The first respondent, the Municipal Corporation of Delhi, published an advertisement in the press on December 30, 1978, to fill 8 positions for Assistant Engineers (Civil) through direct recruitment. Following interviews, a list of selected candidates from the Graduate Junior Engineers was created and approved on May 2, 1979. However, the final decision regarding the appointment of these direct recruits was still pending. On April 10, 1978, the first respondent assigned current duty charges of the Assistant Engineer positions to 6 diploma holder Junior Engineers, and on June 21, 1979, promoted two diploma holder Junior Engineers to Assistant Engineers with current duty charges. Concerned that the planned direct recruitment would harm their interests, the petitioners, who were diploma holder Junior Engineers employed by the first respondent, filed writ petition No. 221 of 1979 under Article 32 of the Constitution. They sought directions to prevent the first respondent from directly recruiting Assistant Engineers, to implement the Third Pay Commission\'s recommendations regarding promotion rules and policies, to consider their seniority based on their length of service, and to ensure that those holding ad-hoc and current duty charges were not adversely affected. The petitioners also requested the annulment of the seniority list dated September 2, 1978 (Annexure G in writ petition 1194 of 1979). They argued that the first respondent should have halted the direct recruitment of Assistant Engineers and that the recruitment regulations from June 27, 1970, which stipulated a 50% promotion and 50% direct recruitment quota, should not be enforced. The petitioners claimed that the first respondent Corporation had been following the recruitment and promotion practices of the Central Public Works Department (C.P.W.D.), which had decided in August 1975 to suspend direct recruitment in the Central Engineering Service effective April 1, 1972. The first respondent had previously resolved in 1970 and 1971 that all fundamental and supplementary rules, including amendments and orders from the Central Government, would be treated as rules issued by them. The Central Government, which had general oversight over the first respondent, had informed them in a letter dated February 23, 1976, that direct recruitment could be banned following the Third Pay Commission\'s recommendations, similar to the C.P.W.D.\'s actions. The 27th respondent in writ petition 1194 of 1979 argued that since there were only 60 Civil Engineer positions when the Recruitment Regulations were established, those regulations could only apply to those 60 Assistant Engineer posts, meaning direct recruits were entitled to only 30 positions, and they had already been allocated 36 posts.

The Graduate Junior Engineers listed in the select panel, along with others, filed writ petition No. 1194 of 1979 under Article 32 of the Constitution, requesting the first respondent to fill the 8 Assistant Engineer positions from the select panel, to fill the remaining Assistant Engineer posts in the direct recruitment quota from the empaneled petitioners, to grant a revised pay scale of Rs. 550-900 to the petitioners and other Graduate Junior Engineers effective from the date it was applicable in the C.P.W.D., and to increase the special pay from Rs. 40 to Rs. 75 per month starting January 1, 1979. The petitioners also sought to annul the office orders dated April 10, 1978, and June 21, 1979, to recognize Graduate Junior Engineers as a distinct category with an equal quota under the departmental promotee quota for Assistant Engineer positions, and to affirm that Graduate Junior Engineers in the service of the first respondent should be treated equally to their counterparts in other Government Departments. The petitioners contended that despite a statutory obligation on the first respondent to fill Assistant Engineer positions on a 50:50 basis, 26 Assistant Engineer positions in the direct recruitment quota remained unfilled, and only 8 positions were advertised. The first respondent had not filled even those 8 positions with candidates from the select list, instead promoting diploma holder Junior Engineers with current duty charges, thereby violating the petitioners\' rights under Article 16 of the Constitution. According to the Central Civil Service Rules, 1973, and based on the Third Pay Commission\'s report, the petitioners, as Graduate Junior Engineers, were entitled to the pay scale of Rs. 550-900. The petitioners argued that since they were similarly situated to other graduate Engineers in class 3 service in other Government departments, there was no valid justification for discriminating against them compared to other graduate Junior Engineers in class 3 service in other Government departments.
 

H. C. Sharma & Ors Vs. Municipal Corporation of Delhi & Ors [1983] INSC 79 (13 July 1983)

VARADARAJAN, A. (J) VARADARAJAN, A. (J) TULZAPURKAR, V.D.

CITATION: 1983 AIR 881 1983 SCR (3) 372 1983 SCC (3) 567 1983 SCALE (2)983

CITATOR INFO :

R 1987 SC2359 (8) RF 1989 SC 307 (5,8)

ACT:

Constitution of India-Arts. 14 and 16-Scope of-Carving out two classes in the same category on the basis merely of qualification not permissible.

Delhi Municipal Corporation Act, 1957-Secs. 47 and 480(2)-Scope of-Delhi Municipal Corporation-A statutory authority-Not bound by policy of C.P.W.D. unless adopted by its resolution. Recruitment Regulations dated 27.6.1970 made with approval of Central Government under sec. 480(2) Applicable prospectively, Appointment of Assistant Engineers (Civil)-Quota rule-50 per cent by promotion and 50 per cent by direct recruitment-Validity of. Appointment of Jr.

Engineers as Assistant Engineers on current duty charge basis for long periods.-Irregular.

HEADNOTE:

The first respondent, Municipal Corporation of Delhi, put up an advertisement in the press on 30-12-1978 for filling up 8 posts of Assistant Engineers (Civil) by direct recruitment. Pursuant to the interviews held in this behalf a list of selected candidates out of Graduate Junior Engineers was prepared and approved on 2.5.1979. The list was pending final decision about the appointment of the direct recruits selected for these 8 posts. By its office order dated 10.4.1978 the first respondent entrusted 6 diploma holders Junior Engineers with current duty charge of the posts of Assistant Engineers and by office order dated 21.6.1979 promoted two diploma holder Junior Engineers as Assistant Engineers on current duty charge. Feeling that the proposed direct recruitment would be detrimental to their interest, the petitioners, who were diploma holder Junior Engineers of the first respondent, filed writ petition No. 221 of 1979 under Art. 32 of the Constitution, praying for directions to be issued to the first respondent to restrain the first respondent from recruiting Assistant Engineers directly; to give effect to the recommendations of the Third Pay Commission regarding the rules and policy of promotion etc; to reckon the seniority of the petitioners with their length of service and not to affect in any manner all those holding adhoc charge and current duty charge. The petitioners also prayed for quashing the seniority list dated 2.9.1978 (Annexure G in writ petition 1194 of 1979), The petitioners contended that the first respondent should have suspended the direct recruitment of Assistant Engineers and that the rule prescribing a quota of 50 per cent by promotion and 50 per cent by direct recruitment laid down in the recruitment regulations dated 27.6.1970 should not be followed. The petitioners submitted that the first respondent Corporation had been following the pattern of functioning current in the Central Public Works Department (C.P.W.D.) in all matters of recruitment, promotion and other conditions. The C.P.W.D. had decided in August, 373 1975 to suspend direct recruitment in Central Engineering Service w.e.f. 1.4.1972. The first respondent had taken a decision by passing resolutions in 1970 and 1971 to the effect that all fundamental rules and supplementary rules including amendments and orders issued by the Central Government shall be treated as rules etc. issued by respondent I. The Central Government had power of general superintendence over the first respondent and it had informed the first respondent by letter dated 23.2.1976 that consequent upon recommendations of the Third Pay Commission direct recruitment may be banned by respondent I as had been done by the C.P.W.D. The 27th respondent in writ petition 1194 of 1979 contended that since there were only 60 posts of Civil Engineers when the Recruitment Regulations dated 27.6.1970 were made those Regulations could apply only to 60 posts of Assistant Engineers and direct recruits would be entitled to only 30 posts and they were not entitled to further posts by direct recruitment now as they had already been given 36 posts.

The graduate Junior Engineers whose names were on the select list, along with others, filed writ petition No. 1194 of 1979 under Art. 32 of the Constitution praying for directions to be issued to the first respondent to fill up 8 posts of Assistant Engineers from amongst those in the Select Panel; to fill up the remaining posts of Assistant Engineers in the direct recruitment quota from amongst the empanelled petitioners; to grant revised pay scale of Rs. 550-900 to the petitioners and other Graduate Junior Engineers w.e.f. the date it was made applicable in the C.P.W.D.; to revise special pay from Rs. 40 to Rs. 75 per mensem w.e.f. 1.1.1979. The petitioners also prayed for quashing office orders dated 10.4.1978 and 21.6.1979;

declaring the Graduate Junior Engineers as a separate category and giving them equal quota under the departmental promotee quota in the posts of Assistant Engineers; and also declaring that the Graduate Junior Engineers in the service of respondent I are entitled to be put on par with their counterparts in other Government Departments. The petitioners urged that even though a statutory duty was cast on the first respondent to fill up the posts of Assistant Engineers on 50:50 basis, 26 posts of Assistant Engineers in the direct recruitment quota were kept unfilled and only 8 posts were advertised. The respondent I had not filled up even those 8 posts with candidates from the select list but had in violation of the rights of the petitioners guaranteed under Art. 16 of the Constitution promoted Junior Engineers with diploma on current duty charge. Under the Central Civil Service Rules, 1973 and on the basis of the Third Pay Commission's report the petitioners who were graduate Junior Engineers were entitled to the pay scale of Rs. 550-900. The petitioners submitted that since they were similarly circumstanced with those other graduate Engineers in class 3 service in other Government departments there was no just or valid reason to discriminate the petitioners qua the other graduate Junior Engineers in class 3 service in other Government departments.

Dismissing writ petition 221 and partly allowing writ petition 1194,

HELD: There is nothing wrong in the respondent 1- Corporation proceeding to appoint Assistant Engineers (Civil) by direct recruitment as per the Recruitment Regulations or in fixing the 50:50 quota [and working it out or in the selection of the petitioners in Writ Petition 1194 of 1979 as Assistant 374 Engineers pursuant to the decision to appoint 8 Assistant Engineers (Civil) by direct recruitment. [403 D-H] The Municipal Corporation of Delhi which is a statutory authority is not automatically bound by any decision that may be taken by the C.P.W.D. in regard to direct recruitment of Assistant Engineers and it is open to the Corporation to adopt any policy of the C.P.W.D. by a resolution when alone that policy will become binding on the Corporation. No provision in the Third Pay Commission's Report has been brought to the notice of the Court. On the other hand it is admitted that there is no resolution of the Delhi Municipal Corporation banning or suspending direct recruitment of Assistant Engineers for 7 years or any period from any date whatsoever. The Central Government's letter dated 23.2.1976 does not contain any direction which could be issued by the Central Government under sec. 487 of the Act and is not binding on respondent I. The 50:50 quota fixed in the Recruitment Regulations approved on 27.6.1970 has not been altered but has been approved by the Corporation in its Resolution No. 348 dated 10.7.1978. [400 C-F] A.K. Subbaraman & Ors. v. Union of India, (1975) 2 S.C.R. 979 referred to.

Respondent I is admittedly bound by the Recruitment Regulations made with the approval of the Central Government as required by sec. 480(2) of the Delhi Municipal Corporation Act and it shall fill the remaining posts of Assistant Engineers in the direct recruitment quota which are kept vacant in the seniority list dated 2.9.1978 and any further posts which might have become available thereafter or become available in view of the decision in these two Writ Petitions or otherwise in accordance with those Recruitment Regulations. [403 H, 404 A-B] The quota fixed in the Recruitment Regulations cannot be restricted to only 60 posts of Assistant Engineers which were in existence on the date of their approval. The Recruitment Regulations themselves do not say that they are retrospective in operation from 1958. Prima facie those Regulations would apply to all future recruitments and promotions. That is how they have been understood by the authorities of respondent I Corporation when they decided to have 8 posts of Assistant Engineers filled up by direct recruitment though at that time there were 36 directly recruited Assistant Engineers holding more than 50 per cent of 60 such posts. [400 H, 401 A-B] The seniority list dated 2.9.1978 (Annexure G in Writ Petition 1194 of 1979) which was prepared after hearing all concerned does not appear to have been objected to before or after it was finalised except in Writ Petition 221 of 1979.

In that seniority list 130 posts of Assistant Engineers are mentioned by placing one promotee and one direct recruit alternatively according to their seniority. The petitioners in Writ Petition 221 of 1979 are only Junior Engineers whereas the seniority list relates to Assistant Engineers.

It is not the case of the petitioners in Writ Petition 221 of 1979 that their seniority as Junior Engineers has not been fixed properly. They are only Junior Engi- 375 neers and consequently they cannot question the correctness of the seniority list dated 2.9.1978 relating to Assistant Engineers. As they have not yet been regularly appointed or promoted as Assistant Engineers they cannot have any grievance about their names not being mentioned in that seniority list. Therefore, there is no need to quash the seniority list dated 2-9-1978 or to give any direction to respondent I to reckon the seniority of the petitioners with the length of their services. [401 C-E, 410 H, 411 A-B] Continuing Current Duty Charge and Adhoc appointments for period exceeding the period of one year mentioned in the memorandum dated 30.12.1976 of the Government of India is irregular though that Memorandum could not be stated to be automatically binding on respondent I. What is totally wrong is that appointment of Junior Engineers on Current Duty Charge as Assistant Engineers has been made by the impugned order dated 21.6.1979 even after the approval of the select list prepared for the appointment of 8 Assistant Engineers without issuing orders for appointment even to 8 out of those persons who are in the select list. The appointment of 6 Diploma Holder Junior Engineers by the order dated 10.4.1978 (Annexure I) and of 2 such Junior Engineers by the order 21.6.1979 (Annexure M) as Junior Engineers on Current Duty Charge for periods which are proved to be too long is irregular and the same is quashed. Respondent I shall issue orders of appointment to 8 Degree holder Junior Engineers out of those in the select list approved on 2.5.1979 within one month from this date and complete the appointment of Assistant Engineers for the remaining posts on regular basis in accordance with the quota fixed in the Recruitment Regulations within six months from this date until which time the Current Duty Charge holder and Adhoc appointees according to seniority will continue to man the remaining posts. Respondent I shall not make Current Duty Charge/Adhoc appointments and promotions except strictly and truly in accordance with the instructions and Regulations and other instructions, if any, issued in that regard. [408 H, 409 A- E] Declaring the petitioners Graduate Engineers as a separate category amongst Junior Engineers and giving them equal quota like the Diploma holder Junior Engineers out of the 50 per cent for promotion as Assistant Engineers, cannot be done except by carving out two classes in the same category of Junior Engineers on the basis merely of their qualification which is not permissible in law though the creation of selection grade in the same category on the basis of merit and seniority is well known and permissible.

The Junior Engineers do the same kind of work and bear the same responsibilities whatever their qualification, whether they are degree holders or diploma holders. [411 C-E] S. B. Patwardhan v. Maharashtra, (1977) 3 SCR 775 referred to.

The petitioners in Writ Petition 1194 of 1979 cannot be allowed to blow hot and cold. In regard to the policy of suspension of direct recruitment of Assistant Engineers (for 7 years w.e.f. 1.4.1972) their contention is that the policy of the C.P.W.D. cannot apply automatically to the Corporation until it is adopted by a resolution. Now in regard to the planning allowance they 376 cannot be heard to say that the revision should be made automatically from 1.1.1979 following the C.P.W.D. pattern.

Evidently, the Corporation has resolved to grant the upward revision only from 19.5.80. The petitioners are not entitled to claim the revision from 1.1.1979 itself and they have to be satisfied with the revision effected from 19.5.80. [410 C-E]

ORIGINAL JURISDICTION: Writ Petition Nos. 221 & 1194 of 1979.

Under article 32 of the Constitution of India.

(In WP. 221/79):

Mrs. Shyamla Pappu and A. Minocha for the Petitioner.

U.R. Lalit, B.P. Maheswari, Suresh Sethi and Miss Asha Rani Jain, for the Respondents Nos. 1-2.

R.P. Sharma for the Respondents 9, 13 and 28.

G.L. Sanghi, Miss Kamini Jaiswal and Miss Nishi Puri for Mrs Urmila Kapur for the Respondents Nos. 3,4,6,10,12,13,20,38,44 and 45.

(In WP. No. 1194/79):

V.M. Tarkunde, Miss Kamini Jaiswal and Miss Nishi Puri for the Petitioners 1 to 10.

G.L. Sanghi, Miss Kamini Jaiswal and Miss Nishi Puri for the Petitioners 11-21.

U.R. Lalit, B.P. Maheshwari and Suresh Sethi for Respondents 1 and 2.

S.C. Gupta and Ramesh Chand for Respondents Nos. 13,25 and 27.

The Judgment of the Court was delivered by VARADARAJAN, J. The petitioners in these two Writ Petitions, filed under Article 32 of the Constitution, are Junior Engineers of the first respondent, Municipal Corporation of Delhi. W.P: No. 221 of 1979 has been filed by Diploma-holders amongst the Junior 377 Engineers for the issue of Writ of mandamus or other appropriate writ to:

(1) Restrain respondent 1 from recruiting Assistant Engineers directly and filling up the posts of Assistant Engineers;

(2) Direct respondent 1 to give effect to the recommendations of the Third Pay Commission regarding the rules and policy of promotion etc;

(3) Quash the seniority list (Annexure G) prepared by respondent 1;

(4) Direct respondent 1 to reckon the seniority of the petitioners with their length of service; and (5) Direct respondent 1 not to affect in any manner all those holding adhoc charge and current duty charge.

W.P. No. 1194 of 1979 has been filed by Graduate Junior Engineers as well as Graduate Junior Engineers selected for appointment directly as Assistant Engineers for the issue of a writ of mandamus, certiorari or any other appropriate writ to:

(1) Direct respondent 1 to fill up eight posts of Assistant Engineers amongst those in the Select Panel;

(2) Quash Office Order dated 10.4.1978 (Annexure I) entrusting Junior Engineers with current duty charge of the posts of Assistant Engineers and the Office Order dated 21.6.1979 (Annexure M) promoting two Junior Engineers as Assistant Engineers on current duty charge on their own pay scale;

(3) Direct respondent 1 to fill up the remaining posts of Assistant Engineers in the direct recruitment quota from amongst the empanelled petitioners who are Graduate Junior Engineers;

(4) Declare the petitioners-Graduate Junior Engineers as a separate category and give them equal quota 378 under the departmental promotee quota in the posts of Assistant Engineers;

(5) Restrain respondent 1 from giving adhoc promotions to current duty charge holders amongst Junior Engineers;

(6) Declare that the petitioners Graduate Junior Engineers in the service of respondent 1 are entitled to be put on par with their counter-parts in other government departments;

(7) Direct respondent 1 to grant revised pay scales of Rs. 550-900 to the petitioners and other Graduate Junior Engineers as in the case of Graduate Engineers in Class III service in other government departments with effect from the date it is made applicable in the Central Public Works Department in view of the decision in Ram Kumar and Ors. vs. Union of India; and (8) Direct respondent 1 to revise special pay from Rs. 40 to Rs. 75 per mensem to the petitioners and other Graduate Junior Engineers entitled thereto from 1.1.1979.

The case of the petitioners in W.P. 221 of 1979 (Diploma-holders Junior Engineers) is that they are holding the posts of Junior Engineers in the service of respondent 1 for 16 to 18 years having joined service as Junior Engineers during 1967 to 1970 while respondents 3 to 46 are those who have been directly recruited as Assistant Engineers during 1974-78 in contravention of the declared policy of the Government barring direct recruitment. The next promotional posts to the petitioners are Assistant Engineers. The first respondent has been resorting to direct recruitment to the posts of Assistant Engineers to the extent of 50 per cent resulting in stagnation of the petitioners in the grade of Junior Engineers. It has been following the pattern of functioning current in the Central Public Works Department, hereinafter referred to as 'CPWD' in all matters of recruitment, promotion and other conditions of service. The CPWD had decided to suspend direct recruitment to the Central Engineering Service because no promotional chances were available to the Central Engineering/Electrical Engineering Service (Class II). That decision.

379 taken in August 1975 became effective from 1.4.1972 (Annexure 'B'). The first respondent has taken a decision by Resolutions Nos. 416 and 78 dated 27.7.1970 and 21.2.1971 to the effect that all fundamental rules and supplementary rules including amendments and orders issued by the Central Government shall be treated as rules etc. of the first respondent Corporation. Similarly, the Central Services Conduct Rules as applicable to Central Government and the general fundamental rules including amendments and orders issued by the Central Government have been made applicable to the first respondent Corporation. As soon as the petitioners learnt that there is suspension of direct recruitment in the CPWD the petitioners invited the attention of the first respondent to that fact in November 1975 and requested for banning of direct recruitment of Assistant Engineers and were given an assurance that their rights will not be over-looked. The petitioners made several representations including the last one dated 24.1:1979 (Annexure 'E'). The then Commissioner of the first respondent assured the petitioners orally that the practice adopted by the CPWD will be followed by the first respondent, but he however, wrote to the petitioners saying that the matter was under consideration. The petitioners met the Deputy Commissioner of the first respondent on 23.1.1979 and protested against the advertisement made in the Press to fill up eight posts of Assistant Engineers by direct recruitment, and as he accepted the suggestion of the petitioners they expected that the advertisement will be withdrawn. Respondent 1 is, however, bent upon going ahead with the direct recruitment though more than 275 out of 400 Junior Engineers aspiring for promotion as Asst. Engineers are eligible for consideration. The Central Government has power of general superintendence over the first respondent and it has informed the first respondent by letter dated 23.2.1976 (Annexure 'F') that consequent on the recommendation of the Third Pay Commission the first respondent may ban direct recruitment as has been done by the CPWD. The Director in the Office of the Director-General of Works, Government of India informed the Assistant Commissioner (Establishment) of the first respondent by letter dated 16.2.1978 (Annexure 'F1') that direct recruitment to CES/CEES Group B was still under suspension.

Though no specific reference has been made in the Third Pay Commission's Report to Junior Engineers of the first respondent Corporation, its recommendations have been followed by the first respondent, and its employees are treated in the same manner as employees of the Central Government are treated by the Government, their pay scales and service conditions being the same. The proposed direct recruitment 380 to eight posts of Assistant Engineers is detrimental to the interests of the petitioners in the light of the Central Government's memorandum of the year 1959 relating to seniority. The first respondent should, therefore, be directed to follow the same policy as is being followed by the Engineering Department of the Central Government.

The details of the appointments of respondents 3 to 46 who have been directly recruited as Assistant Engineers during the years 1974-78, given in Annexure A-1, would show that the direct recruits of the year 1974 rank higher and above the petitioners who are recruited much earlier. Of the 400 Junior Engineers in the service of respondent 1, 36 are holding current duty charge as Assistant Engineers from 1978 and several others are holding charge as Assistant Engineers on adhoc basis. Those Junior Engineers who are officiating as Assistant Engineers ought to be treated as regularly appointed Assistant Engineers. However, their names are not shown in the seniority list (Annexure 'G' circulated on 2.9.1978. That seniority list has been prepared on the basis of the memorandum issued by the Central Government in December 1979 which is similar to the seniority rules which has been struck down by this Court in the case of S.B. Patwardhan and Ors. etc. v. State of Mahrashtra & Ors.(1) Respondent 1 is drawing the seniority list without any authority of law by putting one promotee and one direct recruit thereafter and so on in accordance with the instructions of the Central Government, according to which those confirmed earlier would rank senior to those confirmed later. The conferment of artificial seniority by respondent 1 deprives the petitioners of their actual seniority and is destructive of the fundamental right to equality.

The first respondent-Corporation has filed counter- affidavit contending that the Corporation has to be guided by its own rules relating to its Engineering Service though the conditions of service under it could not be less attractive than those prevailing in the CPWD in order that it may attract proper engineering talents. All appointments in the Corporation carrying a minimum salary of less than Rs. 700 per mensem could be made by the Commissioner of the Corporation since 10.1.1975 in accordance with the recruitment rules which have been framed in consultation with the Union Public Service Commission though prior to that date consultation with Union Public Service Commission was essential in the matter of 381 appointment to posts carrying a minimum salary of Rs. 350 and above per mensem. After from Executive Engineers and Superintending Engineers, the Engineering Service (Civil) in the first respondent-Corporation consists of: (1) 450 Junior Engineers in the pay scale of Rs. 425-700, of which 80 per cent is filled by direct recruitment with the minimum qualification of Diploma in Civil Engineering and 20 percent is filled by promotion from amongst Works Assistants already in the service of the Corporation with Diploma in Civil Engineering and minimum experience of two years; (2) 13 Selection Grade Junior Engineers in the pay scale of Rs. 550-900 to be filled by promotion of Junior Engineers on completion of 12 years of service on the basis of seniority and (3) 99 Assistant Engineers in the pay scale of Rs. 650- 1200, of which 50 per cent is to be filled by promotion and 50 per cent by direct recruitment. A Degree in Civil Engineering and two years of professional experience are essential for direct recruits while for promotees from the cadre of Junior Engineers a minimum experience of three years of service for Degree-holders and five years of service for Diploma-holders in the grade of Junior Engineers are essential. Higher posts of Executive Engineers and Superintending Engineers were primarily filled up by promotion of Assistant Engineers and Executive Engineers respectively. These higher posts require better qualifications and experience. For that purpose 50 per cent of posts of Assistant Engineers are reserved for direct recruitment for which a Degree in Civil Engineering and two years of professional experience are essential qualifications.

All posts to be filled by direct recruitment have to be advertised and the candidates have to be called for interview and the selection made has to be approved by the Corporation. Even for promotion, a Departmental Promotion Committee with a member of the Union Public Service Commission has to be constituted and a list of eligible candidates has to be prepared and they have to be screened before the selection is made. All this takes time and the work of the Corporation cannot remain unattended in the meanwhile. Therefore, senior personnel from the immediate lower category of officers are drafted to the vacant posts on adhoc basis with pay and other emoluments due to the posts held under current duty charge, but without any right to that post which has to be filled by either promotion or direct recruitment as per the rules. The recruitment to higher grades of Executive Engineers and Superintending Engineers being primarily by promotion from Assistant Engineers and Executive Engineers respectively, the only avenue 382 to have engineers with better qualifications is by direct recruitment of Assistant Engineers to the extent of 50 per cent. If that avenue of direct recruitment is closed, there will be no source from which better qualified Engineers with higher Degree qualifications will become available. The Corporation considered the question of suspending direct recruitment of Assistant Engineers on several occasions, but it came to the conclusion that it is neither feasible nor desirable to do so in the interests of the Engineering Department. The Writ Petition has not disclosed any violation of any right much less a fundamental right of the petitioners. The petitioners have no right to force the first respondent-Corporation, a statutory body, to exercise its discretion in particular manner which is against the rules.

The Municipal Corporation, Delhi is a statutory authority, which is no doubt controlled by the Central Government to the extent mentioned in s. 487 of the Delhi Municipal Corporation Act, 1957. The Recruitment Regulations for the posts of Assistant Engineers(Civil) were notified in the Official Gazette on 27.6.1970 (Annexure 'R1'). They provide for recruitment of Assistant Engineers to the extent of 50 per cent by promotion of Junior Engineers and to the extent of 50 per cent by direct recruitment. The CPWD had decided to suspend direct recruitment to the Central Engineering Service Class II for seven years from 1972. The first respondent has resolved by Resolution No. 50 dated 20.7.1964 to adopt the CPWD patten of work with regard to execution of works alone and not with regard to the mode of recruitment and other service matters. The Central Government rules are made applicable to the employees of respondent-1 only on their adoption and approval by the Corporation; otherwise its employees are governed by the rules and regulations framed by the Corporation itself under s. 98 of the Delhi Municipal Corporation Act, 1957. The representations received from time to time for suspension of direct recruitment of Assistant Engineers were duly considered but it was found that there is no justification to comply with the request, and a decision in that regard was taken by the Council of the Corporation on 19.4.1978 (Annexure 'R2'). Out of 401 Junior Engineers, one is unqualified, 343 are Diploma-holders and only 57 are Graduates in Civil Engineering. The decision to fill up eight posts of Assistant Engineers by direct recruit was taken in view of the short-fall in the direct recruitment quota compared to the promotion quota in accordance with Recruitment Regulations which provide for filling up 50 per 383 cent by promotion and 50 per cent by direct recruitment of Assistant Engineers though sufficient number of Junior Engineers amongst Diploma-holders had become eligible for the posts of Assistant Engineers. The practice of suspending direct recruitment followed by other departments of the Central Government cannot, therefore, be followed by respondent 1. Section 47 of the Delhi Municipal Corporation Act provides for directions being given by the Central Government. But the Central Government's letter dated 23.2.1976 to the effect that consequent on the recommendations of the Third Pay Commission, respondent 1 may ban direct recruitment as has been done by the CPWD was not written in accordance with power conferred by Section 47 of the Delhi Municipal Corporation Act and it cannot, therefore, be taken as a directive from the Central Government.

The relative seniority of direct recruits and promotees has been determined in accordance with the instructions contained in the Ministry of Home Affairs' Office Memorandum No. 9/11/55-RPS dated 22.12.1959. Out of 401 Junior Engineers, 36 persons are holding the posts of Assistant Engineers on adhoc basis in the Junior Engineer's pay scale and they are liable to be reverted as Junior Engineers as and when the posts are filled up on a regular basis in accordance with the Recruitment Regulations. The officers appointed on adhoc basis and current charge basis cannot be treated as regular appointees in the absence of appointments in accordance with the Recruitment Regulations, and, therefore, their names have been rightly not included in the seniority list. The persons confirmed earlier are ranked as seniors to persons who are officiating in the grade in accordance with para 3 of the Home Ministry's Office Memorandum dated 22.12.1959 and there is no infringement of any fundamental right of the petitioners.

Respondents 3 to 10 and 12 to 15 have filed counter- affidavit contending that prayers Nos. 1, 2 and 4 in W.P. No. 221 of 1979 are in direct violation of the Recruitment Regulations relating to Assistant Engineers. Respondents 3 to 7 appeared before the Union Public Service Commission and were duly selected as Assistant Engineers on 2.1.1974 as mentioned in the Office order dated 4.6.1975 of the Assistant Commissioner (Establishment) of the first respondent (Annexure 'RA-1'). Respondents 8 to 18 of whom respondent 11 had died a few years ago also were appointed as Assistant Engineers with effect from 2.1.1974 in the direct recruitment quota. Respondents 19 to 46 also were appointed as Assistant Engineers on various 384 dates after 2.1.1974 in the direct recruitment quota.

Therefore, it is not open to the petitioners to question the seniority of respondents 3 to 46 fixed long ago in according with statutory rules. Respondents 3 to 10 and 12 to 17 are working as Executive Engineers on adhoc basis for over four years.

The promotional policy of respondent 1 is in accordance with the statutory rules approved in 1970 in consultation with the Union Public Service Commission and are neither arbitrary nor without authority of law. There has been no ban on direct recruitment to 50 per cent of the posts of Assistant Engineers as per the Recruitment Regulations.

Respondents 3 to 46 are Graduates in Civil Engineering and more qualified than the petitioners who are only Diploma holders. The petitioners are eligible to promotion as Assistant Engineers in the 50 per cent promotion quota. The first respondent is not following the pattern of the current functioning of the CPWD in the matter of recruitment and other service conditions but has its own Recruitment Regulations which have been approved by the Union Public Service Commission and duly notified on 27.6.1970. The CPWD has suspended direct recruitment of Assistant Engineers in Class II temporarily for seven years from 1.4.1972. Direct recruitment of Assistant Engineers is resorted to by respondent 1 for having highly qualified and talented Engineers and maintaining standards and efficiency. The petitioners cannot have any grievance against direct recruits of 1974 ranking higher in seniority in accordance with Recruitment Regulations. The final seniority list of Assistant Engineers circulated on 30.1.1975 (Annexure 'RA III') was finalised after considering the objections and is in accordance with the Home Affairs Ministry's Office Memorandum dated 22.12.1959 which lays down that the relative seniority of direct recruits and promotees shall be determined according to the rotation of vacancies between direct recruits and promoters which shall be based on the quota reserved in the Recruitment Regulations. It cannot be challenged after a long period of five years. The petitioners are, therefore, not entitled to any relief.

The petitioners in W.P. No. 1194 of 1979 are Graduate Junior Engineers. Their case is that the first respondent has been denying for the last six or seven years to them and other Graduate Junior Engineers their rightful quota of appointment as Assistant Engineers in accordance with the Rules while following the pattern of the CPWD even though a statutory duty is cast on the first respondent to fill up the posts of Assistant Engineers on 50 : 50 basis.

385 Consequently, 26 posts of Assistant Engineers in the direct recruitment quota are kept unfilled as is evident from the final seniority list of Assistant Engineers dated 2.9.1978 (Annexure 'G') though there are 50 Graduate Junior Engineers who are eligible to compete for those posts. Though 26 posts of Assistant Engineers were available for being filled up as an 20.12.1978 only 8 posts were advertised (Annexure 'A') and the names of petitioners 1 to 21 appeared in the duly prepared selection list. The first respondent has not filled up even those 8 posts with the candidates in that selection list but has filled up 6 posts by putting up Junior Engineers with Diploma as respondents 5 to 41 on current duty charge under the order dated 10.4.1978 forming Annexure 'I' in violation of Rules and the petitioners 'right guaranteed under Article 16 of the Constitution of India. In all 37 posts of Assistant Engineers including some in the quota of direct recruits have been filled up by Junior Engineers holding only Diplomas on current duty charge with the object of favouring Diploma-holders who have got great political influence by the Office order dated 21.6.1979 (Annexure 'M'). The Assistant Commissioner (Engineering) has taken an absolutely new stand in his reply (Annexure 'P') received on 6.9.1979 by saying that implementation of the approved panel was not feasible on account of ban imposed by the Commissioner on 10.8.1979 on new recruitment. The Diploma-holders posted as Assistant Engineers on the current duty charge have been further promoted as adhoc appointees by Office order dated 10.8.1979 (Annexure 'R'). The effect of this adhoc appointment is that the adhoc appointees draw pay in the higher scale of Assistant Engineers while in the current duty charge they were entitled to draw only their pay in the lower grade of Junior Engineers. The petitioners have, therefore, prayed for quashing the orders dated 10.4.1978 and 21.6.1979 (Annexures 'I' & 'M').

The chances of Graduate Junior Engineers becoming Assistant Engineers are very bleak. Justice can be done of both Diploma-holders and Graduates amongst the Junior Engineers by providing a reasonable quota for both categories in the 50 per cent quota reserved for promotees in the matter of appointment of Assistant Engineers as is done in the Delhi Electric Supply Undertaking so that Graduates and Diploma-holders amongst the Junior Engineers may get equal chances of promotion.

The petitioners, who are Graduate Junior Engineers, form a category with distinguishing features separate from Junior Engineers 386 who are Diploma-holders. The Supreme Court has held that separate category within the same category on the basis of educational qualifications is clearly permissible and not violative of Article 14 of the Constitution of India. But the first respondent is treating the two categories as equal. The Graduate Engineers suggested to the Deputy Commissioners (Engineering) that a separate cadre of Graduate Junior Engineers in the pay scale of Rs. 550-900 may be created and designated as Design Assistants. The Assistant Commissioner (Engineering) has replied by his letter dated 27.3.1979 (Annexure 'K') that the Municipal Chief Accountant has not accepted the suggestion. Under the Central Civil Service Rules, 1979 and on the basis of the Third Pay Commission's Report the petitioners who are Graduate Junior Engineers are entitled to the pay scale of Rs. 550-900 which is the revised pay scale of Junior Engineers in Class III service in other government departments. The petitioners are similarly circumstanced with those other Graduate Junior Engineers, and there is no just or valid reason to discriminate the petitioners qua the other Graduate Junior Engineers in Class III service in other Government departments.

The first respondent-Corporation has not revised the special pay (planning allowance) from the date from which the petitioners as Graduate Junior Engineers are legally entitled thereto. The planning allowance has been revised in the CPWD from Rs. 40 to 75 per mensem with effect from 1.1.1979 by the order dated 1.1.1979 (Annexure 'ZA'). The Corporation has by Resolution No. 184 dated 21.6.1971 sanctioned special pay to Section Officers now known as Junior Engineers working in the Planning Circle at Rs. 40 per mensem in the case of Graduates and Rs. 25 per mensem in the case of Diploma-holders with effect from 1.4.1971 on the pattern of the CPWD. The Planning allowance has been increased from Rs. 40 to Rs.75 per mensem in the CPWD with effect from 1.1.1979 by letter No. 28017 (17) 78 EW-1 dated 1.1.1979 (Annexure 'ZA') of the Ministry of Works and Housing Government of India. Though the Commissioner has recommended revision from Rs. 40 to Rs. 75 in his letter, the revision has not been effected on the ground that the approval of the Municipal Council is not forthcoming. The Delhi Administration's Notification dated 19.9.1972 circulated by respondent 1 on 30.9.1972 (Annexure 'ZC') shows that the General Financial Rules including amendments and orders issued by the Central Government are applicable to respondent 1 in every manner, be it pay or general allowance. Therefore, the stand of the first respondent 387 that revision of the planning allowance will be effective only from the date of approval by the Municipal Council is baseless, mala-fide and illegal.

The petitioners have prayed for the aforesaid reliefs in these circumstances.

The first respondent has filed a counter-affidavit contending that the qualification prescribed in the Recruitment Regulations notified on 27.6.1970 is Diploma in Civil Engineering or any higher qualification, and since all the Junior Engineers either with Degree or with Diploma are performing the same duties, no separate category can be allowed to Graduate Junior Engineers. Those Recruitment Regulations provide for 50 per cent of posts of Assistant Engineers being filled by promotion amongst Junior Engineers and 50 per cent by direct recruitments. For direct recruitment a Degree in Civil Engineering and two years of professional experience are the minimum qualifications required while for promotees five years of professional experience as Junior Engineers in the case of Diploma- holders and three years of professional experience in the case of Graduate Junior Engineers are the minimum qualifications required. The suggestion of the petitioner to treat the Graduate Junior Engineers as a separate category is not acceptable to the first respondent.

The select list for direct recruitment to the posts of Assistant Engineers out of Graduate Junior Engineers was approved by the competent authority on 2.5.1979 and the matter of appointment being still under consideration only two appointments on current duty basis were made out of the senior-most Junior Engineers by the order dated 21.6.1979 (Annexure 'M'). After the notification of the Recruitment Regulations in 1970, 36 Graduate Engineers in the direct recruitment quota and 10 promotees from amongst Graduates were appointed as Assistant Engineers. The criteria for promotion of Junior Engineers as Assistant Engineers is selection-cum-seniority. The rules for promotion applicable to the first respondent-Corporation are quite different from those of the CPWD and it is not incumbent on the first respondent to follow the CPWD rules. The eligibility of the petitioners and their selection to the posts of Assistant Engineers are not denied by the first respondent. The petitioners' names appear in the select list which has been approved by the Competent Authority on 2.5.1979 and is pending final decision about the appointment of the direct recruits selected for the 8 posts advertised in December 1978. The current duty charge arrangement 388 mentioned in Annexure 'M' had to be made as a stop gap arrangement to meet the immediate requirements of the Department and not to favour any Diploma-holders, and it does not amount to any violation of Article 16 of the Constitution of India. It is not admitted that 26 vacancies of Assistant Engineers still exist for being filled by direct recruitment. The appointment under the promotion quota is no doubt in excess of the prescribed percentage as some of the promotees had been adjusted against short-term vacancies.

The demand of the Graduate Junior Engineers' Union for the creation of a separate cadre in the pay scale of Rs. 550-900 for Graduate Engineers was objected to by the Finance Department of the first respondent-Corporation and found to be not feasible in view of the financial implications involved.

The matter of revising planning allowance of Rs. 40 and Rs. 25 paid to Graduate Junior Engineers and Junior Engineers holding Diploma is under consideration.

The 27th respondent has filed a counter-affidavit in the Petition for Stay filed in W.P. 1194 of 1979. Though he has sought leave in that counter-affidavit to file a detailed counter-affidavit in the main Writ Petition, no such counter-affidavit has been filed. In the course of arguments before us reference was made by the learned counsel for the parties to what is stated in the above counter-affidavit. Therefore, we would like to mention briefly the contentions put forward by the 27th respondent in that counter-affidavit.

The seniority list published on 11.10.1979 shows that the quota of the promotee Assistant Engineers is deficient, in that 21 posts out of the quota for promotees are still unfilled whereas the entire quota for direct recruits has been filled up already. That seniority list has been issued with the approval of the Commissioner, vide office Order No. 2(90)/ECI/ENGG/ESTT/1574 dated 11.10.1979, and shows that no post is available for being filled up by direct recruitment.

The Selection Board was not constituted as per the proper procedure. A minimum of two Deputy Commissioners are required to be on the Selection Board whereas in the case of the selection of Graduate Junior Engineers for appointment as Assistant Engineers 389 there was not even a single Deputy Commissioner on the Selection Board. When this illegality in the constitution of the Selection Board was realised, the Corporation authorities, at the behest of interested persons, had interpolated the name of the Deputy Commissioner (E) and obtained his signature sometime after the deliberations of the Selection Board had been completed and the minutes had already been signed by the members. Page 180C of the proceedings of the Selection Board (Annexure RIII to this counter-affidavit) shows that Har Mohinder Singh (sl. No. 15) was absent for the interview. Yet he has been awarded a total of 34 marks, including four marks at the interview and his name is sought to be placed at No. 14 in the Select Panel. The order communicating the constitution of the Selection Board shows that there were only four members including the Municipal Engineer who was designated as the Chairman. But the final minutes are signed by 5 members including the Deputy Commissioner (E).

The Corporation was formed on 7.4.1958. Since then a total of 95 Assistant Engineers have been appointed by direct recruitment whereas amongst the Junior Engineers and lower categories only 78 have been appointed as Assistant Engineers. Thirty-six respondents who are holding Current Charge as Assistant Engineers since various dates falling between 10.4.1978 and 21.6.1979 had joined service as Junior Engineers about 18 to 20 years ago, i.e., between 14.10.1959 and 24.8.1961. and they have become eligible for promotion as Assistant Engineers on a regular basis according to the rules of the Corporation long ago. Therefore, there is nothing wrong in promoting them on Current Charge basis as Assistant Engineers.

The Recruitment Regulations deal with and apply expressly to only 63 posts of Assistant Engineers. The direct recruits are, therefore, entitled to only 30 posts on 50 : 50 basis, but they have been admittedly given 36 posts.

Therefore, there is no further post of Assistant Engineer to be given to them on any of the respondents holding Current Charge being reverted as Junior Engineers. According to the procedure and rules of the Corporation, Current Duty Charge holders are to be given adhoc appointments as soon as possible, and as per the preamble to the Commissioner's letter No. 34 C&C dated 11.9.1979 adhoc status is required to be conferred with effect from the date of commencement of Current Duty Charge.

The panel prepared by the Selection Board, which has yet not been issued, is supposed to contain 37 names. Though under the 390 Rules for the 8 posts of Assistant Engineers advertised to be filled. By direct recruitment only 8 plus 20% thereof have to be selected it is interesting to note that the number of Junior Engineers holding Current Duty Charge is also 37.

We have re-arranged the order of the prayers in the Writ Petitions filed for the issue of Writs of Mandamus or other appropriate Writs and would mention them here once again for the sake of convenient reference. They are:

Writ Petition No. 221 of 1979:

(1) to restrain respondent 1 from recruiting Assistant Engineers directly and filling up the posts of Assistant Engineers;

(2) to direct respondent 1 to give effect to the recommendations of the Third Pay Commission regarding the rules and policy of promotion etc;

(3) to quash the seniority list (Annexure G) prepared by respondent 1;

(4) to direct respondent 1 to reckon the seniority of the petitioners with the length of their service;

and (5) to direct respondent 1 not to affect in any manner all Junior Engineers holding current duty charge and adhoc appointments as Assistant Engineers.

Writ Petition No. 1194 of 1979:

(1) to direct respondent 1 to fill up the 8 posts of Assistant Engineers by direct recruitment from amongst the Graduate Junior Engineers in the select panel;

(2) to quash the Office Order dated 10.4.1978 (Annexure 1) entrusting Junior Engineers with current duty charge of the posts of Assistant Engineers and the Office Order dated 21.6.1979 (Annexure M) promoting Junior Engineers as Assistant Engineers on current duty charge;

391 (3) to direct respondent 1 to fill up the remaining posts of Assistant Engineers in the direct recruitment quota from amongst the empanelled petitioners who are Graduate Junior Engineers;

(4) to declare the petitioners Graduate Junior Engineers as a separate category amongst Junior Engineers and give them equal quota like the Diploma holders Junior Engineers out of the departmental quota in the posts of Assistant Engineers;

(5) to restrain respondent 1 from giving adhoc promotions to current duty charge holders amongst Junior Engineers;

(6) to declare that the petitioners Graduate Junior Engineers in the service of respondent 1 are entitled to be put on par with their counterparts in other Government departments;

(7) to direct respondent 1 to grant revised pay scale of Rs. 550-900 to the petitioners and other Graduate Junior Engineers as in the case of Graduate Junior Engineers in Class (III) service in other Government departments with effect from the date on which it is made applicable in the CPWD; and (8) to direct respondent 1 to revise the special pay from Rs. 40 to Rs. 75 per mensem to the petitioners and other Graduate Junior Engineers entitled thereto from 1.1.1979.

We shall consider prayers 1 and 2 in Writ Petition No. 221 of 1979 and prayer I in Writ Petition No. 1194 of 1979 all of which relate to direct recruitment to 8 posts of Assistant Engineers. According to the counter-affidavit filed on behalf of respondent 1, apart from Executive Engineers, Superintending Engineers and Municipal Engineer who is at the top, the Engineering Service (Civil) of respondent 1 consists of:

(1) 450 Junior Engineers in the pay scale of Rs. 425- 700 of which 80% is filled by direct recruitment with the 392 minimum qualification of Diploma in Civil Engineering and 20% is filled by promotion from amongst Works Assistants already in the service of respondent 1 with Diploma in Civil Engineering and minimum experience of 2 years;

(2) 13 Selection Grade Junior Engineers in the pay scale of Rs. 550-900 to be filled by promotion of Junior Engineers on completion of 12 years of service on the basis of seniority; and (3) 99 Assistant Engineers in the pay scale of Rs. 650-1200 of which 50% is to be filled by promotion of Junior Engineers and 50% is to be filled by direct recruitment. A Degree in Civil Engineering and 2 years of professional experience are essential for direct recruitment as Assistant Engineers while for promotion as Assistant Engineers from the cadre of Junior Engineers a minimum of 3 years of service for Degree holders and 5 years of service for Diploma holders in the Grade of Junior Engineers are essential. All other higher posts of Executive Engineers, Superintending Engineers and Municipal Engineers are primarily filled by promotion of Assistant Engineers, Executive Engineers and Superintending Engineers respectively. All the appointments in the respondent 1 - Corporation carrying a minimum salary of less than Rs. 700 per mensem could be made by the Commissioner of the Corporation since 10.1.1975 in accordance with the recruitment rules which are framed in consultation with the Union Public Service Commission though prior to that date consultation with the Union Public Service Commission was essential in the matter of appointment to posts carrying a minimum salary of Rs. 350 per mensem and above. Direct recruitment is to be made on the recommendation of the Selection Board to be constituted for the purpose from time to time. Similarly, promotions are to be made on the recommendation of the Departmental Promotion Committee to be constituted for the purpose from time to time. The quota of 50% for 393 promotees amongst Junior Engineers and 50% for direct recruitment from amongst outsiders as well as Graduate Junior Engineers for appointment to posts of Assistant Engineers which are selection posts was fixed by the Recruitment Regulation dated 27.6.1970 made by the first respondent under S. 98 of the Delhi Municipal Corporation Act, 1957, vide resolution No. 97 dated 4 5.1970 in connection with the recruitment for the posts of Assistant Engineers (Civil) and approved by the Lt. Governor, Delhi under section 480 (2) of the said Act read with the Government of India, Ministry of Home Affairs' Notification dated 19.10.1966. The cause of the Graduate Junior Engineers is espoused by the Graduate Junior Engineers Union while the cause of the Diploma holders Junior Engineers is espoused by the Municipal Corporation of Delhi Assistant Engineers (ORG) (Regd.). There is no dispute about these facts except in regard to the quota of 50% for promotee Junior Engineers and 50% for directly recruited Graduate Engineers including Graduate Junior Engineers.

According to the petitioners in Writ Petition 221 of 1979 who are Diploma holders Junior Engineers respondent 1 has been following the pattern of functioning current in the CPWD in all matters of recruitment, promotion and other conditions of service. The CPWD has decided to suspend direct recruitment in the Central Engineering Service because no promotional chances were available to the Central Engineering Service/Electrical Engineering Service Class (II). The said decision taken in August 1975 became effective from 1.4.1972. The first respondent has taken a decision by Resolution Nos. 416 and 78 dated 27.10.1970 and 21.2.1971 respectively to the effect that all fundamental rules and supplementary rules including amendments and orders issued by the Central Government shall be treated as rules etc. by respondent 1. The Central Services Conduct Rules and General Fundamental Rules including amendments and orders issued by the Central Government have been made applicable to respondent 1. As soon as the petitioners learnt that there is suspension of direct recruitment in the CPWD they invited the attention of respondent 1 to that fact in November 1975 and requested 394 for banning direct recruitment of Assistant Engineers and were given an assurance that their rights will not be over- looked. The petitioners made several representations including the last one dated 24.1.1979. The then Commissioner of respondent 1 gave an oral assurance to the petitioners that the practice adopted by the CPWD will be followed by respondent 1, and later wrote to the petitioners saying that the matter was under consideration. The petitioners met the Deputy Commissioner of respondent 1 on 23.1.1979 and protested against the notification made in the press on 30.12.1978 for filling up 8 posts of Assistant Engineers by direct recruitment and they expected that the notification would be withdrawn as the Deputy Commissioner accepted their suggestion. But respondent 1 is, however, bent upon going ahead with the direct recruitment though more than 275 Junior Engineers out of 400 Junior Engineers aspiring for promotion as Assistant Engineers are eligible for consideration. The Central Government has power of general superintendence over the first respondent and it has informed the first respondent by letter dated 22.3.1976 that consequent on the recommendations of the Third Pay Commission direct recruitment may be banned by respondent 1 as has been done by the CPWD. The Director in the Office of the Director-General of Works, Government of India has informed the first respondent's Assistant Commissioner (Establishment) by letter dated 16.2.1978 that direct recruitment to the Central Engineering Service and Central Electrical Engineering Service (Group B) was still under suspension. Though no specific reference has been made in the Third Pay Commission's Report to Junior Engineers of the first respondent its recommendations have been followed by the first respondent and its employees are treated in the same manner as the employees of the Central Government. The pay scales and service conditions of the employees of the first respondent and the Central Government are the same.

The proposed direct recruitment to 8 posts of Assistant Engineers is detrimental to the interest of the petitioners.

The first respondent should, therefore, be asked to follow the same policy as the one adopted by the CPWD and be restrained from appointing 8 Assistant Engineers by direct recruitment. This is how the petitioners in Writ Petition 221 of 1979 seek the relief covered by the first prayer.

This is also the stand as defence in regard to the first prayer in Writ Petition 1194 of 1979 which is for a direction being given to respondent 1 to fill up the 8 posts of Assistant Engineers by direct recruitment from amongst those in the select list.

395 The 27th respondent has contended in his counter- affidavit that since the formation of the first respondent- Corporation on 7.4.1958 as many as 95 Assistant Engineers have been appointed by direct recruitment whereas amongst Junior Engineers only 78 have been appointed as Assistant Engineers by way of promotion. There were only 60 posts of Civil Engineers when the Recruitment Regulations dated 27.6.1970 were made and those Regulations could apply only to 60 posts of Assistant Engineers and direct recruits would be entitled to only 30 posts and they are not entitled to further posts by direct recruitment now as they have already been given 36 posts. The 27th respondent has attacked the selection of the panel of 37 persons by the Selection Board constituted pursuant to the decision to fill up 8 posts of Assistant Engineers by direct recruitment on the ground that the Selection Board had not been properly constituted and there are certain other irregularities. This is how the 27th respondent is challenging the decision to appoint 8 Assistant Engineers by direct recruitment and the validity of the select panel prepared by the Selection Board.

The first respondent's contention is that the Delhi Municipal Corporation is a statutory authority which is no doubt controlled by the Central Government but only to the extent mentioned in S, 487 of the Delhi Municipal Corporation Act, 1957. The Corporation has resolved by Resolution No. 50 dated 20.7.1964 to adopt the CPWD pattern with regard to the execution of works alone and not with regard to the mode of recruitment and other service matters.

The Central Government Rules are made applicable to the employees of respondent 1 only on their adoption and approval by the Corporation, and otherwise its employees are governed by the Rules and Regulations framed by the Corporation itself under section 98 of the said Act. The representations made from time to time for suspension of direct recruitment of Assistant Engineers were duly considered, but it was found that there was no justification to comply with that request and a decision to that effect was taken by the Council of the Corporation on 19.4.1978 in the interest of the Corporation. Section 47 of the Delhi Municipal Corporation Act provides for directions being given to the Corporation by the Central Government, but the Central Government's letter dated 23.2.1976 to the effect that consequent on the Third Pay Commission's recommendations respondent 1 may ban direct recruitment as has been done by the CPWD is not a direction given under that section and is, therefore, not binding on respondent 1.

The Recruitment 396 Regulations dated 27.6.1970 framed under section 98 of the Delhi Municipal Corporation Act provide for 50% of the posts of Assistant Engineers being filled by direct recruitment and 50% by promotion of Junior Engineers. The decision to fill up 8 posts of Assistant Engineers by direct recruitment was taken in view of the shortfall in the direct recruitment quota compared to the promotion quota.

Respondents 3 to 10 and 12 to 15 in Writ Petition 221 of 1979 have contended in their counter-affidavit that the prayers 1,2 and 4 in that Writ Petition are in the direct violation of the Recruitment Regulation dated 27.6.1970.

They have further contended that respondent 1 is not following the pattern of the current functioning of the CPWD in the matter of recruitment and other service conditions but is following its own Recruitment Regulations which have been approved by the Union Public Service Commission and duly notified on 27.6.1970. The direct recruitment is resorted to by respondent 1 for having highly qualified and talented Engineers and maintaining standards and efficiency.

The petitioners in Writ Petition 1194 of 1979 contend that a statutory duty is cast on respondent 1 to fill up the posts of Assistant Engineers on 50:50 basis. Though there were 26 posts of Assistant Engineers to be filled on that basis by direct recruitment, only 8 posts were notified on 30.12.1978 to be filled by direct recruitment. The first respondent has however not filled up even those 8 posts but has filled up some posts of Assistant Engineers thereafter on adhoc basis with Junior Engineers even though the select list has been approved on 2.5.1979 pursuant to the interviews held on the 6th and 7th March, 1979 in connection with the decision to fill up 8 posts of Assistant Engineers by direct recruitment.

The first respondent has contended in its counter- affidavit in Writ petition 1194 of 1979 that the select list for direct recruitment to the posts of Assistant Engineers out of Graduate Junior Engineers was approved by the competent authority on 2.5.1979 and the matter of appointment of 8 Assistant Engineers is under consideration.

The petitioners' names are in the select list and their eligibility and selection to the posts of Assistant Engineers is not denied and their appointment as Assistant Engineers by direct recruitment is under consideration.

We may state here that Mr. U. R. Lalit, Senior Advocate, appearing for respondents 1 and 2 has stated before us on 29.7.1981 397 that the total number of vacancies of Assistant Engineers would be ascertained within 2-1/2 months and thereafter in another 2-1/2 months orders of appointment of Assistant Engineers by direct recruitment will be issued by respondent 1.

Mrs. Shyamla Pappu, Senior Advocate appearing for the petitioners in Writ petition 221 of 1979 drew our attention to certain documents and submitted that direct recruitment of Assistant Engineers should have been suspended by respondent 1 following the decision taken by the CPWD to suspend direct recruitment of Assistant Engineers for 7 years from 1.4.1972. She also submitted that the 50:50 quota rule in the Recruitment Regulations approved on 27.6.1970 should not be followed. If her submission is that the quota rule should not be followed altogether it is not consistent with the stand taken by the 27th respondent in his counter- affidavit and also by Mr. S.C. Gupta, learned counsel appearing for respondents 13, 25 and 27 in Writ petition 1194 of 1979. The contention of the 27th respondent referred to above is that the quota rule can apply only to 60 posts of Assistant Engineers which were in existence on the date on which the Recruitment Regulations were approved, viz.

27.6.1970 and since there were 36 directly recruited Assistant Engineers when Writ petition 1194 of 1979 was filed which was more than 50% of the 60 posts there are no more posts of Assistant Engineers to be filled by direct recruitment. There

Download the LatestLaws.com Mobile App
 
 
Latestlaws Newsletter
 

Publish Your Article

 

Campus Ambassador

 

Media Partner

 

Campus Buzz

 

LatestLaws Guest Court Correspondent

LatestLaws Guest Court Correspondent Apply Now!
 

LatestLaws.com presents: Lexidem Offline Internship Program, 2026

 

LatestLaws.com presents 'Lexidem Online Internship, 2026', Apply Now!

 
 

LatestLaws Partner Event : IJJ

 

LatestLaws Partner Event : Smt. Nirmala Devi Bam Memorial International Moot Court Competition

 
 
Latestlaws Newsletter