Premium Agro Exports Ltd vs The Jute Corporation Of India Ltd
2026 Latest Caselaw 234 Cal/2

Citation : 2026 Latest Caselaw 234 Cal/2
Judgement Date : 29 January, 2026

[Cites 12, Cited by 0]

Calcutta High Court

Premium Agro Exports Ltd vs The Jute Corporation Of India Ltd on 29 January, 2026

                   IN THE HIGH COURT AT CALCUTTA
                 ORDINARY ORIGINAL CIVIL JURISDICTION                           2026:CHC-OS:22

                           ORIGINAL SIDE
                       (COMMERCIAL DIVISION)

                         RESERVED ON: 03.12.2025
                         DELIVERED ON: 29.01.2026

                                PRESENT:
                     HON'BLE JUSTICE GAURANG KANTH

                             AP-COM 106 OF 2024

                     PREMIUM AGRO EXPORTS LTD.
                               VERSUS
                  THE JUTE CORPORATION OF INDIA LTD.

Appearance:

Mr. Sakya Sen, Sr. Adv.
Mr. Sankarsan Sarkar, Adv.
Mr. Jaydeb Ghorai, Adv.
Mr. Diptesh Ghorai, Adv.
                                                         ... for the petitioner

Mr. Aman Agarwal, Adv.
Mr. Debabrata Das, Adv.
Mr. Tirthankar Nandi, Adv.                              ... for the respondent


                                   JUDGMENT

Gaurang Kanth, J.:-

1. The Petitioner preferred the present arbitration petition under Section 34 of

the Arbitration and Conciliation Act, 1996 challenging the award dated

07.12.2010 passed by the Sole Arbitrator, Mr. Sanjib Mishra.

2. The facts leading to the present Petition are as follows:

3. The Petitioner is a jute manufacturing company employing more than

2,000 workmen. Owing to financial constraints, the Petitioner engaged

M/s S.B. Overseas Ltd. for the purpose of financing and procurement of

raw jute of specified quality for its jute mill from various sellers. The said

entity was also acting on behalf of four other jute mills, namely Baranagar

2026:CHC-OS:22 Jute Factory PLC, Loomtex Engineering Private Ltd., Agarpara Jute Mills

Ltd., and Empire Jute Corporation Ltd., all situated in the State of West

Bengal. M/s PEC Ltd., a Government of India enterprise, was engaged for

the purpose of opening letters of credit for and on behalf of the Petitioner

in favour of the Respondent.

4. The Respondent, 'The Jute Corporation of India Ltd.', is a Government of

India undertaking functioning as a price support agency with the mandate

to procure raw jute from jute growers at the Minimum Support Price

declared annually by the Government of India. The raw jute so procured is

sold by the Respondent through different channels, including B-Twill

Linkage and e-tender, to users of raw jute.

5. M/s S.B. Overseas Ltd., acting on behalf of the Petitioner and the four

other jute mills, by letter dated 07.09.2006, booked a total quantity of

40,000 quintals of raw jute and deposited an amount of Rs.35,00,000/- as

security deposit, pending furnishing of a bank guarantee or opening of a

letter of credit in favour of the Respondent.

6. Pursuant thereto, two agreements were entered into between the parties,

namely, (i) Agreement dated 08.09.2006 bearing No. JCI/223/2006-

07/FS-5 for procurement of raw jute from South Bengal and the Purnea

area; and (ii) Agreement dated 11.09.2006 bearing No. JCI/223/2006-

07/FS-6 for procurement of raw jute from Guwahati, Assam.

7. Under the said two agreements, the Respondent agreed to supply various

grades of raw jute aggregating to 1,800 quintals each to the Petitioner for a

total consideration of Rs. 26,40,000/- and Rs. 28,47,500/- respectively,

subject to the terms and conditions contained therein.

8. In terms of the agreements, the Petitioner was required to deposit 2026:CHC-OS:22 a

security amount equivalent to 5% of the contract value within five working

days. By letter dated 03.11.2006, M/s S.B. Overseas Ltd., acting on behalf

of the Petitioner, informed the Respondent that the Petitioner was unable

to deposit the said security amount or make full payment at one time. It

was indicated therein that a sum of Rs.35,00,000/- had already been

deposited and that supply of raw jute may be made on a pro-rata basis,

with the balance quantity to be lifted in two instalments. As per the two

contracts as mentioned herein above, the total quantity to be supplied to

the Petitioner was 3,600 quintals. Pursuant thereto, the Respondent

supplied 444 quintals of raw jute, leaving a balance quantity of 3,152

quintals.

9. The record indicates that the Respondent procured and stored the requisite

quantity of raw jute for delivery under the said contracts. Subsequently, by

letter dated 22.11.2006, M/s S.B. Overseas Ltd. informed the Respondent

that the Petitioner would not be in a position to perform the contracts and

communicated cancellation thereof.

10. Thereafter, disputes arose between the parties in relation to the non-lifting

of the remaining quantity of raw jute. The Respondent invoked the

arbitration clause contained in the agreements and referred the disputes

to arbitration by way of a single reference before the learned Sole

Arbitrator, Shri Sanjib Misra.

11. Both parties appeared before the learned Sole Arbitrator and filed their

respective pleadings. Upon consideration of the same, six issues were

framed for adjudication. After conclusion of the arbitral proceedings, the

learned Sole Arbitrator passed an Award dated 07.12.2010, whereby a

sum of Rs.12,58,746/- was awarded in favour of the Respondent, with2026:CHC-OS:22 a

direction that the said amount be paid within three months from the date

of the Award, failing which it would carry interest at the rate of 10% per

annum. The present petition under Section 34 of the Arbitration and

Conciliation Act, 1996 has been filed assailing the said Award.

Submission on behalf of the Petitioner

12. Learned Counsel for the Petitioner contends that the impugned Award is

contrary to the mandate of Section 28(3) of the Arbitration and

Conciliation Act, 1996, inasmuch as the learned Sole Arbitrator failed to

adjudicate the disputes in accordance with the terms of the contract.

13. Learned Counsel for the Petitioner further submits that the methodology

adopted by the learned Arbitral Tribunal in computing the alleged loss is

wholly untenable and contrary to settled principles of law. It is contended

that the alleged breach is stated to have occurred on 22.11.2006, when the

Petitioner cancelled the purchase orders for reasons recorded therein.

However, under Clauses 4.7 and 2.2 of the contract, the Petitioner was

required to lift the entire contracted quantity of jute within 60 days from

the opening of the Letter of Credit. Admittedly, no Letter of Credit was ever

opened. Consequently, the contract stood terminated by efflux of time on

08.11.2006, reckoned from the date of commencement of the contract.

Despite the termination of the contract, the Respondent unilaterally

treated the contract as subsisting and called upon the Petitioner to

perform its alleged obligations thereunder. It is submitted that, in law, the

Respondent could claim damages, if at all, only as on the date of

breach/termination, i.e., 08.11.2006, and such damages would necessarily

2026:CHC-OS:22 be confined to the difference between the contract price and the prevailing

market price on that date.

14. Learned Counsel further submits that the evidence on record unequivocally

demonstrates that, on the date of termination, there was no difference

between the contract price and the prevailing market price of jute. In the

absence of any proven loss on the date of breach, the Arbitral Tribunal

could not have awarded damages for breach of contract. However, the

learned Arbitrator committed a patent illegality in determining the base

price of jute on the basis of market rates prevailing nearly four months

after the termination of the contract. Any assessment of loss, even

assuming it to be permissible, ought to have been undertaken strictly with

reference to the market rate prevailing on the date of

cancellation/termination and not on the basis of a subsequently fluctuated

market rate. The impugned award, therefore, runs directly contrary to

Section 73 of the Indian Contract Act, 1872, which mandates that

compensation must correspond to the loss actually suffered at the time of

breach. In support of the aforesaid submissions, reliance is placed upon

Muralidhar Chiranjilal v. Harishchandra Dwarakadas, reported as

1961 SCC OnLine SC 100; H.J. Baker & Brothers Inc. v. Minerals and

Metals Trading Corporation Ltd., reported as (2023) 9 SCC 424;

Sitaram Srigopal v. Smt. Daulati Devi, reported as (1979) 4 SCC 351;

and Sundareswaran v. M/s Sri Krishna Refineries, reported as 1976

SCC OnLine Mad 68.

15. It is next contended that the impugned Award is arbitrary, perverse, and

legally unsustainable as no actual loss or damage was suffered by the

Respondent.

2026:CHC-OS:22

16. It is further urged that the learned Arbitrator erred in computing the

alleged loss in the absence of any cogent evidence on record. No material

or documentary evidence was produced by the Respondent to substantiate

the alleged carrying charges or other incidental expenses said to have been

incurred due to non-lifting of the jute by the Petitioner. It is submitted that

the Respondent also failed to take any reasonable steps to mitigate its

alleged losses, and as such, was not entitled to claim any damages.

Reliance is placed on Ssangyong Engineering & Construction Company

Ltd v. NHAI reported as 2019 (15) SCC 131.

Submission on behalf of the Respondent

17. Per contra, Learned Counsel for the Respondent has supported the

impugned Award and submitted that the same is reasoned, well-

considered, and based upon the material placed on record. It is contended

that the Respondent had duly performed its contractual obligations and

had procured and stored the requisite quantity of raw jute for delivery to

the Petitioner. However, despite repeated assurances, the Petitioner,

through its agent M/s S.B. Overseas Ltd., failed to lift the balance quantity

of raw jute, thereby committing a clear breach of the contract.

18. It is further submitted that the learned Arbitrator, after due consideration

of the pleadings and evidence, assessed the loss suffered by the

Respondent in accordance with the terms of the contract and the

prevailing circumstances. The Respondent incurred substantial expenses

towards procurement, storage, handling, and maintenance of the unsold

jute due to the Petitioner's failure to lift the same. The Award, therefore,

represents a fair and equitable determination of the losses suffered and

cannot be interfered with merely because another view is possible.

2026:CHC-OS:22

19. Learned Counsel for the Respondent thus submits that the findings

recorded by the learned Sole Arbitrator are based on due appreciation of

facts and evidence, and that the scope of interference by this Court under

Section 34 of the Arbitration and Conciliation Act, 1996, being limited, no

ground is made out for setting aside the Award. Reliance is placed on OPG

Power Generation Pvt Ltd v. Enexio Power cooling Solutions India Pvt

Ltd reported as 2025 (2) SCC 417, Reliance Infrastructure Ltd v. State

of Goa reported as 2024 (1) SCC 479, Delhi Airport Metro Express Pvt

Ltd v. DMRC reported as 2022 (1) SCC 131.

Legal Analysis

20. This Court heard the arguments advanced by both the parties and

examined the documents placed on record.

21. During the arbitral proceedings, the learned Sole Arbitrator framed six

issues and adjudicated the Respondent's claims on the basis of the

findings recorded thereon. Although the principal challenge in the present

proceedings is confined to Issue No. 6, this Court, for the sake of

completeness and continuity of reasoning, considers it appropriate to

examine the findings of the Arbitral Tribunal issue-wise.

Issue No.1: Whether the contract signed between the parties is a concluded contract and is binding between the parties

22. The learned Sole Arbitrator decided this issue in the affirmative, upon

consideration of the following material aspects:

(i) That both the parties, with full knowledge and consent, executed

two written contracts dated 08.09.2006 bearing No. JCI/223/2006-

07/FS5 and 11.09.2006 bearing No. JCI/223/2006-07/FS6, under

which the Respondent agreed to supply various grades of raw jute

2026:CHC-OS:22 aggregating 1800 quintals to the Petitioner for a total consideration

of Rs. 26,40,000/- and Rs. 28,47,500/- respectively.

(ii) That M/s S.B. Overseas Ltd., acting on behalf of the Petitioner, by its

letter dated 03.11.2006, informed the Respondent that due to

financial constraints, the Petitioner was unable to make full

payment or furnish the stipulated security deposit. It was, however,

stated that a sum of Rs. 35,00,000/- was being deposited and a

request was made to supply raw jute on a pro-rata basis, with an

assurance that the remaining quantity would be lifted in two

installments. Acting upon the said request, the Respondent supplied

444 quintals of raw jute to the Petitioner.

(iii) That the parties had duly signed and acted upon the written

contracts, clearly evincing their intention to be bound by the

contractual terms, and therefore, a concluded and enforceable

contract existed between them.

23. Upon consideration of the record, this Court finds no infirmity or

perversity in the finding of the learned Sole Arbitrator. The conclusion that

a concluded contract existed between the parties is supported by

documentary evidence as well as by the admitted conduct of the Petitioner

in accepting partial supply against payment. The correspondence and

performance clearly establish that the parties treated the agreement as

operative and binding. The view taken by the learned Arbitrator is a

plausible and reasonable interpretation of the contractual terms and

cannot be said to be perverse or contrary to law.In view of the above, this

Court finds no infirmity or perversity in the finding of the learned Sole

Arbitrator that a concluded contract existed between the parties. The said

2026:CHC-OS:22 finding, being based on due appreciation of evidence and consistent with

the contractual record, warrants no interference and is accordingly

upheld.

Issue No. 2: Whether there has been a novation of the contract due to part supply of jute and consequent adjustment of Rs. 35,00,000/- deposited by the representatives of the jute mills, as per the written and oral requests made by the said mills.

24. The learned Sole Arbitrator decided this issue in the negative, recording the

following reasons:

(i) That by letter dated 03.11.2006, M/s S.B. Overseas Ltd., acting as

the agent of the jute mills, requested the Respondent to adjust a

sum of Rs. 35,00,000/- as advance payment and to supply an

equivalent quantity of raw jute to the various jute mills. It was

further stated therein that the balance payment would be made in

two installments on 20.11.2006 and 04.12.2006, and that the entire

quantity of jute would be lifted accordingly. The Respondent

accepted the said proposal and, acting thereon, supplied jute to the

respective mills.

(ii) Although the clause relating to the security deposit was not adhered

to by either party, the main contract otherwise remained operative

and binding between them.

(iii) From the tenor of the letter dated 03.11.2006 and the subsequent

conduct of the parties, it was evident that both parties intended to

continue with and act upon the principal contract.

(iv) It was never the intention of the parties to substitute or supersede

the original contract, but rather to perform it with certain mutually

agreed deviations. The mere waiver or non-enforcement of one

2026:CHC-OS:22 particular clause, by mutual consent, cannot be construed as

novation of the entire contract.

(v) Relying on Section 62 of the Indian Contract Act, 1872, the learned

Sole Arbitrator held that novation requires substitution of a new

contract in place of an existing one, which was not the case herein.

The correspondence and conduct of the parties demonstrated

continuity of the original contractual relationship rather than

substitution or extinguishment thereof. Accordingly, the learned

Arbitrator concluded that there was no novation of the main

contract, and that the written agreements dated 08.09.2006 and

11.09.2006 continued to remain valid, subsisting, and binding

between the parties.

25. This Court finds no infirmity in the view taken by the learned Sole

Arbitrator. The finding that there was no novation of the contract is based

on a correct appreciation of the facts and the law. The conduct of the

parties, including the acceptance of part supply and adjustment of

advance payment, clearly indicates continuation of the original contractual

arrangement rather than substitution thereof. The reasoning of the learned

Arbitrator is consistent with Section 62 of the Indian Contract Act, 1872,

and does not suffer from any perversity or illegality warranting

interference. Accordingly, the said finding is upheld.

Issue No. 3: What is the cumulative effect of Clauses 4.3, 4.6 and 4.7 of the contract requiring payment of security deposit and the consequent recovery of amounts therefrom by the claimant due to the failure of the respondent to lift the goods.

26. The learned Sole Arbitrator, while deciding this issue, observed that

Clauses 4.3, 4.6, and 4.7 of the contract conferred upon the Respondent

2026:CHC-OS:22 the right to forfeit the security deposit and/or to take such other remedial

measures as enumerated therein in the event of default by the buyer.

However, in the present case, since the Respondent, acting in good faith,

had adjusted the amount of Rs. 35,00,000/- deposited by the Petitioner

towards part supply of jute, the Respondent had effectively waived the

enforcement of these clauses. The learned Arbitrator noted that by

choosing to supply jute against the said advance payment instead of

insisting upon the security deposit, the Respondent voluntarily gave a go-

by to the stipulation regarding security deposit and thereby relinquished

its right to invoke or exercise the remedies contemplated under the said

clauses. Consequently, in the absence of any subsisting security deposit,

the question of recovering any amount or charge therefrom did not arise.

27. This Court finds no illegality or perversity in the above reasoning of the

learned Sole Arbitrator. The conclusion is based on a logical interpretation

of the contract and is supported by the conduct of the parties. The view

taken by the learned Sole Arbitrator is, therefore, just, equitable, and in

accordance with law, and the same is hereby upheld.

Issue no. 4: What is the effect of Clause 12.1 of the contract authorising the claimant to take steps as enumerated therein in case the respondents violate the contract thereby causing loss to the claimant

28. While examining and interpreting Clause 12.1 of the contract, the learned

Sole Arbitrator observed that the said clause operates independently of

other provisions of the agreement, including those relating to the security

deposit. The clause unequivocally empowers the Respondent to take such

measures as specified therein in the event of any breach or default by the

Petitioner causing loss or damage to the Respondent. The learned

Arbitrator, therefore, concluded that the Respondent is legally entitled to

2026:CHC-OS:22 recover the loss, if any, occasioned by the Petitioner's failure to perform its

contractual obligations. Clause 12.1, being a comprehensive and enabling

provision, confers plenary authority upon the Respondent to take

appropriate action to safeguard its interests and recover any consequential

loss.

29. This Court finds no infirmity in the interpretation placed by the learned

Sole Arbitrator. The reasoning is consistent with the plain language and

intent of Clause 12.1, which was evidently inserted to provide the

Respondent with a contractual remedy independent of other stipulations.

The finding is neither perverse nor contrary to law and, therefore, merits

affirmation. Accordingly, the conclusion of the learned Sole Arbitrator on

this issue is upheld.

Issue No. 5: Whether the Claimant suffered loss by the action of the respondent and the extent of such loss

30. The learned Sole Arbitrator, upon a detailed examination of the evidence

and contractual terms, held that the Respondent had procured raw jute in

accordance with the concluded contract entered into between the parties.

However, midway through the contractual performance, the Petitioner,

citing financial constraints, refused to lift the remaining quantity of jute

and thereby unilaterally terminated its obligation under the contract.

31. The learned Arbitrator observed that as a direct consequence of the

Petitioner's failure to lift the balance quantity, the Respondent incurred

substantial losses on several counts, including storage and godown

charges, carriage expenses, and additional handling costs. Further, the

Respondent also suffered loss on account of the fall in the market price of

raw jute during the relevant period. The learned Arbitrator, therefore,

2026:CHC-OS:22 concluded that the losses sustained by the Respondent were a direct result

of the Petitioner's breach and that, under the principles embodied in the

Contract Act, the Petitioner was liable to compensate the Respondent for

such loss.

32. This Court finds no infirmity or perversity in the findings and reasoning of

the learned Sole Arbitrator. The conclusion is supported by the material on

record and is in consonance with the settled principles governing

contractual compensation. The assessment of loss and the consequent

award rendered by the learned Sole Arbitrator are thus held to be just,

reasonable, and in accordance with law. Accordingly, the finding and

award on this issue are upheld.

Issue No. 6: Whether the Claimant is entitled to relief and if so, to what extent ?

33. While assessing the quantum of loss, the learned Sole Arbitrator took note

of the admitted position that the stock of raw jute procured by the

Respondent was not sold immediately upon cancellation of the contract.

Having regard to the nature of the Respondent as a government agency

and the attendant procedural and logistical constraints, the learned

Arbitrator reasonably inferred that a reasonable period would necessarily

elapse before the stock could be disposed of. Upon such appreciation of

the evidence, the learned Arbitrator assessed a period of four months as a

reasonable time for effecting sale and, accordingly, adopted the market

value of jute prevailing four months after the termination of the contract

for the purpose of quantifying loss.

34. The learned Arbitrator further relied upon the price list issued by the Jute

Balers Association and determined that the difference between the

2026:CHC-OS:22 contractual rate and the prevailing market rate represented the actual loss

suffered per quintal. On this basis, the loss was quantified at Rs.165 per

quintal, aggregating to Rs.2,23,740/- (Rs.165 × 1356 quintals) for

Contract No. JCI/223/2006-07/FS5 and Rs.2,97,000/- (Rs.165 × 1800

quintals) for Contract No. JCI/223/2006-07/FS6. The learned Arbitrator

also noted that a similar methodology had been adopted and accepted in a

prior arbitral award arising out of comparable transactions, thereby

ensuring consistency and uniformity in assessment.

35. In addition thereto, the learned Arbitrator considered Clause 4.6 of the

contract, which expressly provided for storage charges at the rate of Rs.25

per quintal per month. Applying the said contractual stipulation, the

carrying and storage losses were computed at Rs.1,35,600/- (1356

quintals × Rs.25 × 4 months) for FS5 and Rs.1,80,000/- (1800 quintals ×

Rs.25 × 4 months) for FS6.

36. Re-appreciation of evidence or substitution of the Arbitrator's view with

that of the Court is impermissible so long as the view adopted is a

plausible one. This principle stands authoritatively reiterated in Delhi

Airport Metro Express Pvt. Ltd. (Supra), wherein the Hon'ble Supreme

Court held that even an erroneous application of law or an alternative

interpretation of contractual terms does not warrant interference unless

the award is vitiated by perversity or patent illegality going to the root of

the matter.

37. The said position has been further reinforced in Reliance Infrastructure

Ltd. (supra), wherein the Hon'ble Supreme Court emphasised that Section

34 proceedings are supervisory in nature and that courts must refrain

from undertaking a merits based review or reassessing the sufficiency of

2026:CHC-OS:22 evidence relied upon by the Arbitrator. Similarly, in OPG Power

Generation Pvt. Ltd. (supra), the Hon'ble Supreme Court reiterated that

once the Arbitrator has taken a possible view on the basis of the

contractual framework and evidence on record, the same cannot be

interdicted merely because another view is conceivable.

38. Viewed in this backdrop, the approach adopted by the learned Arbitrator

cannot be faulted on the strength of the decisions relied upon by the

Petitioner. Muralidhar Chiranjilal (supra) and Sitaram Srigopal (supra)

arose out of civil suits, where the Appellate Court exercises plenary

jurisdiction to re-appreciate evidence and substitute its own conclusions.

Those principles operate in a materially different context and cannot be

mechanically applied to arbitral proceedings. In the present case, this

Court is exercising limited jurisdiction under Section 34 of the Arbitration

and Conciliation Act, 1996, and does not sit in appeal over the findings of

the Arbitral Tribunal. Interference is confined to statutorily recognised

grounds such as patent illegality or conflict with the public policy of India.

39. The contention that loss must invariably be assessed with reference to the

market price on the date of breach also cannot be accepted as an inflexible

rule. While Muralidhar Chiranjilal (supra) recognises the general

principle of valuation as on the date of breach, it equally acknowledges the

duty to mitigate loss and does not prohibit assessment with reference to a

later date where immediate resale is not reasonably possible. In the

present case, the learned Arbitrator has returned a categorical finding of

fact, based on evidence, that the stock of jute could not have been sold

immediately upon termination and that a period of four months

constituted a reasonable time for disposal, particularly having regard to

2026:CHC-OS:22 the Respondent's status as a government agency. The assessment of loss

on the basis of contemporaneous market data after such reasonable period

is neither speculative nor remote, but a commercially realistic view

consistent with Section 73 of the Contract Act. In view of the limited scope

of interference under Section 34, as reiterated in Delhi Airport Metro

Express Pvt. Ltd. (supa), Reliance Infrastructure Ltd. (supra), and OPG

Power Generation Pvt. Ltd. (supra), this Court cannot substitute its own

view merely because an alternative computation is possible.

40. The reliance on Sitaram Srigopal (supra) is also misconceived. There,

damages were awarded by the Trial Court on conjectural tabulation of

prices without reliable evidence of the market value of goods of comparable

quality. The Appellate Bench, upon reappraisal of evidence, found that the

goods were old and second hand, while the evidence relied upon pertained

to new goods, and consequently held that no actual loss was proved, a

conclusion affirmed by the Hon'ble Supreme Court. The present case

stands on an entirely different footing. Here, the learned Arbitrator has

recorded clear findings of fact, supported by contemporaneous material,

regarding the market value of the goods and the reasonable period

required for mitigation. There is neither absence of evidence nor any

mismatch in quality, and the quantification of loss is reasoned and

evidence based, warranting no interference under Section 34.

41. The decisions in H.J. Baker & Brothers Inc(supra). and Sundareswaran

(supra) also do not advance the Petitioner's case. Both turned on the

absence of any contractual or evidentiary foundation for adopting post-

breach price variations. In contrast, the present case involves express

contractual provisions governing storage charges and performance

2026:CHC-OS:22 obligations, coupled with a clear factual finding that immediate resale was

not commercially feasible. The determination of loss is thus grounded in

evidence and contract, excluding any element of speculation.

42. The reliance on Ssangyong Engineering & Construction Company Ltd.

(supra) is equally misplaced. In that case, the Hon'ble Supreme Court

interfered as the Tribunal had introduced a unilateral formula for price

adjustment, contrary to the contract, thereby rewriting its terms and

attracting patent illegality. In the present case, the learned Arbitrator has

acted strictly within the contractual framework and adopted a plausible

methodology based on contractual stipulations and contemporaneous

market data. The award neither rewrites the contract nor discloses any

perversity, patent illegality, or violation of public policy. Consequently, the

ratio of Ssangyong Engineering & Construction Company Ltd. (supra)

has no application to the facts of the present case.

Conclusion

43. In light of the foregoing discussion and upon a careful examination of the

arbitral record, this Court finds that the learned Sole Arbitrator has duly

appreciated the evidence, interpreted the contractual terms correctly, and

rendered findings based on a reasonable and cogent analysis of the

material placed before him. The learned Arbitrator has rightly held that the

Petitioner, having failed to lift the balance quantity of raw jute in terms of

the concluded contracts, was in breach of its contractual obligations, and

that the Respondent, being a Government agency, had indeed suffered

quantifiable losses on account of storage, handling, and the decline in jute

prices. The computation of loss and the award of Rs.12,58,746/-, along

with interest, are supported by both factual and legal reasoning.

44. This Court is mindful of the settled legal position that under Section 34 2026:CHC-OS:22 of

the Arbitration and Conciliation Act, 1996, the scope of interference with

an arbitral award is narrow and circumscribed. The Court cannot act as

an appellate authority to reappreciate evidence or substitute its own

interpretation for that adopted by the Arbitrator. Where two possible

interpretations of a contract or factual inference exist, and the Arbitrator

has taken one which is plausible and not perverse, the Court must defer to

that view.

45. In the present case, the findings of the learned Sole Arbitrator neither

disclose any perversity nor any patent illegality apparent on the face of the

record. The award is not contrary to the public policy of India, nor does it

offend the fundamental principles of justice or morality. On the contrary, it

reflects a reasoned, fair, and judicious approach consistent with the intent

of the Arbitration and Conciliation Act, 1996.

46. Accordingly, this Court finds no merit in the present petition. The arbitral

award dated 07.12.2010 passed by the learned Sole Arbitrator, Shri Sanjib

Misra, is upheld in its entirety. The petition under Section 34 of the

Arbitration and Conciliation Act, 1996, is therefore dismissed.

(GAURANG KANTH, J.)

Sakil Amed P.A.

 
Download the LatestLaws.com Mobile App
 
 
Latestlaws Newsletter
 

Publish Your Article

 

Campus Ambassador

 

Media Partner

 

Campus Buzz

 

LatestLaws Guest Court Correspondent

LatestLaws Guest Court Correspondent Apply Now!
 

LatestLaws.com presents: Lexidem Offline Internship Program, 2026

 

LatestLaws.com presents 'Lexidem Online Internship, 2026', Apply Now!

 
 

LatestLaws Partner Event : IJJ

 

LatestLaws Partner Event : Smt. Nirmala Devi Bam Memorial International Moot Court Competition

 
 
Latestlaws Newsletter