Airports Authority Of India vs Shri R.K. Singhal on 16 November, 2011
Author: Valmiki J. Mehta
*             IN THE HIGH COURT OF DELHI AT NEW DELHI

+                         RFA No.576/2002

%                                           16th November, 2011

AIRPORTS AUTHORITY OF INDIA                       ...... Appellant
                    Through:          Mr.Sunil Ahuja, Adv.


                          VERSUS

SHRI R.K. SINGHAL                                 ...... Respondent
                          Through:    Mr. S.K.Sharma with
                                      Mr. Aashish Gambhir, Advs.

CORAM:
HON'BLE MR. JUSTICE VALMIKI J.MEHTA

    1.   Whether the Reporters of local papers may be
         allowed to see the judgment?

    2.   To be referred to the Reporter or not?   Yes

    3.   Whether the judgment should be reported in the Digest? Yes


VALMIKI J. MEHTA, J (ORAL)

1.            The challenge by means of this Regular First Appeal

under Section 96 of the Code of the Civil Procedure (CPC), 1908 is to

the impugned judgment of the Trial court dated 30.5.2002. By the

impugned judgment and decree, the Trial Court decreed the suit of

the respondent/plaintiff for recovery of the advance price paid of

Rs.1,35,000/- which was given pursuant to an auction held by the

appellant/defendant on 19.12.1998 for a Konica Nice Print System.

The Trial Court held that the advance price paid cannot be forfeited

even though the respondent/plaintiff was guilty of breach of
RFA No.576/2002                                           Page 1 of 14
 contract because mere breach of contract does not entitle the

aggrieved person viz. appellant/defendant for damages, unless

losses have been pleaded and proved and which admittedly was not

done.

2.          The facts of the case are that the respondent/plaintiff

participated in an auction held on 19.12.1998 conducted by the

appellant/defendant.      The respondent/plaintiff gave a bid for

Rs.4,00,000/- for a Konica Nice Print System Machine and deposited

an amount of Rs.1,35,000/- on the same day.                Since the balance

amount     was    not   deposited    by    the     respondent/plaintiff,    the

transaction fell through and the appellant forfeited the amount of

Rs.1,35,000/- on the ground that this payment which was made was

an earnest money deposit, and by its very nature, earnest money

deposited can be forfeited once breach of contract is established.

3.          The    only   issue     therefore      which    is   required   for

determination by this Court is whether taking as correct that the

respondent/plaintiff was guilty of breach of contract can the amount

paid of Rs.1,35,000/- be forfeited by the appellant/defendant on the

ground that the same was an earnest money deposit without

pleading   and     proving   that    any    loss     was    caused     to   the

appellant/defendant.

4.          The law in this regard is well settled and three premier

judgments of the Hon'ble Supreme Court are the judgments in the

RFA No.576/2002                                                  Page 2 of 14
 cases of Fateh Chand Vs Balkishan Dass, (1964) 1 SCR 515;

AIR 1963 SC 1405, Maula Bux Vs. UOI, 1969 (2) SCC 554 and

Union of India Vs. Raman Iron Foundry (1974) 2 SCC 231 . It

has been held in these judgments that clauses of forfeiture of

liquidated damages by their very nature are hit by Section 74 of the

Contract Act, 1872 inasmuch as such clauses are in the nature of

penalty and at best only provide for the upper limit for claim of

damages, and which if capable of being proved, have to be proved

before the amount paid as earnest money can be forfeited. It is the

ratio of these Supreme Court judgments that mere breach of

contract eo instanti does not entitle the aggrieved party to forfeit

the amount. The Constitution Bench in the case of Fateh Chand

(supra) has specifically referred to the fact that the fine distinctions

drawn in English law have been obliterated by Section 74 of the

Contract Act, and as per which all clauses of liquidated damages are

to be treated as bad, once losses otherwise can be established, and

only on establishing of which forfeiture can take place. The relevant

observations of the Supreme Court in the aforesaid judgment of

Fateh Chand (supra) are as under:-

            8. The claim made by the plaintiff to forfeit the
            amount of Rs 24,000 may be adjusted in the light of
            Section 74 of the Indian Contract Act, which in its
            material part provides:-
            "When a contract has been broken, if a sum is
            named in the contract as the amount to be paid in
            case of such breach, or if the contract contains any
            other stipulation by way of penalty, the party
RFA No.576/2002                                          Page 3 of 14
          complaining of the breach is entitled, whether or not
         actual damage or loss is proved to have been
         caused thereby, to receive from the party who has
         broken the contract reasonable compensation not
         exceeding the amount so named or as the case may
         be, the penalty stipulated for."
         The section is clearly an attempt to eliminate the
         sometime elaborate refinements made under the
         English common law in distinguishing between
         stipulations providing for payment of liquidated
         damages and stipulations in the nature of penalty.
         Under the common law a genuine pre-estimate of
         damages by mutual agreement is regarded as a
         stipulation naming liquidated damages and binding
         between the parties: a stipulation in a contract in
         terrorem is a penalty and the Court refuses to
         enforce it, awarding to the aggrieved party only
         reasonable compensation. The Indian Legislature
         has sought to cut across the web of rules and
         presumptions under the English common law, by
         enacting a uniform principle applicable to all
         stipulations naming amounts to be paid in case of
         breach, and stipulations by way of penalty.

         10. Section 74 of the Indian Contract Act deals with
         the measure of damages in two classes of cases (i)
         where the contract names a sum to be paid in case
         of breach and (ii) where the contract contains any
         other stipulation by way of penalty. We are in the
         present case not concerned to decide whether a
         contract containing a covenant of forfeiture of
         deposit for due performance of a contract falls
         within the first class. The measure of damages in
         the case of breach of a stipulation by way of penalty
         is by Section 74 reasonable compensation not
         exceeding the penalty stipulated for. In assessing
         damages the Court has, subject to the limit of the
         penalty stipulated, jurisdiction to award such
         compensation as it deems reasonable having regard
         to all the circumstances of the case. Jurisdiction of
         the Court to award compensation in case of breach
         of contract is unqualified except as to the maximum
         stipulated; but compensation has to be reasonable,
         and that imposes upon the Court duty to award
         compensation according to settled principles. The

RFA No.576/2002                                    Page 4 of 14
          section undoubtedly says that the aggrieved party is
         entitled to receive compensation from the party who
         has broken the contract, whether or not actual
         damage or loss is proved to have been caused by
         the breach. Thereby it merely dispenses with proof
         of "actual loss or damage"; it does not justify the
         award of compensation when in consequence of the
         breach no legal injury at all has resulted, because
         compensation for breach of contract can be
         awarded to make good loss or damage which
         naturally arose in the usual course of things, or
         which the parties knew when they made the
         contract, to be likely to result from the breach.

         15. Section 74 declares the law as to liability upon
         breach of contract where compensation is by
         agreement of the parties pre-determined, or where
         there is a stipulation by way of penalty. But the
         application of the enactment is not restricted to
         cases where the aggrieved party claims relief as a
         plaintiff. The section does not confer a special
         benefit upon any party; it merely declares the law
         that notwithstanding any term in the contract
         predetermining damages or providing for forfeiture
         of any property by way of penalty, the court will
         award to the party aggrieved only reasonable
         compensation not exceeding the amount named or
         penalty stipulated. The jurisdiction of the court is
         not determined by the accidental circumstance of
         the party in default being a plaintiff or a defendant
         in a suit. Use of the expression "to receive from the
         party who has broken the contract" does not
         predicate that the jurisdiction of the court to adjust
         amounts which have been paid by the party in
         default cannot be exercised in dealing with the
         claim of the party complaining of breach of contract.
         The court has to adjudge in every case reasonable
         compensation to which the plaintiff is entitled from
         the defendant on breach of the contract. Such
         compensation has to be ascertained having regard
         to the conditions existing on the date of the breach.

         16. There is no evidence that any loss was suffered
         by the plaintiff in consequence of the default by the
         defendant, save as to the loss suffered by him by

RFA No.576/2002                                     Page 5 of 14
            being kept out of possession of the property. There
           is no evidence that the property had depreciated in
           value since the date of the contract provided; nor
           was there evidence that any other special damage
           had resulted. The contact provided for forfeiture of
           Rs 25,000 consisting of Rs, 1039 paid as earnest
           money and Rs 24,000 paid as part of the purchase
           price. The defendant has conceded that the plaintiff
           was entitled to forfeit the amount of Rs 1000 which
           was paid as earnest money. We cannot however
           agree with the High Court that 13 percent of the
           price may be regarded as reasonable compensation
           in relation to the value of the contract as a whole, as
           that in our opinion is assessed on an arbitrary
           assumption. The plaintiff failed to prove the loss
           suffered by him in consequence of the breach of the
           contract committed by the defendant and we are
           unable to find any principle on which compensation
           equal to ten percent of the agreed price could be
           awarded to the plaintiff. The plaintiff has been
           allowed Rs 1000 which was the earnest money as
           part of the damages. Besides he had use of the
           remaining sum of Rs 24,000, and we can rightly
           presume that he must have been deriving
           advantage from that amount throughout this period.
           In the absence therefore of any proof of damage
           arising from the breach of the contract, we are of
           opinion that the amount of Rs 1000 (earnest money)
           which has been forfeited, and the advantage that
           the plaintiff must have derived from the possession
           of the remaining sum of Rs 24,000 during all this
           period would be sufficient compensation to him. It
           may be added that the plaintiff has separately
           claimed mesne profits for being kept out possession
           for which he has got a decree and therefore the fact
           that the plaintiff was out of possession cannot be
           taken, into account in determining damages for this
           purpose. The decree passed by the High Court
           awarding Rs.11,250 as damages to the plaintiff
           must therefore be set aside.          (Underlining
           added)

5.         To the same effect are the observations in Maula Bux

Vs. UOI, 1969 (2) SCC 554, and para 4 of which reads as under:-

RFA No.576/2002                                        Page 6 of 14
          "4. Under the terms of the agreements the amounts
         deposited by the plaintiff as security for due
         performance of the contracts were to stand forfeited
         in case the plaintiff neglected to perform his part of
         the contract. The High Court observed that the
         deposits so made may be regarded as earnest
         money. But that view cannot be accepted.
         According to Earl Jowitt in "The Dictionary of English
         Law" at p. 689 : "Giving an earnest or earnest-
         money is a mode of signifying assent to a contract
         of sale or the like, by giving to the vendor a nominal
         sum (e.g. a shilling) as a token that the parties are
         in earnest or have made up their minds." As
         observed by the Judicial Committee in Kunwar
         Chiranjit Singh v. Har Swarup A.I.R.1926 P.C.1

         Earnest money is part of the purchase price when
         the transaction goes forward : it is forfeited when
         the transaction falls through, by reason of the fault
         or failure of the vendee.

         In the present case the deposit was made not of a
         sum of money by the purchaser to be applied
         towards part payment of the price when the
         contract was completed and till then as evidencing
         an intention on the part of the purchaser to buy
         property or goods. Here the plaintiff had deposited
         the amounts claimed as security for guaranteeing
         due performance of the contracts. Such deposits
         cannot be regarded as earnest money.

         5. Section 74 of the Contract Act provides :

         When a contract has been broken, if a sum is named
         in the contract as the amount to be paid in case of
         such breach, or if the contract contains any other
         stipulation by way of penalty, the party complaining
         of the breach is entitled, whether or not actual
         damage or loss is proved to have been caused
         thereby, to receive from the party who has broken
         the    contract   reasonable     compensation    not
         exceeding the amount so named or, as the case
         may be, the penalty stipulated for.

         ...

There is authority, no doubt coloured by the view which was taken in English cases, that Section 74 of the Contract Act has no application to cases of deposit for due performance of a contract which is stipulated to be forfeited for breach : Natesa Aiyar v. Appavu Padayachi I.L.R. [1913] Mad. 178 Singer Manufacturing Company v. Raja Prosad I.L.R.[1909] Cal. 960 Manian Patter v. The Madras Railway Company I.L.R.[1906] Mad.188 But this view is no longer good law in view of the judgment of this Court in Fat eh Chand's case MANU/SC/0258/1963 : [1964]1SCR515 : [1964]1SCR515 . This Court observed at p. 526 :

"Section 74 of the Indian Contract Act deals with the measure of damages in two classes of cases (i) where the contract names a sum to be paid in case of breach, and (ii) where the contract contains any other stipulation by way of penalty.... The measure of damages in the case of breach of a stipulation by way of penalty is by Section 74 reasonable compensation not exceeding the penalty stipulated for."

The Court also observed :

"It was urged that the section deals in terms with the right to receive from the party who has broken the contract reasonable compensation and not the right to forfeit what has already been received by the party aggrieved. There is however no warrant for the assumption made by some of the High Courts in India, that Section 74 applies only to cases where the aggrieved party is seeking to receive some amount on breach of contract and not to cases whereupon breach of contract an amount received under the contract is sought to be forfeited. In our judgment the expression "the contract contains any other stipulation by way of penalty" comprehensively applies to every covenant involving a penalty whether it is for payment on breach of contract of money or delivery of property in future, or for forfeiture of right to money or other property already delivered. Duty not to enforce the penalty clause but only to award reasonable compensation is statutorily imposed upon courts by

Section 74 In all cases, therefore, where there is a stipulation in the nature of penalty for forfeiture of an amount deposited pursuant to the terms of contract which expressly provides for forfeiture, the court has jurisdiction to award such sum only as it considers reasonable but not exceeding the amount specified in the contract as liable to forfeiture.", and that,

"There is no ground for holding that the expression "contract contains any other stipulation by way of penalty" is limited to cases of stipulation in the nature of an agreement to pay money or deliver property on breach and does not comprehend covenants under which amounts paid or property delivered under the contract, which by the terms of the contract expressly or by clear implication are liable to be forfeited." (Underlining added)

6. In Union of India Vs. Raman Iron Foundry (1974) 2

SCC 231 there are similar conclusions. Para 11 of this judgment

reads as under:-

"11. Having discussed the proper interpretation of Clause 18, we may now turn to consider what is the real nature of the claim for recovery of which the appellant is seeking to appropriate the sums due to the respondent under other contracts. The claim is admittedly one for damages for breach of the contract between the parties. Now, it is true that the damages which are claimed are liquidated damages under Clause 14, but so far as the law in India is concerned, there is no qualitative difference in the nature of the claim whether it be for liquidated damages or for unliquidated damages. Section 74 of the Indian Contract Act eliminates the somewhat elaborate refinements made under the English common law in distinguishing between stipulations providing for payment of liquidated damages and stipulations in the nature of penalty. Under the common law a genuine pre-estimate of damages by

mutual agreement is regarded as a stipulation naming liquidated damages and binding between the parties : a stipulation in a contract in terrorem is a penalty and the Court refuses to enforce it, awarding to aggrieved party only reasonable compensation. The Indian Legislature has sought to cut across the web of rules and presumptions under the English common law, by enacting a uniform principle applicable to all stipulations naming amounts to be paid in case of breach, and stipulations by way of penalty, and according to this principle, even if there is a stipulation by way of liquidated damages, a party complaining of breach of contract can recover only reasonable compensation for the injury sustained by him, the stipulated amount being merely the outside limit. It, therefore makes no difference in the present case that the claim of the appellant is for liquidated damages. It stands on the same footing as a claim for unliquidated damages. Now the law is well settled that a claim for unliquidated damages does not give rise to a debt until the liability is adjudicated and damages assessed by a decree or order of a Court or other adjudicatory authority. When there is a breach of contract, the party who commits the breach does not eo instanti incur any pecuniary obligation, nor does the party complaining of the breach becomes entitled to a debt due From the other party. The only right which the party aggrieved by the breach of the contract has is the right to sue for damages.................The Court in the first place must decide that the defendant is liable and then it proceeds to assess what that liability is. But till that determination there is no liability at all upon the defendant." (Underlining added)

7. In view of the ratio of the decisions of the Supreme Court

in the aforesaid judgments, it is trite that if losses can be proved,

then, a clause of liquidated damages is void. I may hasten to add

that there are two types of contracts. One set of contracts are those

contracts where it is not possible to estimate and prove the losses.

One of such contracts was the contract which was the subject matter

of a Constitution Bench decision of the Supreme Court in the case of

Sir Chunilal V. Mehta & Sons Ltd. Vs. Century Spinning and

Manufacturing Co. Ltd. AIR 1962 SC 1314 (1) wherein the

Supreme Court allowed liquidated damages where the contract was

as managing agents with a return of percentage of profits of 21

years and on which managing agency agreement having been

wrongly terminated it would not have been known that how much

would have been earned as share of profits over 21 years once the

contract was found to be illegally terminated. Therefore claim of

liquidated damages was allowed. Other set of contracts are those

contracts which were the subject matter of the decision of the

Supreme Court in the case of O.N.G.C. Vs. Saw Pipes Ltd., 2003

(5) SCC 705 wherein with respect to contract for construction of an

oil rig, the Supreme Court said that liquidated damages can be

claimed because it cannot be estimated and proved that what would

be the loss on account of the delayed construction of an oil rig

because what would have been the losses were dependent on

factors such as amount of production (including prices of crude oil

at different times) of oil which could not be exactly estimated. In

the case of O.N.G.C. Vs. Saw Pipes Ltd. (supra) the Supreme

Court has also referred to a case of delay in construction of a toll

road and said that in such contracts again there is an entitlement to

liquidated damages because what would have been the loss caused

by number of days of delay in construction of toll roads cannot be

estimated as how many vehicles which would have passed cannot

be exactly arrived at and hence therefore the clause with respect to

liquidated damages is not in the nature of penalty.

8. In the present case, surely losses which were caused to

the appellant/defendant, with respect to the sale of machine in

question could very well have been proved because if the

appellant/defendant was forced to sell the machine for an amount

lesser than Rs.4,00,000/- (the price at which the respondent/plaintiff

agreed to buy the same) then, by difference of receipt of lesser price

such loss could have been pleaded and proved and hence, subject to

the upper limit of the earnest money deposited, such loss could well

have been claimed by the appellant/defendant. Admittedly, the

appellant/defendant in the facts of the present case has neither

pleaded nor proved any loss having been caused to it on account of

breach of contract by the respondent/plaintiff.

9. The Trial Court has therefore rightly held that since such

loss has not been pleaded and proved, the appellant/plaintiff was

bound to refund the earnest money/advance price which was

received by the appellant in the auction conducted on 19.12.1998.

The relevant observations of the Trial Court in this regard are

contained in para 13, and the same reads as under:-

"13. The question that arises next is whether the defendant could have legally forfeited the earnest money. Needless to say that the clause providing for forfeiture of earnest money was a penal clause. A clause in the nature of penalty could not have been enforced in its entirety by reason of Section 74 of the Indian Contract Act. There is nothing to suggest that the amount of penalty was a genuine pre-estimate of damages likely to be suffered by the defendant in the event of breach of contract on the part of bidder. Section 74 lays down that the party complaining of breach is entitled, whether or not actual damages or loss is proved to have been caused thereby, to receive from the defaulting party a reasonable compensation not exceeding the amount of penalty stipulated for. The words "whether or not actual damages or loss is proved to have been caused thereby" have been considered in several case and it has been held that these words merely exempt the complaining party from proving the actual loss or damage. These words do not at all covey that compensation is to be awarded in all cases whether some loss or damage has been occasioned or not. Thus, a compensation can be awarded only when the complaining party has suffered some loss or damage as a result of breach of contract by the other party. It is another matter that it is not obligatory to adduce positive evidence of such damage or loss. If there has been no damage or loss in consequence of breach of contract, the question of awarding or claiming compensation does not arise. In the present case, the defendant has nowhere alleged in the Written Statement that it suffered any loss as a result of plaintiff's failure to deposit the balance auction money. Therefore, the forfeiture of earnest money cannot be justified."

10. In view of the above, there is no illegality or perversity in

the impugned judgment which calls for interference by this court.

The appeal being devoid of merit is accordingly dismissed, leaving

the parties to bear their own costs.

11. The appellant has deposited the decretal amount in this

Court. The amount deposited in this Court along with accrued

interest, if any, be released to the respondent/plaintiff in full and

final satisfaction of the claim of the respondent/plaintiff under the

subject money decree. Trial Court record be sent back.

VALMIKI J. MEHTA,J NOVEMBER 16, 2011 ak

 
Download the LatestLaws.com Mobile App
 
 
Latestlaws Newsletter
 

Publish Your Article

 

Campus Ambassador

 

Media Partner

 

Campus Buzz

 

LatestLaws Guest Court Correspondent

LatestLaws Guest Court Correspondent Apply Now!
 

LatestLaws.com presents: Lexidem Offline Internship Program, 2026

 

LatestLaws.com presents 'Lexidem Online Internship, 2026', Apply Now!

 
 

LatestLaws Partner Event : IJJ

 

LatestLaws Partner Event : Smt. Nirmala Devi Bam Memorial International Moot Court Competition

 
 
Latestlaws Newsletter