 2018 now it is no longer necessary for this Court to exercise Writ Jurisdiction by issuing policy guidelines. ... ... ... ... ..

28 Our conclusions and the final directions are as under :

... ... .. ...

(ix) We make it clear that in view of the policy guidelines which are placed on record, it is not necessary for us to continue interim order dated 23rd June 2014 as the Municipal Corporation is bound to follow its own policy guidelines. Therefore, for exercising powers under Section 354 of the said Act of 1888 from the date of this Judgment, the Municipal Commissioner shall follow its own policy guidelines as the interim directions are not longer operative. We also make it clear that we have not examined the issue of legality and validity of the policy guidelines framed by the Municipal Corporation;"

19. In pursuance of the observations of this Court in "Municipal

Corporation for Gr. Mumbai vs. State of Maharashtra & Ors." (supra) the

'2018 Guidelines' were issued by the Municipal Corporation on 25 May

21 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

2018 (as signed by the Municipal Commissioner on the said date)

incorporating impugned clause No.1.15. As noted above, the grievance

of the petitioners is in regard to Clause 1.15 of the 2018-Guidelines to

the effect that clause 1.15 ought not to mean that consent from all the

tenants/occupiers of a dilapidated building is mandated for issuance of a

commencement certificate.

20. In our opinion, there is much substance in the contention as urged

on behalf of the petitioners, that Clause 1.15 cannot be interpreted to

mean that the consent of all the occupants/tenants or 100% consent of

the tenants/occupants in the manner as suggested in Clause 1.15 would

be necessary for a commencement certificate to be issued. This for more

than one reason. Firstly, it cannot be countenanced that once the

majority of the occupants / tenants are agreeable to vacate the building

and/or to accept the permanent alternate accommodation being offered

by the owner, by protecting their occupancy rights as they stood at the

time the building was demolished, it cannot be heard from minority of

such tenants/occupants, for whatever reasons, that they are not

agreeable to a settlement in this regard or resist a permanent alternate

accommodation as offered by the owner to the majority of the tenants /

occupants, for a reason that a permanent alternate accommodation does

22 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

not suit their requirements, or for some other reasons they are not

agreeable to enter into a PAAA, as in the present case. This would

amount to few tenants/ occupants bringing the entire redevelopment to

a standstill, by not consenting to a permanent alternate accommodation

or by raising disputes.

21. Certainly, it cannot be the intention of the Division Bench when it

passed the order dated 23 June 2014 issuing guidelines in the absence

of a policy of the MCGM, that the redevelopment project be put to a

standstill untill 100% of the tenants/occupants consent for

redevelopment, by accepting a permanent alternate accommodation.

Moreover it needs to be noted that the order dated 23 June 2014 was an

order in invitum at the behest of the MCGM and the State Government

as clear from the following contents of paragraph 3 of the said order

which reads thus:-

"3. Sometimes owners/builders are non-cooperative and fail to take care of their obligations. Sometimes tenants/occupants do not co-operate. Mere initiation of Civil and/or Criminal proceedings for the same is also of no use or effective mechanism to evacuate or evict immediately the non-cooperative tenants/ occupants/ owners. In view of the urgency expressed, we are inclined to pass the following order based upon the draft of minutes of order prepared and submitted by the Senior Counsel for the Petitioner- Corporation and approved by the State Government and MHADA. A copy of the draft of Minutes of Order is taken on record and marked "X" for identification."

23 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

22. It also clearly appears that the MCGM incorporated Clause 1.15 in

the 2018- Guidelines, pursuant to the same being formulated by the

Division Bench of this Court in its order dated 23 June 2014 (supra). In

such context, in our opinion, on a holistic reading of the guidelines as

formulated in the said order passed by the Division Bench the intention

of the Court was to protect the interest of the tenants so that when the

building was demolished, in an action resorted under Section 354 of the

MMC Act, the rights of the occupants/tenants are protected and do not

extinguish. No other intention can be inferred from Clauses 9(l) and

9(p) of the said order passed by the Division Bench as extracted

hereinabove. Significantly, such guidelines were issued by the Division

Bench, as there was no policy framed by the MCGM on such issues.

23. Be that as it may, in any event when the MCGM issued the 2018-

Guidelines it was wholly available to the MCGM to consider all issues

form different perspectives. There was no embargo on the MCGM, when

it took upon itself to formulate such guidelines from examining the

effect its policy guidelines on all aspects of the redevelopment process.

Thus, to stretch such directions of the Division Bench as transformed

into Clause 1.15 of the 2018 guidelines, to mean that consent of 100%

tenants / occupants, to be necessary as a condition for grant of

24 of 33

-------------------------

 pvr                                                            filefa66666e729ba119992c6792539446


commencement             certificate,         certainly         brings      about       unwarranted

consequences,          of      stalling      the      redevelopment            project      by    some

tenants/occupants/members not consenting the redevelopment. To

attribute such consequences to Paragraphs 9(l) and (p) of the order

dated 23 June 2014 passed by the Division Bench would amount to a

wrong reading of such directions. A fortiori, such intention cannot be

attributed to Clause 1.15 of the 2018 Guidelines. Significantly, even

Clause 1.15 does not use the word "all the tenants and/or occupiers",

thus, to read such words or attribute such meaning to Clause 1.15, in

our considered opinion would, in fact, render such condition

unreasonable, unworkable as also arbitrary, when some of the

tenants/occupants/members who are minority in number are not willing

to consent to redevelopment and/or are not ready to enter into a PAAA

akin to a situation as in the present case.

24. Secondly, such an intention to be attributed to Clause 1.15 as

being canvassed on behalf of the MCGM, would not hold good also in

terms of what the DCPR-2034 would provide. Regulation 33(6) is a

regulation providing for 'Reconstruction of buildings destroyed by fire or

which have collapsed or which have been demolished under lawful

order'. Such regulation itself provides that reconstruction would be

25 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

subject to agreements by at least 70% of the occupants with the

landlord. The said regulation reads thus:

"33(6) Reconstruction of buildings destroyed by fire or which have collapsed or which have been demolished under lawful order. Reconstruction of buildings that existed on or after 10th June 1977 and have ceased to exist for reasons cited above, shall be allowed to be reconstructed with FSI as per the Regulation No 30(C). Provided that if the area covered under staircase/lift has not been claimed free of FSI as per then prevailing Regulation as per the occupation plan, the area covered under staircases/ lifts shall be considered while arriving protected BUA in such cases the premium for entire staircase lift area in the proposed building as per these Regulations shall be recovered.

This FSI will be subject to the following conditions: -

1. Reconstruction of the new building on the plot should conform to provisions of DP and these Regulations.

2. Reconstruction will be subject to an agreement executed by at least 70 per cent of the landlord and occupants each in the original building, within the meaning of the Mumbai Rents, Hotel and Lodging House Rates Control Act, 1947, and such agreement shall make a provision for accommodation and re-accommodate the said landlord/all occupants in the new building on agreed terms and a certificate from a practicing advocate having minimum of 10 years' experience, is submitted confirming that on the date of application, reconstruction, agreements are executed by at least 70% of the landlords and occupants each in the original building with the developer/owner. The Advocate shall also certify that the agreements with occupants are valid and subsisting on the date of application.

...... ....... ........ ...... ....... ........ ..........................."

(emphasis supplied)

25. Even other regulations under the DCPR-2034 which concern

reconstruction or redevelopment, a consent of 51% of the

occupants/tenants is what is mandated. These regulations are

Regulations 33(5), 33(7), 33(7A), 33(9), 33(10) which read thus:-

26 of 33

-------------------------

 pvr                                                 filefa66666e729ba119992c6792539446

Reg       Name of the Scheme  %        Related Clause in Scheme about consent
                              Reqd
33(5)     Development       / 51%
          Redevelopment   of           7) a) In any Redevelopment Scheme
          Housing Schemes of           where the Cooperative Housing
          Maharashtra                  Society/Developer appointed by the Co-
          Housing       Area           operative Housing Society has obtained
          Development
                                       NOC from the MHADA/Mumbai Board,
          Authority (MHADA)
                                       there by sanctioning additional balance
                                       FSI with the consent of 51% of its
                                       members and where such NOC holder
                                       has made provision for alternative
                                       permanent accommodation in the
                                       proposed building (including transit
                                       accommodation/Rent Compensation),
                                       then it shall be obligatory for all the
                                       occupiers/members to participate in
                                       the Redevelopment Scheme and vacate
                                       the existing tenements for the purpose
                                       of redevelopment. In case of failure to
                                       vacate the existing tenements, the
                                       provisions of section 95A of the MHAD
                                       Act. mutatis mutandis shall apply for
                                       the purpose of getting the tenements
                                       vacated from the non-co-operative
                                       members.


33(7)     Reconstruction    or 51%     (2)1(a) The new building may be
          redevelopment     of         permitted to be constructed in pursuance
          cessed buildings in          of an irrevocable written consent by not
          the Island City by           less than 51% of the occupiers of the old
          Co-operative                 building.
          Housing Societies or
          of   old   buildings
          belonging to the
          Corporation.




                                      27 of 33
                               -------------------------





 pvr                                                      filefa66666e729ba119992c6792539446

33(7A)    Reconstruction     or 51%         2(a) A new building may be permitted to
          redevelopment      of             be constructed in pursuance of an
          Dilapidated/unsafe                irrevocable written consent by not less than
          existing authorised               51 per cent of the tenants of the old
          tenant      occupied              building.
          building in Suburbs
          and         extended
          Suburbs and existing
          authorized       non-
          cessed         tenant
          occupied buildings in
          Mumbai City.

33(9) Reconstruction or 51% 4. a) Redevelopment or Reconstruction redevelopment of under CDS may be permitted in pursuance Cluster(s) of of an irrevocable registered written consent Buildings under by not less than 51 percent of each Cluster Development building or 70 percent overall of the Scheme(s) (CDS) scheme of the eligible tenants/occupiers of all the authorized buildings on each plot involved in the CDS or as provided in MHAD Act, 1976. Consent as aforesaid of such 51 percent of each building and 70% overall of the scheme of tenants/occupiers for reconstruction or redevelopment shall not be required, if MHADA/MCGM undertakes redevelopment, on its own land, directly without any developer.

33(10 Redevelopment for 70% 1.15 Where 70 percent or more of the ) Rehabilitation of eligible hutment-dwellers in a slum and Slum Dwellers stretch of road or pavement contiguous to it at one place agree to join a rehabilitation scheme, it may be considered for approval, subject to submission of irrecoverable written agreements of eligible hutment-

dwellers before LOI. Provided that nothing contained herein shall apply to Slum Rehabilitation Projects undertaken by the State Government or Public authority or as the case may be a Govt. Company as defined in Sec. 617 of the Companies Act 1956 and being owned & controlled by the State Government.

26. In view of the clear provisions of Regulation 33.6 as also the other

28 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

regulations as noted above, which unfold the statutory intention

providing for 51% and 70 % of the consent of the tenants / occupants,

agreeing to accept permanent alternate accommodation as may be

offered by the owner/ landlord would be required to be accepted as an

appropriate compliance for an entitlement for a commencement

certificate to be issued for the redevelopment or reconstruction to be

undertaken under the relevant regulations of the DCPR. Thus, in our

clear opinion, it was arbitrary for the MCGM to insist from the

petitioners, consent of 100% of the tenants and in its absence withhold

the commencement certificate to be issued to the petitioners on

respondent Nos.3 to 9 not consenting to accept residential tenements.

27. For the sake of completeness, we may also observe that the

MCGM may receive proposals under Regulations 33(5), 33(7), 33(7A),

33(9) and 33(10) of the DCPR-2034. On such proposals being received

by the MCGM, there is nothing to suggest that the MCGM would not

apply Clause 1.15 of the 2018 Guidelines. In our opinion, the position in

regard to such proposals also would not be different and hence, the

requirement of 100% consent of tenants entering into a PAAA with the

landlord/owner would not be applicable in respect of such any proposal

when the DCPR 2034 itself mandates consent of 51% to 70%

29 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

respectively of the occupants/ tenants.

28. It is a settled position in law that the interest of the minority

occupants/tenants cannot be opposed to the interest of the majority

occupants, as also such persons cannot foist on the owners a delay in

commencement of the redevelopment work, resulting in the project cost

being increased, which would be seriously prejudicial to the

owners/developers and above all the majority of the occupants. (See:

Girish Mulchand Mehta & Anr. Vs. Mahesh S. Mehta & Anr. 2; the

judgment of this Court in Kamla Homes and Lifestyle Pvt.Ltd. Vs. Pushp

Kamal Co-op. Hsg.Society Ltd. & Ors.3, Westin Sankalp Developers Vs.

Ajay Sikandar Rana & Ors.4; Sarthak Developers Vs. Bank of India Amrut

Tara Staff Co-op. Hsg. Society Ltd. & Ors.5; Choice Developers Vs.

Pantnagar Pearl CHS Ltd. & Ors.6

29. In the present context, our attention has also been drawn to an

order dated 28 January 2022 passed by a Co-ordinate Bench of this

Court in Writ (l) No.1591 of 2022 (Ratnesh Sheth and Anr. Vs.

2 2010(2) MhLJ 657 3 2019 SCC OnLine Bom 823.

4 2021 SCC OnLine Bom 421.

5 2012 SCC OnLine Bom 525.

6 2022 SCC OnLine Bom 786.

30 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

Municipal Corporation for Gr.Mumbai & Ors) wherein in similar

circumstances the Court directed that non-consent of two tenants for

redevelopment of the building, would not hold good as the other 9

tenants have given their consent for redevelopment of the building

which was already demolished. It was observed that two tenants cannot

stall the entire redevelopment by withholding their consent, as it affects

rights of all other tenants. The Division Bench hence directed that

notwithstanding Condition No.12 of the IOD as issued in the said case,

the MCGM was required to be directed to process the building

permission of the petitioner - developer.

30. In the light of the above discussion, in our opinion, Writ Petition

No.5130 of 2022 is required to be allowed in the following terms:-

ORDER

(i) It is declared that Clause 1.15 of the 2018 Guidelines " Guidelines

issued by the MCGM for declaring private and municipal buildings as 'C-

1' category (Dangerous, Unsafe)" do not mandate consent/agreement to

be obtained from all (100%) tenants/ occupants, as consent of 51% to

70% of the occupants/tenants of the building, as applicable to the

proposals made under the relevant regulations DCPR-2034 as noted

above, shall amount to sufficient compliance for processing

31 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

development/ redevelopment proposal, for a commencement certificate

to be issued, including in respect of buildings covered under Section 354

of the MMC Act.

(ii) Consequent to the directions in (i) above, the MCGM is directed

to accept the consent of 32 unit-holders / occupiers as sufficient

compliance of Clause 1.15 of the 2018 Guidelines and Condition No.A-

39 and Notes 20 and 21 of the Intimation of Disapproval (IOD) dated 16

June 2022.

(III) The petition is accordingly allowed in the above terms. No costs.

31. In so far as the Writ Petition (l) No.8486 of 2022 is concerned, the

petition shall stand allowed in terms of the orders passed by us in Writ

Petition No.5130 of 2022. The MCGM is accordingly directed to process

the commencement certificate in favour of the petitioners without

insisting for permanent alternate accommodation agreements in respect

of 100% of tenants. Mr. Khandeparkar, learned Counsel for the

petitioners states that the petitioners shall enter into a permanent

alternate accommodation agreement with respondent No.9 within two

weeks from today, similar to those executed with the other tenants. He

states that in so far as respondent No.7 is concerned, there are

32 of 33

-------------------------

pvr filefa66666e729ba119992c6792539446

proceedings pending before the Small Causes Court at Mumbai, and as

there are dispute inter se between the private parties, his client is ready

to enter into a permanent alternate accommodation agreement subject

to the outcome of the said proceedings. Statement of Mr.Khandeparkar

is accepted.

32. In view of the petition itself being disposed of, Interim

Application (l) Nos.1929 of 2023 and Interim Application (l) No.1323 of

2023 in Writ Petition (l) No.8486 of 2022 would not require

adjudication and would stand disposed of.

33. Both the writ petitions stand disposed of. No costs.

(R. N. LADDHA, J.)                                               (G. S. KULKARNI, J.)




                                      33 of 33
                               -------------------------





 

 
Download the LatestLaws.com Mobile App
 
 
Latestlaws Newsletter
 

Publish Your Article

 

Campus Ambassador

 

Media Partner

 

Campus Buzz

 

LatestLaws Guest Court Correspondent

LatestLaws Guest Court Correspondent Apply Now!
 

LatestLaws.com presents: Lexidem Offline Internship Program, 2026

 

LatestLaws.com presents 'Lexidem Online Internship, 2026', Apply Now!

 
 

LatestLaws Partner Event : IJJ

 

LatestLaws Partner Event : Smt. Nirmala Devi Bam Memorial International Moot Court Competition

 
 
Latestlaws Newsletter