Hiraman Yashwant Kathe And Ors vs The State Of Maharashtra And Ors
2024 Latest Caselaw 26363 Bom

Citation : 2024 Latest Caselaw 26363 Bom
Judgement Date : 15 October, 2024

Bombay High Court

Hiraman Yashwant Kathe And Ors vs The State Of Maharashtra And Ors on 15 October, 2024

Author: G. S. Kulkarni

Bench: G. S. Kulkarni

    2024:BHC-AS:40842-DB


                                                                                 J-926-ASWP-12039-2019+.doc



                                           IN THE HIGH COURT OF JUDICATURE AT BOMBAY
                                                  CIVIL APPELLATE JURISDICTION


                                                  WRIT PETITION NO. 12039 OF 2019
                                                               WITH
                                              INTERIM APPLICATION NO. 3715 OF 2023
                                                                 IN
                                                  WRIT PETITION NO. 12039 OF 2019


                              1. Hiraman Yashwant Kathe

                                 Age: 60 years, Occ. Agriculturist


                              2. Shridhar Yashwant Kathe

                                 Age: 58 years, Occ. Agriculturist

                              3. Bhausaheb Karbhari Gade

                                  Age: 55 years, Occ. Agriculturist

                              4. Vinayak Sukdeo Kendale

                                  Age: 43 years, Occ. Agriculturist

                              5. Dagu Sukdeo Kendale

                                  Age: 52 years, Occ. Agriculturist

                              6. Rajaram Sawliram Borade

                                  Age: 60 years, Occ. Agriculturist

                              7. Arun Ragho Ichal

                                  Age: 55 years, Occ. Agriculturist

                              8. Haribhau Waman Ichal
          Digitally
          signed by
          ASHWINI
ASHWINI   JANARDAN
JANARDAN VALLAKATI
VALLAKATI Date:
          2024.10.15
          17:29:23
                                                                Page 1 of 25
          +0530

                                                              October 15, 2024
                       Ashwini Vallakati




                               ::: Uploaded on - 15/10/2024                          ::: Downloaded on - 16/10/2024 00:19:30 :::
                                                            J-926-ASWP-12039-2019+.doc



           Age: 57 years, Occ. Agriculturist

       9. Kishor Dagu Gaikwad

           Age: 35 years, Occ. Agriculturist

       10. Rajendra Dagu Gaikwad

             Age: 55 years, Occ. Agriculturist                                ...Petitioners/
             All R/o. Mauje Akrale, Tal : Dindori,                            Applicants
             District : Nashik


                    Versus

      1. The State of Maharashtra
           Through the department of Industry & through
           the Department of Environment Protection,
            Government of Maharashtra, Mantralay,
            Mumbai - 400032

      2. Maharashtra Industrial Development
          Corporation (MIDC)

           A statutory Corporation
           through its Regional Officer
           Udyog Bhavan, Satpur, Dist : Nashik -7

      3. The Land Acquisition, Officer, Nashik

      4. The District Collector, Nashik                                       ...Respondents




   Mr. S.M. Gorwadkar, Senior Advocate , i/b Sanjay H. Gangal,
   Advocates for the Applicants/Petitioner.

   Mr. Prashant Chawan, Senior Advocate, a/w Shraddha Chheda, i/b
   M/s. Navdeep Vora & Associates, Advocates for Respondent No.2.

   Mr. B.V. Samant, Addl.GP, a/w P.M.J. Deshpande, AGP for
   Respondent-State.


                                          Page 2 of 25
                                        October 15, 2024
Ashwini Vallakati




        ::: Uploaded on - 15/10/2024                           ::: Downloaded on - 16/10/2024 00:19:30 :::
                                                              J-926-ASWP-12039-2019+.doc



                     CORAM               : G. S. KULKARNI &
                                           SOMASEKHAR SUNDARESAN, JJ.

                     RESERVED ON         : SEPTEMBER 26, 2024
                     PRONOUNCED ON : OCTOBER 15, 2024


JUDGEMENT:

(Per, Somasekhar Sundaresan J.)

1. Rule. With the consent of the parties, taken up for final hearing

and disposal.

2. This Petition, invoking the jurisdiction under Article 226 of the

Constitution of India, challenges a decision by the Maharashtra Industrial

Development Corporation ("MIDC"), Respondent No.2, communicated on

December 8, 2017 and on April 13, 2018 (collectively, " Impugned Order"),

refusing to refer the dispute raised by the Petitioners to the jurisdictional civil

court under Section 34 of the Maharashtra Industrial Development Act, 1961

("the Act").

3. The Petition prays that the Impugned Order be quashed and set

aside. The Petition seeks a direction that the objections of the Petitioners be

referred to the jurisdictional civil court under Section 34 of the Act. Another

prayer seeks the appointment of a Court Commissioner to work out correct

characterisation of the Petitioners' lands. Finally, a prayer seeks a declaration

that the compensation ought to be computed under the Right to Fair

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

Compensation and Transparency in Land Acquisition, Rehabilitation and

Resettlement Act, 2013 ("2013 Act").

4. With effect from July 3, 2019, the Act was amended to to provide

for linkages with the 2013 Act. Consequently, under Section 33(5), the

principles of computing compensation as provided for in the 2013 Act would

apply to acquisitions under the Act. Likewise, Section 34 has been amended

to provide for references of disputes over compensation to be made to the

"Authority" (as defined in the 2013 Act) instead of references to the "Court"

(as defined in the Land Acquisition Act, 1894). While the prayers and

pleadings in the Petition refer to the civil court, for all purposes of this

judgement, the term "Authority" is used, wherever necessary, in relation to the

forum to which a reference may be made under Section 34 of the Act.

Core Issue:

5. At the heart of the Petition lies the grievance that the classification

of the Petitioners' lands as seasonally-irrigated is wrong and it ought to be

categorised as perennially-irrigated land. It is Petitioners' grievance that such

classification has significantly injured their interests, since under their

agreement with the State, they are being paid an amount of Rs. 52.5 lakhs per

acre (payable for seasonally-irrigated land) as against their entitlement to Rs.

70 lakhs per acre (payable for perennially-irrigated land). The acquisition of

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

the Petitioners' lands were by mutual consent under agreements, which had

provided for a framework of amount payable, the only variation being linked

to the nature of land.

Factual Matrix:

6. The following overview of the factual matrix would be in order:-

a) The Government of Maharashtra, Respondent No.1, issued

a notification on December 6, 2007, declaring an area of

146 Hectares and 35 Ares and another 202 Hectares and

17 Ares in Talegaon Village as an industrial area under the

Act, initiating the statutory process for acquisition;

b) On February 7, 2008, the MIDC authorized the Land

Acquisition Officer, Nashik, Respondent No.3 to

commence the land acquisition proceedings pursuant to

the aforesaid notification;

c) Eventually, on December 17, 2013, agreements were

executed between the Petitioners and the Land Acquisition

Officer under Section 33(2) of the Act, for acquisition of

various parcels of the notified land. The agreements

provided for a framework for computing compensation

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

payable. The amount payable for non-irrigated land was

stated to be Rs.35 Lakhs per acre. For seasonally-irrigated

land and perennially-irrigated land, such amount would be

increased to 1.5 times and 2 times respectively - Rs. 52.50

Lakhs for seasonally-irrigated land; and Rs. 70 Lakhs for

perennially-irrigated land. The terms and conditions

included a stipulation that the landowner would not

initiate any proceedings to air any grievance seeking

enhanced compensation for the land;

d) Different awards were passed on different dates (" Consent

Awards") for various lands owned by the Petitioners under

Section 33(2) of the Act, awarding a total compensation of

Rs.70,92,75,000/-. The Consent Awards record the same

framework for compensation (based on the category the

land would fall under) as set out in the agreements;

e) On November 15, 2014, the Petitioners made a

representation that they should be compensated at the rate

of Rs. 52.50 Lakhs per Acre or Rs. 70 Lakhs per Acre, on

the basis that their land ought not to be classified as non-

irrigated land. Subject to this protest, the Petitioners

accepted payment of Rs.35 Lakhs per acre;

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

f) On November 18, 2015 compensation at the rate of Rs.35

Lakhs per acre was received by the Petitioners;

g) It is seen from the affidavit in reply dated July 13, 2020

("Reply Affidavit"), that on August 11, 2017 the Taluka

Agricultural Officer submitted information that would be

necessary for determination of the categorisation of the

land to the Land Acquisition Officer;

h) The Petitioners made a representation on February 14,

2018 that their representations warranted a reference to

the jurisdictional civil court under Section 34 of the Act;

i) On April 13, 2018 the aforesaid representation was

rejected by way of the Impugned Order. The Impugned

Order recorded that various lands were classified on the

basis of the crop yield data based on crop inspection

entries of a decade prior to the acquisition, and the

compensation as applicable to the respective parcels of

land has been finalised in terms of the framework

contained in the agreements, which also culminated in the

Consent Awards. From the pleadings in the Petition, it

appears that the Petitioners' lands were held to be entitled

to compensation at the rate of Rs. 52.50 lakh per acre, on

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

the premise that it was seasonally-irrigated land, and not

at the rate of Rs. 70 lakh per acre, which is the amount

payable for perennially-irrigated land; and

j) Challenging this decision of April 13, 2018, this Writ

Petition came to be filed over a year later, affirmed on

June 20, 2019.

Contentions of the Parties:

7. We have heard Mr. S.M. Gorwadkar, Learned Senior Counsel on

behalf of the Petitioners, who has determinedly sought to explain that the

Petitioners' stand is simply that mis-classification of the lands has occurred,

which led to the compensation being computed erroneously. Consequently,

he would submit, there is a clear dispute over the compensation, and the

recourse for resolving such a dispute is the reference of such dispute to the

Authority having jurisdiction under Section 34 of the Act.

8. The grounds of attack on the Impugned Order are manifold. One

of the grounds is that the 2013 Act, which has changed the landscape for land

acquisition in India with effect from January 1, 2014, would now govern the

acquisition in question, and that all awards passed under state legislation such

as the Act would be discriminatory and arbitrary. However, Mr. Gorwadkar

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

would fairly state that the core ground of challenge was to the wrongful

categorisation of the lands in question, which has had an injurious effect on

the Petitioners. The agreements and the Consent Awards entail a framework

for computing the compensation, and if the framework is wrongly applied, it

has the effect of erroneous and arbitrary compensation being offered to the

Petitioners, which is amenable to correction by reference to the Authority.

The refusal to refer the dispute to the civil court, Learned Senior Counsel

would submit, ought to be reversed in exercise of the writ jurisdiction of this

Court.

9. According to the pleadings in the Petition, the Petitioners' lands

have been erroneously classified as seasonally-irrigated land giving them

compensation at the rate of Rs.52.50 Lakhs per acre whereas they ought to

have been paid Rs.70 Lakhs per acre on the ground that the lands were

perennially-irrigated. According to Mr. Gorwadkar, the Consent Awards may

appear to be products of conscious agreement, but the agreements in question

only enabled a framework for payment of compensation based on the

categorisation of the land, and did not actually firm up the actual

categorisation of the lands in question. Way back in 2014, the various

landowners had already stated that they would accept the compensation

subject to their grievance that their land should actually be treated as

perennially-irrigated.

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

10. Mr. Gorwardkar would submit that the MIDC has admitted in the

Reply Affidavit that the data based on which categorisation of the land became

possible, was admittedly available only on August 11, 2017. Therefore, the

Petitioners cannot be said to have known prior to 2017 what their final and

actual entitlement would be. . If the final compensation is not in consonance

with the Consent Awards by reason of mis-categorisation, he would submit,

the situation would clearly present a dispute that ought to be referred to the

Authority . He would add that the period of limitation for the Petitioners to

object can be computed only once the categorisation is actually finalised (after

2017 and not at the time of the Consent Awards).

11. In contrast, Mr. Prashant Chawan, Learned Senior Counsel

appearing on behalf of MIDC would submit that there cannot be an

adjudication of an objection to compensation agreed upon by mutual consent

as contained in the Consent Awards. Ms. P.M.J. Deshpande, Addl. G.P. and

Mr. B.V. Samant, Addl. G.P. on behalf of the other Respondents, would submit

that the Petitioners are hopelessly barred by limitation since Section 34 of the

Act provides for a limitation of 60 days from the date of the decision on the

compensation, with no provision for condonation of delay beyond such

period.

12. Any challenge under Section 34 has to be filed within 60 days

from the date of knowledge of the determination of the compensation. They

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

would submit that this facet of the matter is squarely covered by decision of a

Division Bench of this Court in State of Maharashtra and another vs. Keru

Baban Avhad1 (Keru Baban Avhad), which has declared the law that the 60-

day deadline to apply to the Collector seeking referral of the dispute to the

jurisdictional court, cannot be relaxed. Mr. Gorwardkar too would cite Keru

Baban Avhad to undermine the need for a party to have knowledge of the

ingredients of the award.

13. Having heard the Learned Counsel for the parties, who have

meticulously taken through the material on record to canvass their respective

positions, we are of the view that the Petitioners have not made out a case for

our intervention in exercise of our jurisdiction under Article 226 of the

Constitution of India, for a variety of reasons.

Sections 33 and 34 - no Reference in Consent Awards:

14. At the threshold, the following relevant extracts from the

provisions of the Act must be noticed:-

33. Compensation.-(1) Where any land is acquired by the State Government under this Chapter, the State Government shall pay for such acquisition compensation the amount of which shall be determined in accordance with the provisions of this section.

2008 SCC OnLine Bom 379

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

(2) Where the amount of compensation has been determined by agreement between the State Government and the person to be compensated, it shall be determined in accordance with such agreement.

(3) Where no such agreement can be reached, the State Government shall refer the case to the Collector for determination of the amount of compensation to be paid for such acquisition as also the person or persons to whom such compensation shall be paid:

Provided that, no compensation exceeding such amount as the State Government may by general order specify, to be paid for such acquisition shall be determined by the Collector without the previous approval of the State Government or such officer as the State Government may appoint in this behalf.

Provided further that, the State Government while issuing the general order under the preceding proviso shall adhere to the provisions of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (30 of 2013) relating to the determination of amount of compensation in accordance with the First Schedule, and rehabilitation and resettlement specified in the Second and Third Schedules, being beneficial to the affected families.

(3A) Notwithstanding anything contained in sub-section (3), if after the case is referred to the Collector under that sub-section but before he has finally determined the amount of compensation, such amount is determined by agreement between the State Government and the person to be compensated, the compensation shall be determined by the Collector in accordance with such agreement.

(4) Before finally determining the amount of compensation, the Collector shall give an opportunity to every person to be compensated to state his case as to the amount of compensation.

(5) In determining the amount of compensation, the Collector shall be guided by the provisions contained in sections 26 to 30 and other relevant provisions of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (30 of 2013), subject to the modifications that, the reference in section 26 to the date on which notification has been issued under section 11", shall be the reference as "the date of the service of publication of the notice under sub- section (2) of section 32 of this Act in the manner for the time being laid down under this Act", and the reference in section 28 to "the time of the publication of the declaration under section 19" shall be the reference as "the date of the

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

publication of the notice under sub-section (1) of section 32 of this Act in the Official Gazette.

(6) to 12) *****

Section 34. Appeal to Court.

(1) Any person aggrieved by the decision of the Collector determining the amount of compensation may, within sixty days from the date of such decision, in so far as it affects him, by written application to the Collector require that the matter be referred by him for determination of the Court as defined in the Land Acquisition Act, 1894 (I of 1894), in its application to the State of Maharashtra, and when any such application is made the provisions of Part IIT of the said Act shall mutatis mutandis apply to further proceedings in respect thereof.

(2) *****

[Emphasis Supplied]

15. It would be clear from the plain reading of the foregoing that the

determination of compensation is to be done in accordance with Section 33.

Under Section 33(2), where there is an acquisition by agreement, the

determination of compensation has to be done in accordance with the

agreement. It is only when no agreement can be reached, that the jurisdiction

of Section 33(3) is attracted - it provides for determination of the

compensation and identification of the entitlement to the compensation, by

the Collector. Section 33(3A) is noteworthy - if the State and the landowners

reach an agreement before the Collector can determine the compensation,

then the Collector's determination has to conform to the compensation under

the agreement.

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

16. Where the Collector determines the compensation, Section 33(4)

requires him to give those who are to be compensated, an opportunity to be

heard. Section 33(5) is attracted where the Collector is determining the

compensation, requiring him to determine such amount by applying the

principles stipulated in the 2013 Act.

17. Suffice it to say, Section 33(4) and Section 33(5) would only be

attracted where the Collector has to exercise jurisdiction under Section 33(3)

to determine the compensation. The jurisdiction of the Collector comes into

play under Section 33(3), only where no agreement can be reached between

the State Government and the landowner under Section 33(2). Therefore, the

2013 Act would have no role to play at all in the matter at hand, since it is

nobody's case that the State Government and the landowner have not reached

an agreement. Admittedly, the case at hand is one of agreement under

Section 33(2) of the Act having been reached, and the Consent Awards are a

product of such agreement. Therefore, in the matter at hand, the Collector has

no role whatsoever in determination of compensation under Section 33 of the

Act.

18. That would bring us to the scope of Section 34 of the Act. The

subject matter of grievance dealt with in Section 34 is the determination of

compensation by the Collector. Such determination of the compensation by

the Collector can only arise when the provisions of Section 33(3) are attracted.

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

For the jurisdiction of the Collector to determine compensation under Section

33(3) to arise, a precondition is that no agreement can be reached between the

State Government and the landowner. In the instant case, admittedly and

evidently, the very acquisition is under Section 33(2) under which an

agreement has been reached. There may arise differences of opinion among

contracting parties in an agreement, but the forum for resolution of such

disputes cannot be the special reference jurisdiction, which is a creation of

statute under Section 34 of the Act, with explicitly stipulated ingredients to

attract its jurisdiction.

19. For a person to apply to the Collector asking him to refer the

matter to the Authority exercising the reference jurisdiction under Section 34,

he ought to have a grievance about the decision of the Collector "determining

the amount of compensation". In the instant case, it is not the Collector who

has determined the compensation under Section 33(3), applying the

principles laid out in Section 33(5). As seen above, the very scheme of Section

33 gives primacy to consideration arrived at pursuant to an agreement.

20. It is only when the Collector is unilaterally determining the

compensation that he has to give an opportunity of being heard - it would be

trite to say that when the landowners have entered into an agreement of their

own will and accord, their involvement in reaching the mutually agreed

position is inherent. There is no question of a special provision being required

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

to enable a personal hearing - the very agreement is a product of personal

engagement between the parties. In these circumstances, we find merit in the

contention of Mr. Chawan and the Learned Additional Government Pleaders

that in the case at hand, there can be no resort to Section 34 of the Act, when

the compensation has been arrived at as a matter of agreement under Section

33(2) of the Act.

21. Agreements between the State Government and the landowner are

a matter of conscious mutual consent and finalization of a commercial bargain

between the parties who are ad idem on how they understand the bargain in

the agreement. The factors and criteria for determination of compensation in

terms of the 2013 Act governing unilateral determination of compensation

would not at all be relevant, and therefore, there can be no dispute about how

those factors have been applied, for a reference under Section 34 to be made.

22. It is a matter of common sense that a party consciously executing a

contract would apply its mind to it's owns self interest when agreeing to the

terms of the contract, which is what the Petitioners have done. Mr.

Gorwadkar too has rightly stated that the Petitioners' grouse is only really

whether within the framework of the agreement, the right categorisation has

been arrived at, which would lead to the application of the right price among

the three agreed price variants. As seen from the pleadings, the Petitioners

are being compensated at the rate of Rs. 52.50 lakhs per acre, which is the

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

amount agreed as being payable to landowners who have parted with

seasonally-irrigated land. That the Petitioners have a grievance about the

characterisation of their land as seasonally-irrigated land, would at best lead

to a dispute under the agreement, but it cannot lead to a grievance over the

determination of compensation by the Collector under Section 33, for an

application under Section 34 to be permissible.

23. Disputes under the agreement may be amenable to other means of

enforcement in law - for instance, potentially, a civil suit outside the statutory

reference framework of Section 34; or a writ petition on arbitrariness in

categorisation; or such other means as may be available in law. However, for

the reasons articulated above, the compensation not having been determined

by the Collector, no case is made out for directing that a reference be made

under Section 34.

24. While the aforesaid finding should be adequate to dispose of this

Petition for completeness, the arguments of the parties about limitation may

be noticed. In Keru Baban Avhad, a Division Bench of this Court ruled as

follows:-

24. The applications for reference filed by the claimants prima facie appear to be barred by time as they have been filed much beyond the period of 60 days from the date of decision of the Collector and even from the date of disbursement of compensation to them. Since it is not the case pleaded before us that the claimants were present at the time of declaration of the Award, the Court cannot draw any presumption

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

that the claimants were in knowledge of the award and/or its contents on 20th June, 1994 i.e. the date of declaration of award. We have already discussed above that in order to make the remedy fruitful and effective, it is necessary that the claimants should have knowledge of the essential ingredients of the Award. These essentials would be declaration of the award, the details of the land acquired, rate at which compensation is awarded and bare minimum reasons to support those finding. Reference can usefully be made to the judgments of the various Courts, including this Court in the case of Maharashtra Industrial Development Corporation, Nagpur v. Shaikh Khatinabi wd/o Abdul Gaffar Shaikh, 2008 (1) Mh. L.J. 813 as also the Supreme Court in the case of Mahadeo Bajirao Patil v. State of Maharashtra, 2006 (1) Mh. L.J. (SC) 28 : 2005 (7) SCC 440. It has been unambiguously held in those cases that mere declaration of award per se is not a notice to the claimants and the claimants should know or have proper knowledge of the essentials of the Award which will be required for making the remedy of appeal effective and purposeful.

25. In the present case, all these ingredients came to the knowledge of the claimants on 7th July, 1994 when they received compensation in terms of the Award already declared on 20th June, 1994. Once compensation so determined was actually paid to them and received by them, whether with or without prejudice, it would satisfy the basic requirements of knowledge about the declaration of award as it would fairly provide them the required information for taking recourse to their remedy under section 34(1) of the MID Act. The cases in which affidavits have been filed by the claimants to show that they had received payments beyond 7th July, 1994, and in any case 21st July, 1994, certain evidence is required to be led before their claims can be rejected as being barred by time by the Reference Court.

26. The other important aspect of the case is whether the provisions of section 5 of the Limitation Act or any other provisions could be invoked by the Collector or the Reference Court to condone the delay in filing petitions under section 18 of the Act and under section 34(1) of the MID Act. Both these provisions which prescribe for a specific period of limitation do not empower the Collector or the Court to condone the delay in filing a petition for reference. It is thus clear that wherever the petition filed under section 18 of the Act is barred by

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

time, the Collector or the Court has no jurisdiction to condone the delay. Similarly, if a petition is filed under section 34(1) of the MID Act, it must be filed within a period of sixty days from the date of the decision of the Collector and/or at best from a date which could be construed to be the date when the claimants had a fair knowledge about the essential features of the award. But once that date is known and/or determined, in that event, there is no power vested in the Collector or the Court to condone the delay in filing the appeal. In this regard, reference can be made to the judgment of the Supreme Court in the case of Officer on Special Duty (Land Acquisition) v. Shah Manilal Chandulal, 1996 (1) Mh. L.J. (SC) 609 : (1996) 9 SCC 414.

Reference in this regard can also be made to the judgment of the Supreme Court in the case of Mahadeo Bajirao Patil (supra).

28. The period of limitation cannot be extended by the Collector or the Courts and, therefore, reference should essentially be filed within the prescribed period of limitation under section 34(1) of the MID Act.

[Emphasis Supplied]

25. A batch of special leave petitions, inter alia challenging this

judgment came to be dismissed by the Supreme Court by an order dated

January 29, 2015.

26. The Petitioners have cited Keru Baban Avhad for the contents of

paragraph 24 extracted above to state that it is vital for them to have had

knowledge of the ingredients of the compensation - they have even invoked it

in their application to the Collector asking for a reference to be made. The

Consent Awards were made pursuant to the agreements executed in 2013. In

fact, Mr. Gorwadkar fairly states that the receipt of compensation took place

on November 18, 2015. The application to the Collector seeking a reference

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

under Section 34 has been made in February 2018. Since such application

was clearly made years after the receipt of compensation (as against the

limitation period of 60 days), Mr. Gorwadkar submits that it is now an

admitted position that the data for a proper categorisation of the land had

been made available only on August 11, 2017, as is seen from the Reply

Affidavit. Therefore, he would submit, limitation should be counted only from

the stage at which the Petitioners gained knowledge of the categorisation of

their lands, which can only be after August 11, 2017. According to him, the

Petitioners gained knowledge on December 25, 2017 that there had been a

categorisation on December 8, 2017. Therefore, their application on February

14, 2018 was within the limitation period of 60 days from the date of their

knowledge, as stipulated under Section 34 of the Act.

27. The Respondents have cited Keru Baban Avhad to state that the

Consent Awards put the Petitioners on notice of its contents and the 60-day

limitation period commenced then. Since knowledge of determination of the

ingredients of compensation is necessary to challenge it, the question of

limitation is a mixed question of fact and law.

28. Be that as it may, in our opinion, we need not enter upon this issue

at all, since we are firmly of the view that the matter at hand does not at all

lend itself to the jurisdiction of Section 34, for the detailed reasons set out

above. It is only if Section 34 is attracted that one would need to adjudicate

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

upon the computation of the 60-day period. In the facts of the case at hand,

such an exercise is wholly unnecessary.

29. The framework for computing the compensation had already been

agreed between the parties way back in 2013. The parties consciously put

themselves in a position of subjecting their compensation amount to the

categorisation of the land. They even agreed that depending on the

categorisation, they would be entitled to varying pre-agreed rates of

compensation. Even assuming for the sake of argument that the categorisation

was effected only in 2017, in our opinion, on the Petitioners' own showing,

they had not only executed the agreement accepting the compensation

framework, but also bargained for an enhancement in the compensation

depending on the categorisation of their lands. Section 33(2) as well as Section

33(3A) are explicit in their terms, inasmuch as compensation determined by

agreement would be sacrosanct and the Collector would have no role in

determining the compensation where an agreement is involved. Therefore,

since the compensation in question is not determined by the Collector but by

the parties to the agreement, the mixed question of fact and law involved in

determining limitation, is moot.

30. The Petitioners consciously subjected themselves to the procedure

envisaged in the agreements, and bound themselves to compensation as set

out in the agreements. The framework of rates was also accepted by them.

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

Having done that, in our opinion, the jurisdiction of Section 34, which is a

check and balance on unilateral determination of compensation by the

Collector, cannot be invoked. Even if the reference is made to the Authority,

the determination of compensation by that Authority would be by applying the

provisions of the 2013 Act, in order to test the veracity and accuracy of the

Collector's application of the 2013 Act, in determination of compensation .

The Authority would have to work in a vacuum since to begin with, there had

been no action on the part of the Collector to be adjudicated by the Authority,

and moreover, there has been no application of the principles of computing

compensation under the 2013 Act for such computation to be tested by the

Authority. Regardless it is also noted that the Petitioners' request to enhance

compensation had already been rejected multiple times before the Impugned

Order, which rejected the request for making a reference under Section 34.

31. As a result, we have no hesitation in rejecting the prayer for

directing that a reference be made under Section 34, to the Authority.

32. The Land Acquisition Officer, in the Reply Affidavit, has stated

that the categorisation of the lands had been effected on the basis of the crop

inspection entries for the period between 2002-03 to 2013-14. The grounds in

this Petition primarily relate to invoking the jurisdiction of Section 34 of the

Act. There is no material in the Petition to suggest that the interpretation of

the crop data in effecting the categorisation was arbitrary, or that the crop

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

data had been applied arbitrarily or that categorisation of land was without

application of mind to the crop data. Consequently, without any basis to

bring under cloud, the reasonableness of the categorisation on merits, there is

no scope for allowing the prayer for appointment of a Court Commissioner or

the Mamlatdar to undertake the categorization afresh. So also, since the

acquisition in question is pursuant to a framework contained in a mutually

agreed contract, there is no scope for direction computation of compensation

under the 2013 Act.

33. To summarize:-

a) We hold that it would not be possible to make a reference

of a dispute over categorisation of the Petitioners' lands to

the Authority under Section 34 of the Act, since the land

acquisition and the computation of compensation for the

acquisition is by way of agreements executed under

Section 33(2) of the Act;

b) There having been no pleading or any attack on the

reasonableness of the categorisation of the land in the

Petition, with nothing to suggest that the categorisation

was arbitrary, there is no question of issuing a writ to have

the categorisation be effected afresh, whether by a Court

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

Commissioner or the Mamlatdar, or by any other person;

c) No direction for computing compensation, applying the

provisions of the 2013 Act can be issued since the

compensation has been arrived at by agreement under

Section 33(2), which explicitly provides for compensation

being governed by the agreement between the State

Government and the landowner;

d) Section 33(3) and the consequential provisions requiring

the Collector to determine the compensation by applying

the principles under the 2013 Act, can only be applied

when no agreement can be reached over the acquisition

and compensation for it. Even where the Collector

commences such exercise, if such an agreement is reached

between the parties, the Collector's determination of

compensation would need to be in accordance with such

agreement; and

e) Consequently, no relief whatsoever as prayed for, can be

granted to the Petitioners in the facts and circumstances of

the case.

October 15, 2024 Ashwini Vallakati

J-926-ASWP-12039-2019+.doc

34. As a result, Rule is discharged, and the Writ Petition is disposed of

accordingly, without grant of any relief. In view of the disposal of the Writ

Petition, nothing would survive in any application in connection with this Writ

Petition, and the same too would stand disposed of.

[SOMASEKHAR SUNDARESAN, J.] [G. S. KULKARNI, J.]

October 15, 2024 Ashwini Vallakati

 
Download the LatestLaws.com Mobile App
 
 
Latestlaws Newsletter
 

Publish Your Article

 

Campus Ambassador

 

Media Partner

 

Campus Buzz

 

LatestLaws Guest Court Correspondent

LatestLaws Guest Court Correspondent Apply Now!
 

LatestLaws.com presents: Lexidem Offline Internship Program, 2026

 

LatestLaws.com presents 'Lexidem Online Internship, 2026', Apply Now!

 
 

LatestLaws Partner Event : Smt. Nirmala Devi Bam Memorial International Moot Court Competition

 
 
Latestlaws Newsletter