Citation : 2021 Latest Caselaw 6963 Bom
Judgement Date : 3 May, 2021
IN THE HIGH COURT OF JUDICATURE AT BOMBAY
ORDINARY ORIGINAL CIVIL JURISDICTION
INTERIM APPLICATION (LODGING) NO.3846 OF 2020
IN
SUIT (LODGING) NO.3844 OF 2020
Hubtown Solaris Premises Co-op. Society Ltd., ] ... Applicant-Plaintiff
V/s.
1. Municipal Corporation of Greater Mumbai ]
2. Asst. Engineer-II (B & F), Mumbai ]
3. Asst. Assessor & Collector, ]
Assessment and Collection Department, Mumbai ]
4. Asst. Engineer, Water Works Dept., Mumbai ]
5. Hubtown Ltd., Mumbai ]
6. Hubtown Solaris Maintenance Pvt. Ltd., Mumbai ]
7. Slum Rehabilitation Authority, Mumbai ]
8. Executive Engineer - W.S., SRA, Mumbai ]
9. City Elevators Pvt. Ltd., Mumbai ] ... Defendants
Mr. Mayur Khandeparkar, with Mr. Kaustubh Patil, i/by Yashvi Panchal, for
the Applicant-Plaintiff.
Mr. Sagar Patil for Defendant Nos.1 to 4.
Dr. Birendra Saraf, with Mr. Ashish Kamat, Ms. Niyati Merchant, i/by MDP &
Partners, for Defendant Nos.5 and 6.
Mr. Abhijeet Kulkarni for Defendant Nos.7 and 8.
Mr. Abhijeet Singh for Defendant No.9.
CORAM : A. K. MENON, J.
RESERVED ON : 10TH MARCH, 2021.
PRONOUNCED ON : 3RD MAY, 2021.
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
P.C. :
1. The plaintiff-society has moved this ad-interim application in a suit in
which the plaintiff seeks numerous reliefs and principally for a direction to
handover possession of society's office. Plaintiff is a co-operative housing
society of purchasers of commercial premises in a building known as
"Hubtown Solaris" situate at Andheri, Mumbai. The society seeks a direction
against defendant no.5 - the developer to handover possession of the society's
office in the building known as "Hubtown Solaris" along with all records and
accounts in relation to functioning of the building. The society also seeks
numerous reliefs to prevent obstruction by the defendant no.5 of the
plaintiff's employees, agents and servants, who are said to be managing the
affairs of the building including use of lifts and collection of maintenance
charges. The society also seeks a declaration that the Letter of Intent dated 5 th
July 2019 and further permissions said to have been granted to the plaintiff
by the defendant no.7-Slum Rehabilitation Authority for construction of the
13th and 14th floor in the building are illegal and not binding. The society
seeks cancellation of the Letter of Intent and in the interim seeks several ad-
interim reliefs including injunction restraining defendant no.5 from selling or
allotting any part of the 13th and 14th floors. The prayers range from prayer
clause (a) to prayer clause (dd).
2. The IA seeks certain urgent reliefs of injunctions as aforesaid. One of
the reliefs sought in the IA, namely, to restrain defendant nos.5, 6 and 9 from
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
preventing use of the lifts and robotic car parking and other facilities in the
building, is being worked out amicably pending the hearing of this IA. That
apart, today the plaintiff seeks further prayer clauses (b), (f) and (h) in the
following terms :-
(i) Injunction restraining security guards employed by
defendant no.5 / defendant no.6 from interfering with,
obstructing and harassing members of the plaintiff-
society and their employees, who are managing day-to-
day affairs of the building;
(ii) Injunction restraining defendant no.5 from carrying out
any construction on parts of the 6th, 13th and on the 14th
floors and;
(iii) Injunction restraining defendant no.5 from selling,
transferring or allotting floors 6th, 13th and 14th.
3. Affidavits have been filed and the matter is being urged for ad-interim
reliefs. A few facts which are relevant are set out below :-
. The defendant no.5 is beneficiary of a Letter of Intent dated 1 st
December 1998 for redevelopment of the plot of land under DCR 33(10). The
LOI was revised in 2004 to carry out a slum rehabilitation scheme. IOD and
commencement certificate were issued in 2005 and the layout was sanctioned
in 2009 for constructing 14 rehabilitation buildings and 3 sale buildings.
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
Between 2009 and 2012, these buildings have been constructed. In
September, 2012, defendant no.5 is believed to have received part occupation
certificate in respect of the building "Hubtown Solaris". Defendant no.5 has
entered into the agreements for sale with purchasers of units. These
agreements were said to be compliant with the Maharashtra Ownership Flats
(Regulation of the Prmotion of Construction, Sale, Management and Transfer)
Act, 1963 (MOFA). Later, after Real Estate (Regulation and Development) Act,
2016 (RERA) came into force, further sale agreements were also believed to
have been executed. Hubtown Solaris consists of 2 basements with 6 level +
ground + 13 upper floors. It was proposed that upto 18 th floors will be
constructed upon plans being approved.
4. The applicant-society today claims that the defendant no.5 has failed
and refused to hand over society's office, is interfering with the enjoyment of
the property and is engaged in illegal construction on the 6 th, 13th and 14th
floors. About 277 units constructed between 2011 and 2020 have been
handed over to the members of the plaintiff-society. The society was
registered on 18th June 2018. The first general meeting of the society was held
on 12th October 2019. The 5 th defendant attempted to stall the society's
attempt to hold the meeting. A writ petition was filed in this court being Writ
Petition No.11063 of 2019. Defendant no.5 sought to prevent the meeting
from being held, but no interim relief was granted. A provisional
management committee of the plaintiff-society was then elected. The society
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
has alleged financial indiscipline against defendant no.5. Funds collected
towards maintenance charges and statutory dues have not been paid over.
The 5th defendant is said to have failed to handover the society's office and the
security personnel engaged by the defendant no.5 are said to have been
harassing the members of the plaintiff-society by restricting usage of common
facilities.
5. Mr. Khandeparkar submitted that maintenance charges which were
collected from the members were to be used for payment of municipal taxes
and defraying other causes for general maintenance of the building. If these
have been paid from time to time in keeping with the provisions of the
agreements for sale, it is submitted that under clause (4.2) of the agreement,
such maintenance charges would be collected by defendant no.5 only till
formation of the common organization of unit purchasers. He has relied upon
the provisions of clauses (4.2), (4.3), (4.6), (4.7) and (4.9) in support of his
contention that the defendant no.5 was to handover the building for
management by the plaintiff-society and execute a lease in favour of the
society. The maintenance charges and taxes are now to be collected by the
society and not by the defendant no.5. Relying upon these provisions, he
submitted that the defendant no.5 is in breach of these obligations and the
agreement for sale, which MOFA obliges it to perform.
6. Mr. Khandeparkar submitted that defendant no.5 has been adopting
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
aggressive practices engaging goons and anti-social elements to move around
in the building premises and threatening and preventing the members from
convening meetings and threatening them of dire consequences if they did.
Averments in the plaint in paragraph 90 have been relied upon. One of the
other grievances is that defendant no.5 has refused to permit operation of the
lift and the robotic car parking. That of 17 lifts, only 2 were working when
the suit was filed, that too in a place where the footfall is of approximately
3,000 visitors a day, which had however fallen to about one and a half of that
during the pandemic driven lock-down. The lifts have been locked. The
passcodes for unlocking the lifts are not provided to the members of the
plaintiff-society. Defendant no.9, who was engaged to manage the lifts, has
contended that their dues are not being paid.
7. According to Mr. Khandeparkar, these dues had been paid over to the
defendant no.5, who apparently retained the same. Thus, there is a dispute
between the parties as to accounts and it is in this respect that as recorded in
an order dated 9th December 2020, the parties have agreed to engage an
external accountant. This process is presently underway and by way of an
interim arrangement, several lifts had been made operational. According to
the plaintiff-society, the final layout plan for "Hubtown Solaris" was approved
by Slum Rehabilitation Authority on 27 th November 2009. Between 2011 and
2020, 277 units had been handed over to its members. The society was
registered in June, 2018 and the first general meeting was convened in the
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
presence of the Assistant Registrar of Co-operative Societies. The meeting was
held on 12th October 2019 and although defendant no.5 sought to prevent the
meeting from being held by filing a writ petition, no interim relief was
granted. The managing committee was elected and was authorized to handle
day-to-day affairs of the building/society including maintenance. However,
defendant no.5 had failed to co-operate. Lifts were not in working condition.
Defendant no.5 did not pay monies collected from the plaintiff's members to
the contractor maintaining the lifts. Likewise, statutory dues were also not
paid by defendant no.5. In effect, the defendant no.5 was obstructing the
plaintiff's attempt to manage the society's affairs. One of the grievances made
by the plaintiff-society is that the building has robotic parking facility, which
has not been functional. As a result of the 5 th defendant's failure to remit
arrears to pay dues of defendant no.9 - the lift maintenance agency, which
also manages the parking facility and the lifts, the said operator has
discontinued the said service.
8. My attention was invited to clauses (4.2) and (4.6) of the Agreement for
Sale in support of the plaintiff's contention that the defendant no.5 was now
obliged to permit the society to collect outgoings and pay the same. It is only
till the formation of the society that the defendant no.5 was to undertake
maintenance activities and was entitled to charge 20% of the expenditure as
service fees. Clause (4.9) it is stated makes this explicit. The society having
been formed as of June, 2018, it had taken charge of the building from
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
October, 2019 pursuant to the order passed by the Assistant Registrar of Co-
operative Societies. A challenge to the society's formation has not met with
any success thus far and it is submitted that the society is now functioning, it
is entitled to collect maintenance from all units. The defendant no.5 however
is continuing to recover maintenance, service charges at 20% of the
maintenance cost. This is clearly impermissible and the defendant no.5 is now
seeking to take advantage of the fact that construction is still underway to
retain control over maintenance, which it now cannot. The levy of 20%
service charges is in any case not required to be borne by the existing
members for no fault of theirs. There is a legal obligation to convey the land to
the society, which also the defendant no.5 is in breach of.
9. In an attempt to suppress the plaintiff's efforts, the defendant no.5 has
allegedly employed some goons in the guise of security services leading to
constant altercations and threats being held out to the representatives of the
society. These persons are said to be engaged in intimidation and threatening
members. Reliance is placed on photographs at Exhibit-BB to the plaint in this
respect. The defendant no.5 has caused such disturbances deliberately in
order to intimidate the society and its members. Meetings are disrupted and
threats are handed out to the plaintiff's members. It is submitted that multiple
FIRs have been registered and defendant no.5 has sought to persist in this
attitude despite the society having engaged security services. Having been
directed by the SRA also to handover charge of the affairs of the society, it is
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
not open to the defendant no.5 now to obstruct the plaintiff's efforts in
managing the society and to that extent, an order and direction is sought
restraining the defendant no.5 from preventing the society in carrying out its
duties of maintenance and providing for security personnel. The defendant
no.5 should be asked to remove, cease and desist from engaging any persons
to manage the affairs of the building, which is now the obligation of the
society. The next contention canvassed on behalf of the plaintiff is that the
society is entitled to lease of the land upon which the building is constructed.
Under the MOFA provisions, particularly Section 11 read with Rule 9 of the
Rules, the defendant no.5 is bound to procure conveyance of the land in
favour of the society within four months of the formation of the society. The
society having been formed in June 2018 and having taken charge from
October 2019, the conveyance/lease ought to be executed. The defendant no.5
has deliberately avoided conveying the land in order to seek benefits of DCPR
2034 and in this behalf reliance is placed on the decisions of this court in
Ravindra Mutenja and Ors. Vs. Bhavan Corporation and Ors., 1; Noopur
Developers Vs. Himanshu V. Ganatra and Ors. 2, and; Lakeview Developers
and Ors. Vs. Eternia Co-op. Housing Society Ltd. and Ors. 3.
10. The aforesaid decisions are sought to be relied upon in support of the
contention that this defendant no.5 cannot now avoid conveying the property
1 2003 (5) Mh.L.J. 23 2 2010 (7) Mh.L.J. 694 3 2015 SCC OnLine Bom. 3824
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
and take advantage of rights which would otherwise vest in the society upon
the conveyance being effected. The plaintiff further contended that the
defendant no.5 cannot continue to make changes to the plans of the building
without express consent by the plaintiff-society and its members in view of
the provisions of Section 7 and 7A of MOFA, which prohibits such changes
being carried out after the initial plan is disclosed. Notwithstanding the
disclosure that the building may consist of upto 18 th floors, the development
potential has been exhausted and if it were not per DCPR 2034, it would not
have been possible for the developer to construct beyond the 13 th floor merely
because the agreement provided for a cap of 18 th floors. It does not entail an
absolute right in favour of the developer to so construct without the express
consent of the members of the society.
11. My attention is invited to the reports appearing at Exhibit-K to the
plaint, which show that an application has been made for a revised Letter of
Intent which was issued granting additional benefits under DCPR 2034 and
this has occasioned by virtue of the defendant no.5 having obtained
development right certificates from other properties, which it is developing.
Reliance is placed on a brochure which had been published by the defendant
no.5 in which a Food Court was contemplated as part of the amenity space
which could be used by all members and also a recreation area. All this now
has been changed since in the service area which was being used as a Food
Court and Canteen, defendant no.5 now seeks to convert the service area into
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
office units contrary to the original provisions. Consent of the members of the
plaintiff-society was not sought or obtained and hence it is contended that the
proposal to construct office units on the 6 th floor is violative of Section 7 of the
MOFA. No alternate service area is being provided. If such service area had to
be shifted to some other location, it could have been done only after obtaining
consent of the society or informing the society. None of this has occasioned
and the higher floors do not indicate provisions for service area.
12. In the course of submissions, it is contended that the Advocates for SRA
have submitted that a service area had been shifted to a higher floor but none
of this is reflected in the amended plans or the report to which reference is
made. A service area was necessary, it was an amenity, part of common area
and could not have been done away with in the manner now sought to be
done. The defendant no.5 it is alleged is exploiting the benefits of DCPR 2034
at the cost to the society, which alone could have exploited the same. Lastly it
is contended that there are large amounts outstanding towards water charges,
extra sewerage charges, charges for water misused and property taxes to the
tune of more than Rs.9.4 crores. All of this is said to be payable by defendant
no.5, which is now evident from the fact that the Municipal Corporation has
disclosed these outstanding in their affidavit. In these circumstances, it is
contended that the ad-interim relief as prayed for in prayer clauses (b), (f)
and (h) be granted.
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
13. The IA is vigorously opposed by Dr. Saraf and Mr. Kamat on behalf of
defendants 5 and 6. Defendant no.5 is the developer of the SRA Scheme and
defendant no.6 is a company formed by defendant no.5 for collecting
maintenance amounts from purchasers in Hubtown Solaris. The reliefs sought
are therefore against defendant nos.5 and 6. The opposition was spread out
over several hearings, during which brief submissions were sought to be
tendered; however, all of this was replaced by written submissions on behalf
of defendant nos.5 and 6, which the defendants filed on or about 25 th March
2021. These submissions are long winded, recapitulates what Dr. Saraf and
Mr. Kamat had submitted from time to time. The principal line of defence is
on maintainability of the suit rather than the merits of the claims made by the
plaintiff-society against defendant nos.5 and 6. It is therefore appropriate that
we deal with these aspects right away.
14. Considering the length of time taken up in canvassing the respective
cases, I have enquired of counsel whether this interim application could be
disposed finally since an important aspect of maintainability of the suit in this
court has been raised in the light of the fact that the RERA provisions contain
a bar on the civil court's jurisdiction. This is an aspect that would go to the
root of the matter; however, in view of the large number of interim reliefs
sought, the plaintiff-society was unwilling to submit to a final disposal on the
IA. It is therefore appropriate that one considers, prima facie, the effect of
Section 79 of RERA and the maintainability of the present suit, limited to the
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
purposes of this ad-interim application.
15. At the outset, it is submitted by counsel on behalf of the defendant
nos.5 and 6 that the contention that consent of the plaintiff-society had not
been obtained is incorrect. The agreements for sale specifically provide for
such further construction as may be decided by the developer. The defendants
have contended that this court has no jurisdiction in view of the express bar
contained in Section 79A of the Real Estate (Regulation and Development) Act,
2016. The plaintiff and defendants have also sought to contend that being a
Slum Rehabilitation Project, the Maharashtra Slum Areas (Improvement,
Clearance and Redevelopment) Act, 1971 also contains an express bar in
Section 42 of that Act. In view of these two provisions, namely, Section 79 of
RERA and Section 42 of the Slum Act, this court ought not to interfere. It is
also contended that the plaintiff-society has suppressed correct facts and is
seeking to mislead the court. Apart from the fact that the application is
delayed, emphasis is laid on the scheme and object and purpose of RERA. The
Division Bench of this court in Neelkamal Realtors Suburban Pvt. Ltd. and
Ors. Vs. Union of India and Ors.4 and in Lavasa Corporation Limited Vs.
Jitendra Jagdish Tulsiani and Ors.5 had clearly observed that RERA is intended
to advance public interest and that the Standing Committee and Select
Committee had examined all aspects and observed that RERA provides a
singular legislation, which would encompass all aspects of real estate
4 MANU/MH/3135/2017 5 MANU/MH/2362/2018
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
development. My attention was invited to the numerous paragraphs in
Neelkamal (Supra). Reference was also made to the frequently asked questions
on the RERA website which deals with the objectives of the Act, which include
a Fast Track Dispute Resolution Mechanism and an attempt to enforce
transparency and fair play, reduce frauds and delays. However, I do not find
much progress having been made in this respect in the RERA complaint,
which is sought to be canvassed as one of the defences inasmuch as the
plaintiff had already approached the authorities under RERA and a complaint
is pending. In view of that complaint, it is contended that the present suit
ought not to have been filed and therefore no relief should be granted.
16. My attention was also invited to the numerous paragraphs in Lavasa
Corporation (supra) in support of the contention that the real estate sector is
now sought to be regulated only by RERA, which is a self-contained code, and
considering the numerous provisions of that Act, it is clear that the present
suit is not maintainable. Section 31 has been invoked by the plaintiff and the
authority is fully empowered to deal with all aspects of the plaintiff's
grievances by virtue of Sections 7, 35, 36, 37 and 40. The RERA authorities
have necessary powers and therefore it is not necessary for the plaintiff-
society to approach this court, which is clearly not intended to consider these
aspects. The bar under Section 79 would entail that this suit should be
rejected. Alluding to the effect of Sections 88 and 89 of the RERA, Dr. Saraf
contended that construing these sections harmoniously with Section 79
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
would still entail rejection of the plaintiff's suit. It is contended that the
plaintiff's version that the authorities under the RERA can only consider
violations under RERA would be incorrect. The authority under RERA can also
adjudicate upon disputes relating to allegations of violations of MOFA; such
are the powers of the authority. It is admitted that repeal of MOFA is not
contemplated, but the reliefs that can be given by this court can also be
granted by the appropriate authority under RERA and it is for this reason that
the bar is an effective defence against any attempt by the plaintiff to approach
a civil court. It is contended that Sections 88 and 89B be read purposively,
that since RERA is a umbrella statute for all real estate development and allied
matters, it would be impractical for a civil court to interfere only because
MOFA is not repealed. Any interference by this court on the basis of the
plaintiff's contentions would be defeating the purpose for which RERA was
enacted. The benefits of the legislation have been highlighted by learned
counsel on behalf of the defendants that for on-going projects as well,
aggrieved allottees could approach the authorities under Section 18 of RERA
and that the authority has been invested with such wide ranging powers,
which clearly would not justify interference by this court. While enacting
RERA, the legislature would have clearly been aware of local regulations and
hence consciously incorporated a bar under Section 79. The jurisdiction of
this court is therefore expressly excluded. Moreover, it is not desirable that
two parallel proceedings be permitted. All aspects in the present suit are said
to be encompassed in the complaint filed with the RERA authorities, which
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
has the power to grant injunctive reliefs and impose damages, if so required.
Continuing with these two litigations, which will only lead to multiplicity of
proceedings, the legislature could clearly not have intended simultaneous
proceedings before two different forums. My attention was invited by counsel
to the decision of the Supreme Court in Imperia Structures Ltd. Vs. Anil Patni
and Anr.6 The Supreme Court had observed that the authorities under RERA
alone should decide all issues concerning the projects registered under RERA
and that Section 79 of the RERA would apply to proceedings initiated under
the Consumer Protection Act, 1986. The issues concerning a project registered
with RERA are specifically entrusted to the functionaries under the RERA. All
breaches under RERA can be adjudicated upon by the appropriate authority
under RERA. For these reasons, it is contended that no ad-interim relief be
granted.
17. The next objection canvassed on behalf of the defendants is under the
Slum Act. The defendants contended that under Section 42 of the Slum Act,
the civil court has no jurisdiction in respect of matters over which the
administrative / competent authority or tribunal is empowered to adjudicate
upon under the Slum Act. No injunction be granted by any court or other
authority in relation to actions taken under the said Act and in this behalf, the
plaintiff's attempt to seek relief against the slum project must fail. The
plaintiff-society has admitted that Hubtown Solaris is part of an on-going
slum project and construction is proceeding in accordance with plans 6 Judgment dt. 2nd November 2020 passed in Civil Appeal No.3581-3590 of 2020
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
approved by the SRA. Not only the plans for the additional floors but also the
lay-out plan has been approved by the SRA. Construction is thus going ahead
in accordance with the sanctioned plans. Being the Planning Authority, the
SRA has permitted use of FSI. The provisions of the Slum Act have a larger
purpose to be achieved and there cannot be an interference by civil courts
since the slum project would involve rehabilitation of slum-dwellers, which
ought not to be interfered with by civil court. The free-sale component is not
released till the rehabilitation component is completed. There is a delicate
balance that is sought to be achieved in a slum project and civil courts ought
not to disturb this balance. The scheme of the Slum Act would require the
civil court not to interfere.
18. Reliance is placed by the defendants on the decision of Naresh
Lachmandas Haswani Vs. Haridas and Ors .7 and it is submitted that the
defendant no.5 is not engaged in any illegal activity. Construction on the 13 th
floor is underway, is yet to be completed and construction on the 14 th floor is
expected to commence; however, these constructions are in accordance with
the scheme approved by the SRA. The construction would proceed only upon
FSI being released in the free sale development subject to phase-wise
completion of the rehabilitation component and the plaintiff and its members
are well aware of this aspect. The construction of the building has proceeded
in accordance with the schedule and over a period of several years
commencing from 2009. Reliance is placed on various dates on which 7 2016 (4) ALL M.R. 286
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
commencement certificates were issued and occupation certificates were
issued in respect of the ground floor structures right upto the 13 th floor. The
last occupation certificate is said to have been issued on 31 st December 2019,
however part occupation certificate in respect of some units on the 6 th floor
has been issued on 30th September 2020. Thus, the occupation certificates
have been issued on several dates between 12 th September, 2012 to 30th
September 2020. Reference is made to recitals 9, 10, 20, 21 of the standard
sale agreements entered into by the defendant no.5 with the purchasers as
also clause 11(g), (i), (j), clauses 12.2, 12.6, 12.14 and 17 of the said
agreements, all of which empower the defendant no.5 to put up additional
constructions right upto 18th floor. The fact that the plaintiff's members have
all agreed with these provisions which would entitle the defendant no.5 to
carry out construction cannot be denied in view of these provisions which are
incorporated in the registered agreements.
19. By virtue of the aforesaid, it is contended that the plaintiff's contention
that absent "informed consent", the units now proposed to be sold on 6 th, 13th
and 14th floor cannot be so sold is incorrect. The consent provided for in the
aforesaid clauses is not merely formal or general consent but constitutes
"informed consent". On this basis, it is contended that the plaintiff-society
cannot succeed in getting any relief. According to Dr. Saraf and Mr. Kamat,
the plaintiff-society has not been able to demonstrate that the said agreements
in any manner contravene provisions of MOFA or that construction being
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
carried on is illegal. The conversion of the 6 th floor is said to be with the
complete approval of SRA, who has approved the plan. The FSI consumption
was within the rights of the defendant no.5 since the building could be
constructed upto 18th floors and the consent provided for in the above cited
clauses would constitute "informed consent". This is an aspect that cannot be
denied. According to the learned counsel for the defendants, the plaintiff had
failed to establish that the work of construction on the 6 th floor and part of the
13th floor is in violation of MOFA or that the rights of the plaintiff's members
have been in any manner compromised. All construction has been carried on
in accordance with the agreements for sale and that the work carried out is
within the powers of the defendant no.5 and not in contravention of the law.
The decision in Lakeview Developers (supra) has been referred to and it is
submitted that there is a full and proper disclosure, as contemplated in
Section 3 and 4 of the MOFA. Lakeview Developers also contemplated a
decision wherein the plaintiffs had contended that certain buildings were
constructed after potential of the development and floor space index disclosed
by the developer had been exhausted.
20. In the present case, the developer has disclosed the potential of
exploitation and the extent of FSI to be utilized. This constituted "informed
consent" and in any event it is contended that the facts in Lakeview
Developers are distinguishable. The FSI potential has been disclosed and it is
yet to be exhausted and therefore the decision in Lakeview Developers would
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
not help the plaintiff. In that respect, it is contended that the decision of this
court in Ravindra Mutenja (supra) also would not be of assistance since it is
not a case where the defendant no.5 was seeking to put up constructions after
completion of buildings in accordance with approved plans disclosed at the
initial stage. The defendant no.5 had disclosed its intention of putting up a
maximum of 18 floors and this was sufficient disclosure to constitute
"informed consent". This meets the test in Noopur Developers (supra) as well
and the defendant no.5 is stated to be fully compliant with these provisions. It
is also contended that the service area has been utilized after approvals were
obtained from SRA. The decision of the SRA could not be challenged in these
proceedings and the construction cannot be said to be beyond the scope of
what has already been disclosed. In that respect, it is contended that reliance
upon the decision of Nahalchand Laloochand Pvt. Ltd. Vs. Panchali Co-
operative Housing Society Ltd.8 is of no avail. The 6 th floor cannot be stated to
be amenity space as the service area would not be part of the amenity space,
as contemplated in law. According to the defendants, the plaintiff-society has
failed to demonstrate that this was service area which the defendant no.5 was
obliged to handover to the plaintiff society.
21. Dr. Saraf then assailed the delay and laches and suppression of facts by
the plaintiff-society. It is contended that the work of construction on the 13 th
floor had commenced in December 2019. Defendant no.6 managing the
property had informed unit holders about closure of one of the gates of the 8 (2010) 9 SCC 536
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
building to facilitate construction of the 13 th and 14th floor. The plaintiff
however has sought to oppose such construction only in 2020 by filing the
present suit. On account of such delay, it is contended that no relief be
granted.
22. Apropos the contentions regarding DCPR 2034, the bar under Section
42 of the Slum Act is invoked. It is submitted that Hubtown Solaris is part and
parcel of an on-going slum rehabilitation scheme, where FSI is released in a
phased manner. If benefits had arisen under DCPR 2034, the defendant no.6
was entitled to take advantage of it. The SRA had filed an affidavit in response
to the plaint and had clearly supported the 5 th defendant's contentions and
denied the plaintiff's contentions that there is no contest on this aspect. The
FSI available under the earlier DCR 1991 has not yet been exhausted and it is
contended that no increase in FSI is being sought under DCPR 2034. By virtue
of DCPR 2034, slum-dwellers are entitled to a slightly larger area as
compared to DCR 1991 and this required the defendant no.5 to seek
appropriate changes and obtain approval of such modified Letter of Intent. In
respect of areas and tenements already constructed, no change was sought.
Meeting the plaintiff's allegations of failure to handover the society's office
and records, it is contended that the sale agreements all provide that the
members of the society would have to await completion of development of the
project and till possession of all units are delivered to all purchasers, the
defendant no.5 would be entitled to manage the building till then. The
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
defendant no.6 was appointed for that purpose and that the defendants were
fully within their powers to manage the building and it was not necessary or
required that the management of the building be handed over to the plaintiff-
society. Such handover would be premature, according to the defendants,
since the building is yet to be completed and sanction had been received for
putting up additional floors.
23. It is therefore contended by Dr. Saraf that the 6 th defendant is
managing the affairs of the building and the defendant nos.5 and 6 are not
obliged to handover the records or management of the building to the
plaintiff-society. Reference is made to the order passed by this court on 9 th
December, 2020, by which all accounts will be submitted so as to dispel all
doubts about management of funds. The learned counsel for the defendants
has extensively taken me through the provisions of RERA, as aforesaid, and the
section cited above in an attempt to justify the continued construction and
resistance to handing over of management of the society. The learned counsel
for the defendants have sought to relied upon a comparative chart of prayers
in the plaint and the prayers in the RERA complaint to submit that all reliefs
sought in the plaint have already been sought in the RERA complaint, which is
prior in point of time and therefore this court need not interfere and in any
event the reliefs of the declarations and cancellations of the amended plans
cannot be sought in view of the express bar under Section 42 of the Slum Act.
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
24. Mr. Kamat has also relied upon various prayers in juxtaposition with
alleged breaches of RERA provisions and remedies as provided for under
Sections 7, 31, 35, 36, 37, 38 and 40(2) of RERA. The allegations in the plaint
regarding harassment of members, misuse of funds collected, demand for
handover of affairs of the society, continuing construction on the 6 th, 13th and
14th floors, have all been subjected to challenge in the RERA proceedings as
well. It is therefore contended that no ad-interim or interim reliefs as prayed
for be granted, in particular, a declaration sought that the defendant nos.5
and 6 have no right to issue bills. Injunction against construction of the 6 th,
13th and 14th floors are also being sought from RERA authorities, directly or
indirectly, by seeking adherence to sanctioned plans and project
specifications. In conclusion, it is submitted that considering the wide powers
of authorities owing to the RERA, the bar of section 79 under RERA and
Section 42 of the Slum Act, no interference is called for especially since the
grievances of operation of lifts and parking are now being addressed.
25. Having heard the rival contentions, the plaintiff's grievances are four
fold. Firstly, that of illegal construction, illegal conversion of the 6 th floor into
commercial units and additional construction being put up under 13 th and
14th floor. Secondly, the plaintiff is aggrieved by non-payment of property
taxes despite collection of taxes along with maintenance charges. Thirdly, it is
contended that the conveyance has not been executed in respect of the land
and, fourthly, the society's office has not been handed over. These are
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
essentially the issues that have been highlighted by the plaintiff-society
during submissions before me. At the cost of repetition, since we are at the
ad-interim stage, it has not been possible for both sides to explore all disputes
in detail, however based on the submissions made thus far and the written
submissions, it is evident that the issues which I have referred above are
presently engaging the attention of parties. The SRA has also filed an affidavit
in which it has conveyed its position as far as the additional construction is
concerned and the use of the 6 th floor. SRA has also made its observation
regarding the society's office. Accordingly, I have considered all these aspects.
26. The principal defence on behalf of the developer and its allied service
provider company is that of jurisdiction. It has been argued both by Dr. Saraf
and later by Mr. Kamat that in view of the provisions of RERA, the present suit
ought not to be entertained and if the suit cannot be entertained, nor can the
interim application; therefore, no ad-interim relief should be granted. As a
corollary, they have also contended that even under the Slum Act, there is a
bar under Section 42. Thus, if the jurisdiction issue is held in their favour, no
relief can be granted. I will therefore deal with this aspect.
27. I am of the prima facie view that the jurisdiction of this court is not
ousted by virtue of the provisions of RERA or that of the Slum Act. The suit
essentially seeks to enforce the obligations of the developers under the MOFA
and there can be no quarrel with the fact that every developer is required to
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
comply with the provisions of that Act. Equally, the developer is liable to
comply with the provisions of the RERA Statute.
28. Strenuous efforts have been made by counsel on behalf of the
defendants to establish commonality of reliefs sought in the present suit and
the IA on one hand and the complaint under the RERA on the other. The
question is whether because a RERA complaint had been filed, this court is
powerless to grant any relief in the facts of the case? There is yet another
perspective that needs to be looked into but apart from the bar under Section
79 of RERA, Section 42 of the Slum Act also contemplates a bar on civil courts
adjudicating upon amendment of plans etc. and in effect what the defendants
have submitted is that the declarations sought in terms of the prayers in the
suit cannot be granted by this court. Perusal of the comparative chart reveals
that in respect of prayer clauses (a) to (bb) in the suit, the defendants are of
the view that all reliefs can also be granted under the provisions of RERA. In
particular, reference is made to Sections 7, 31, 35, 36, 37, 38 and 40(2) of
RERA in support of the submission that the reliefs sought in the plaint and in
the IA can all be sought before the RERA authorities and that many of these
reliefs have in effect been incorporated as part of the reliefs in the RERA
complaint. If on one hand the plaintiff has contended that the suit seeks to
enforce the MOFA obligations of the developer, the developer has contended
that the bar under Section 79 of the RERA and Section 42 of the Slum Act
would effectively not entitle the plaintiff from seeking the present relief. Yet
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
again, the plaintiff has contended that the relief sought is not merely to the
extent that it is capable of being considered by the RERA authorities or by the
Slum authorities. What we are facing here is a plaint seeking a mixed bag of
reliefs. On one hand the aspect pertaining to maintenance of the property,
payment of taxes, the allegations of intimidation, failure to handover society's
office and failure to execute conveyance, all cannot be independently handled
under the RERA provisions. The mixed bag of reliefs therefore in my view is
not beyond the jurisdiction of this court although there are several prayers
that may fall within one or the other jurisdiction. MOFA in my view is the
most fundamental of Acts amongst the three that we are concerned with.
Without the MOFA, the provisions of RERA and of the Slum Act will make
little practical impact in terms of rights of purchasers of units and flats in
premises situated within the jurisdiction of this court. The MOFA being a local
law, it will have to be given effect to and if in the course of giving effect to
MOFA provisions, it becomes necessary to permit a plaintiff to invoke
jurisdiction of this court, so be it. Assuming that the plaintiff had not filed the
present suit and had proceeded only with the RERA complaint in deference to
the wishes of the defendants 5 and 6, the question is whether the RERA
authorities could have granted any relief de hors the provisions of MOFA and
the answer to my mind must be in the negative. Likewise, in the absence of
MOFA provisions, would the Slum Act and the authorities thereunder be
entitled to effectively deal with claims of flat purchasers on issues that are
already covered under MOFA? Once again, the answer must be in the
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
negative. Thus, MOFA is the dominant enactment in the present case. RERA
and the Slum Act are of a different species. RERA in effect seeks to regulate the
real estate industry as a whole and the Slum Act deals with development of
slum areas pursuant to the declarations. The three Acts have different scope
and reach; whereas, the RERA enactment will have effect throughout the
country, the Slum Act and the MOFA are restricted in their scope to the State.
None of the decisions that have been referred to and canvassed before me
have ruled that once a RERA complaint is filed, no other court or tribunal can
entertain any other grievance in relation to the subject matter of the
complaint. It is for this reason that the challenge to the provisions of RERA
was based on its constitutional validity. Both in Neelkamal Realtors (supra)
and in Lavasa Corporation (supra), the challenge was substantially to the
validity of the Act. While the RERA enactment seeks to bring about uniformity
throughout the country, the fact remains that the local laws which already
provide for certain regulation of the real estate business, still continue to be
valid and in this respect, Section 88 of the RERA makes it clear that the RERA
provisions are in addition to and not in substitution of the present enactments.
While there is no disputing the fact that RERA has been held to be a self-
contained code especially considering the requirement of compulsory
registration, extension of registration, powers of revocation of registration
highlighting the functions and duties of developers and the aspects of
conveyance and transfer of title, the Act also provides for certain rights and
duties of allottees; however, it falls short of encompassing all the aspects of
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
MOFA. Had every provision of MOFA been part of the RERA enactment, then
it would have been possible to hold that the plaintiff could not have invoked
the jurisdiction of this court. However, as on date and at this prima facie
stage, it is not possible to find against the plaintiff. It cannot be disputed that
the provisions of law have to be interpreted in a purposive manner. If the
defendants' version is to be accepted, Section 88 of RERA would be rendered
otiose and meaningless. I am unable to agree with the counsel for the
defendants that in interpreting Section 88 with the help of Section 89, the
views canvassed by the plaintiff would be rendered nugatory.
29. On the other hand, the RERA provisions being an addition to existing
laws, it is a matter of course that existing laws cannot be ignored and if the
existing law enables this court to exercise jurisdiction, there is no bar against
this court entertaining the suit. That having been said, in the event of any
overlap in jurisdictions, it is always open for this court to exercise jurisdiction
to the extent required and to the extent relief is unavailable before the RERA
authorities. In my view, whether or not to exercise jurisdiction in favour of
the plaintiff in a suit and in the face of the validity of RERA having been
upheld, a lot would depend on the facts of each case. In certain cases where
reliefs are exclusively available to a plaintiff / complainant under RERA, it
may be appropriate that the plaintiff is expected to pursue the complaint
before the RERA authorities rather than encourage filing of suits. However, in
the present case, I am of the view that merely filing of the RERA complaint
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
will not prevent the plaintiff from exercising its option in moving this court
and seeking protection.
30. The essence of the decision in Neelkamal Realtors (supra) is that of the
constitutionality of RERA as an enactment. The fact that save and except for
the constitution of the tribunal, all other provisions of RERA have been upheld
does not indicate that the provisions of MOFA need not be given effect to and
if provisions of MOFA can be invoked and sought to be enforced by a suit in
this court, mere filing of a complaint before the RERA authorities will not
frustrate plaintiff's effort in securing reliefs in this court. When we consider
the Statement of Objects and Reasons of RERA, it discloses that the real estate
sector was found to be playing a catalytic role in fulfilling the demand for
housing and infrastructure and that while the sector had grown significantly,
it has been largely unregulated in the absence of professionalism,
standardization and lack of adequate consumer protection and though the
Consumer Protection Act was available as a forum, it was not sufficient to
address all concerns of buyers of property and promoters alike. This aspect
would not hold true where the Maharashtra Ownership Flats Act did have an
element of regulation and control for a long time. To state that real estate
development in the State of Maharashtra was largely unregulated would not
be correct. That having been said, it is not every complaint that can be filed in
this court. RERA provides an adjudicatory mechanism for speedy dispute
disposal and it also has an appellate tribunal to hear appeals from the orders
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
of the authority. But, does that alone prevent this court from entertaining a
suit in which parties seek to enforce MOFA obligations? The answer must be a
firm no. Although MOFA has been around for a long time, it did not address
all the concerns of prospective purchasers. For instance, and as observed in
Neelkamal Realtors (supra), prior to RERA coming into force, MOFA
provisions were applicable, but completion of construction of a building was
not envisaged under MOFA. This was found to be a serious lacuna in the law,
which gave rise to a number of suits. This does not mean that by enactment of
RERA, this court loses its jurisdiction to entertain a suit including one where
specific performance is sought. It is believed that RERA will assure completion
of a project within time, however, as we can see in the instant case, that is
nowhere near true. Developers will continue to develop and purchasers will
continue to purchase. That leaves regulation of the industry to be monitored.
Projects such as the one at hand where the SRA plays a crucial role has to be
completed in phases. The question is whether even the real estate regulatory
authority can in such a situation pass orders and grant reliefs, which would
encompass the roles played by the promoter, the purchaser, a co-operative
society and the Slum Rehabilitation Authority? This is a grey area and will
need to be explored further before a conclusion can be reached. However, on
the basis of what has been canvassed before me and since the IA is only at an
ad-interim stage and that a detailed hearing is now in the contemplation of
parties, especially considering the wide ranging reliefs sought, I am of the
view that prima facie the institution of a complaint under RERA will not by
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
itself bar this court from entertaining a suit. Whether in a given case the court
should exercise a jurisdiction or not would depend on the facts.
31. Speaking of the dispute at hand, I am of the view that enactment of
RERA, the bar of Section 79 and the Slum Act and Section 42 thereof will not
non-suit the plaintiff. Having thus held and by clarifying that this is the view
that I hold at this ad-interim stage, I will now proceed to consider the reliefs
claimed on merits. It is pertinent to note that agreements for sale entered into
between developers and purchasers would include the standard form MOFA
agreements and the obligations of parties under MOFA. RERA to some extent
amplifies and works into more detail as far as the obligations and rights of
promoters and allottees too, but the provisions of MOFA are not entirely
subsumed in RERA. Mr. Kamat has laid emphasis on the decision of the
Supreme Court in Dhulabhai Vs. State of Madhya Pradesh and Anr. 9, in which
the Supreme Court was considering the effect of Section 17, barring
proceedings in any court, which was subject matter of assessments and orders
passed under the Madhya Bharat Sales Tax Act, when such orders were
passed by assessing authorities, appellate authorities or the Commissioner.
The Supreme Court observed that one of the tests to discover the force of a bar
under law would entail testing whether the Act contains machinery by which
an assessee could raise questions of vires of a provision before special
authorities and no such machinery existed and yet if civil courts were barred,
the vires of the section would come into question. According to Mr. Kamat, 9 (1968) 3 SCR 662
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
this test was clearly met in RERA since RERA had a complete mechanism for
entertaining and deciding complaints. Thus, the bar of a civil court was
justified. While this may be correct when considering the provisions of RERA
and the rights and obligations of promoters and purchasers, one must
consider the effect of MOFA in such a situation and once MOFA is brought to
the forefront, it cannot be successfully contended that there is an absolute bar
against invocation of jurisdiction of a civil court. This is one other reason why
the present suit cannot be considered as not maintainable.
32. I am also unable to find how the decision in Lavasa Corporation
(supra) can come to the assistance of Mr. Kamat to enable me to hold that this
court has no jurisdiction to entertain the suit. Reference in Lavasa
Corporation to the decision of the Supreme Court in Tata Engineering &
Locomotive Co. Ltd. Vs. State of Bihar and Anr. 10 cannot be lost on us. As
observed in that judgment, statutes cannot be construed as the theorems of
Euclid but with some imagination of the purposes which lie behind them. This
is so true even in respect of the applicability of MOFA despite the provisions
of Section 79 of RERA. Paragraph 63 in Lavasa Corporation emphasizes the
fact that two literal meanings need not be given to understand the scheme
underlying provisions of the Act. The intention of the legislature has to be
gathered not only from the terms used but also from the objects and reasons
and the preamble. In this respect it was reiterated that RERA intends to
provide benefits for both developers and purchasers alike and that the object
10 (2000) 5 SCC 346
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
was to establish and adjudicate the mechanism to provide speedy dispute
resolution. Lavasa Corporation does not hold that a civil court does not have a
jurisdiction to entertain claims under MOFA and indeed in view of Section 88
of RERA, it cannot be so construed. If read harmoniously, it will entail that
provisions of MOFA can be enforced not only through RERA, partly they could
be enforced through civil court as well. Thus, in my view, reliance on Lavasa
Corporation will not assist the plaintiff-society in ousting the jurisdiction of
this court. Lavasa Corporation primarily holds that Section 18 of RERA would
entitle allottees of premises also to maintain a complaint before the
adjudicating officer. The reliance placed by Mr. Kamat on the comparative
table of the prayers in the suit vis-a-vis breaches under RERA provisions and
remedies under RERA will not help the defendants in avoiding a trial in the
present suit. The fact remains that MOFA has not been repealed. MOFA
continues to be as effective as it was. RERA may have different aspects of
empowerment both for developers and purchasers alike, however as long as
MOFA continues to be good law, which it is, this court cannot be deprived of
jurisdiction merely on the basis of Section 79 of the RERA. If one were to
construe Section 79 so strictly so as to exclude the civil court completely
under all circumstances, it would be in my view almost like missing the wood
for the trees. Merely because under RERA the adjudicating authority has wide
powers, as seen from Sections 3 to 7, 11, 14, 17 to 19, 31, 34, 35, 36, 37, 38
and 40, it does not mean that a civil court cannot interfere to enforce specific
provisions of the MOFA. The various observations in Neelkamal Realtors
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
(supra) do not help the defendants to succeed in establishing that there is an
absolute bar against the civil court entertaining a suit which seeks
determination of issues, which could also be decided by the RERA authority. In
a mixed bag of reliefs such as the present one, which spreads across the
different enactments and focuses primarily on MOFA obligations, it is open
for the plaintiff to approach a civil court unless the defendant shows that the
reliefs sought exclusively fell within the scope of RERA as the adjudicating
authority.
33. Now coming to the aspect of "informed consent", which the plaintiff-
society alleged they have not provided, it is apposite that we consider
provisions in the agreements for sale and the stand taken by the SRA. The
defendants have canvassed before me the multiple instances where the
agreements for sale have clearly provided that the building is to comprise of 2
basements of 6 levels, a ground and 13 upper floors, to be extended upto 18
floors, if permitted and if FSI is available. There are two aspects to this dispute;
firstly, whether there is an absolute bar on proceeding above the 13 th floor
without the express consent of the purchasers or the society and, secondly,
whether assuming there is no express bar, the developer could continue to
exploit FSI and put up additional construction on the basis of the benefits
under DCPR 2034. On both these aspects, I am of the prima facie view that
the plaintiff-society cannot succeed. The agreement for sale, right from its
recitals and the operative clauses, being 11(g), 11(i), 11(j), 12.2, 12.6, 12.14
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
and 17, would in my view empower the developer to put up additional
construction to the extent provided for in the agreement. It is not a general
consent sought. Specific reference is made to 18 upper floors. If one was to
consider a clause which did not specify an upper limit, the plaintiff-society
may be right in contending that there was no informed consent, but in the
present case, I am clearly of the view that having specified in the aforesaid
clauses and also in the recitals and for that matter, in a total of 13 occasions
that the building would consists of upto 18 floors and that plans may have to
be changed for that purpose and in particular clause (12.6) which provides
that the approval for the layout shown to the unit purchaser at the time of
signing the agreement is subject to change, variation and/or modification, I
am of the view that the plaintiff-society cannot prevent construction form
being put up beyond 13 floors, provided, of-course, that the Planning
Authority and the SRA in particular provide sanction to the plans and that the
construction is in accordance with the law.
34. On behalf of the SRA, an affidavit of Uttam D.K. has been filed in which
the deponent has stated that the proposal for Hubtown Solaris was first noted
on 2nd April 2005. Letter of Intent was issued by the SRA for the scheme on 1 st
December 1998 and there are total of 14 buildings for rehabilitation
comprising of 2,068 tenements. The developer was to get permission to
construct in a phase-wise manner. The Planning Authority would issue an
occupation certificate and completion certificate only on completing the work
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
of construction of rehabilitation tenements as per Letter of Intent and the sale
building as per sanctioned plan.
35. In the present case, some rehabilitation buildings consist of tenements
of 225 sq.ft. Others are larger area of 269 sq.ft. and also of 300 sq.ft.,
pursuant to amendment in this behalf sanctioned by the government.
Considering the total area constructed, developer was entitled to 10,48,391
sq.ft. of FSI and on the basis of the record of SRA, there is no violation in FSI.
The two sites have been combined; one at Sai Wadi, Andheri, Hari Nagar and
Shivaji Nagar, Jogeshwari. Subject to heights and margin restrictions as per
Development Control Regulations, 1991 (DCR), the developer would be able
to construct sell buildings on either of the plots. According to SRA, there is no
violation of DCR in respect of side margin and height and it is within the
limits permitted.
36. As regards the service area, these are governed by DCPR 35(2)(vii) of
DCR, 1991, The Architect of the project had proposed a service floor along
with the refugee area with the height of 3.6 meters. No activity except
providing services were carried out there. Pursuant to amended plans
submitted by the Architect on 20 th January 2019, offices were proposed to be
constructed on the 6th floor in the service area. The deponent states that since
that service area was not mandatory and since the refugee area was on the
same floor and left unaffected, SRA has granted amendment to the plan
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
submitted on 20th January 2019. Thus, service area from the 6 th floor is being
shifted to other locations. The amended plan shows such service areas at
different locations. Reliance is placed on Exhibit R-1, which is the copy of the
amended plan sanctioned on 26 th July 2019. DCR 1991 were in operation
upto November, 2018 and the proposal for sanction of the building
permission thereafter was governed by the Development Control Permission
Regulation 2034 (DCPR 2034).
37. In view thereof, the developer was required to submit proposal as per
DCPR 2034 without changing the external design of the building. That
construction cannot now be permitted under DCR 1991 and the proposal of
the developer under DCPR 2034 has since been allowed by the SRA on 5 th July
2019 in accordance with the Regulation 9(6)(B) of DCPR 2034 and this is
how the service area has been partly used for constructing offices on the 6 th
floor. There is no mandate which requires a service area under DCPR 2034
and in any event, the service area proposed need not exceed 1.8 meters in
height. FSI available under DCR 1991 was 3 FSI and it continues to be the
same. The dispute appears only on account of payment of taxes and statutory
dues and SRA is not concerned with the same. The allegations of collusion
have been denied in the affidavit. Furthermore, execution of the conveyance
cannot be expected since the lease agreement between SRA, developer and
society will have to be executed for a period of 30 years after the slum project
is completed and handed over and after grant of full occupation certificate by
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
the SRA. Thus, the SRA has stated that there are no illegalities or irregularities
whatsoever in granting approvals. Reference to Exhibit R-1 indicates that on
26th July 2019, SRA addressed a letter to the Architect conveying their no
objection to carry out work in accordance with the amended plans, subject to
the usual requirements. Similarly, Mr. Kulkarni also submitted that plans for
the 13th floor have also been sanctioned. Copies in respect of plans for the 11 th
and 13th floor were also approved on 26th July, 2019 and copies have been
tendered in court.
38. I am therefore of the opinion that the plaintiff-society cannot at this
ad-interim stage restrain the defendant no.5 from putting up further
construction. As a part of this relief, the plaintiff-society has also sought to
assail that the alteration of the plan of the 6 th floor was to provide an amenity
space by constructing units thereat. The affidavit filed on behalf of the SRA
clearly provides that originally it was sought to be maintained as an amenity
space, however SRA retained the rights at all times to approve change of
plans, which it had done in the instant case, especially since it was now
inclined to permit additional construction being put up. No doubt, part of this
may be because of the applicability of DCPR 2034, an aspect that the
defendant no.5 has sought to deny by contending that the FSI under DCR
1991 is yet to be exhausted; indeed, the affidavit-in-reply filed by SRA clearly
specifies that the FSI under DCR 1991 had not been exhausted and that there
was no increase in FSI sought under DCPR 2034. In view of this statement on
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
behalf of the SRA, this aspect of the matter must rest.
39. All that can be said in favour of the plaintiff-society is that the existing
purchasers cannot be prejudiced by virtue of the amendment in plans and
cannot be deprived of amenities that the developer was bound to provide. This
is an aspect which SRA will be conscious of and is expected to take into
consideration in permitting conversion of the same premises and probably
contemplating to compensate the construction by providing alternate space
for such amenity.
40. As far as the reliefs that the plaintiff-society seeks in relation to the
utilization of the 6th floor, its restoration and further construction upon floor
13 and above, it will be open for the plaintiff to take up the issue with the
SRA, if so advised. Whether or not such sanctions were permissible or not is
an aspect that cannot be gone into at this stage; indeed, that is not the
challenge. The challenge is against the defendant no.5 putting up such
construction and not against SRA permitting the same. In view of the
statements in the affidavit filed on behalf of the SRA, I am of the view that no
interference is called for at this stage.
41. That brings us to the question whether the plaintiff-society is entitled
to any relief in terms of handing over possession of the society's office along
with the records and accounts of all monies collected and maintenance
charges and taxes payable. The plaintiff-society has relied upon the
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
provisions of clauses 2(k), 4, 4.2, 4.3, 4.6, 4.7 and 4.9 of the standard form
agreements for sale executed with the unit purchasers. These clauses clearly
provide that the "common organization" contemplated by the developer-
promoter, which is now the society, would fix maintenance charges for
general maintenance of the building and which would be paid in advance by
the unit purchasers. It is further provided that the maintenance charges and
contributions are payable to the developers and promoters only till the
common organization is so formed. Furthermore, if a common organization is
formed, it is contended that till the plot is leased to the common organization,
the developer has a right to collect proportionate share in the outgoings in
respect of common areas and facilities. Thus, a distinction is drawn between
clause 4.2 and 4.3. Outgoings in respect of the unit in use and occupation of
a purchaser and charges for maintenance of common facilities could be paid
by the common organization / society, but till such time the plot is leased to
such common organization, the outgoings in respect of the proportionate
share of the members of the society in respect of common facilities would
have to be paid to the developer. This stands to reason since it is the
developer's obligation to maintain the common facilities during the period
that construction is continuing. On a case-to-case basis, this will have to be
evaluated.
42. In the present case, the building is said to be consisting of 277 units,
which are presently sold and largely occupied. The unit purchasers are not
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
entitled to withhold payment of maintenance charges till a common
organization is formed. This would entail that once the society is formed,
maintenance charges in respect of the individual units would have to be paid
over to the society and not to the developer and to that extent, the plaintiff-
society must succeed. Interpreting clause 4.3 would mean that outgoings in
respect of common areas and facilities of the plot would have to be paid over
to the developer / promoter till the plot is leased to the common organization.
The distinction between clauses 4.2 and 4.3 lies in the fact that clause 4.3
contemplates "common areas of the plot" and not the building. As far as the
building is concerned and the common facilities and areas of the building are
concerned, it cannot be contended that the payments are required to be made
to the developers. That would be a completely incorrect reading of the clause.
Clause 4.3 clarifies this and strengthens the view that all outgoings and
maintenance charges in respect of the units, which are now being managed
by the society, would have to be paid over to the society alone.
43. As far as the plot is concerned, there may be areas which all users
would have common access to such as the compound, yards etc. If that is so,
the developer will have to specify these amounts. Unless these amounts were
specified, no amounts could have been collected once the society has been
formed. Thus, as an extension of this, clause 4.7 would provide for the society
now to fix the maintenance charges since the society has now been formed.
Till the formation of the society however the developer would have to account
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
for the maintenance charges that have been recovered along with the actual
expenditure. There would have to be disclosure of these amounts in order to
meaningfully enforce clause 4.2. Thus, the developer's right to collect a 20%
charge and service tax on all maintenance charges and outgoings would have
to stop after the formation of the society. Needless to mention, a complete
disclosure would now be expected of the developer. In this respect, it is
material to note that SRA has vide its letters dated 19 th November 2019, 9th
December 2019 and 30th December 2019 (Exhibits F-1, F-2 and F-3 to the
plaint) directed the defendant no.5 to handover the society's office and all the
relevant documents to the plaintiff-society. This can be taken to its logical
conclusion.
44. That brings us to the allegations of interference and harassment by
persons engaged by defendant no.5, who are described as goons and anti-
social elements in the plaint. The contentions of the plaintiff-society are that
these persons have been employed in the lobby and generally around the
premises of the building in order to harass, intimidate and threaten members
of the plaintiff-society. They seek to prevent the members from carrying out
their duties and convening meetings. These persons have allegedly thrown
away articles of the plaintiff-society and assaulted the members of the society.
They held out threats to the members of dire consequences unless they fall in
line. In my view, if true, the plaintiff-society can always approach the law
enforcement agencies, who will, no doubt, look into the matter and take a
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
suitable preventive measure.
45. In an affidavit seen to be affirmed on 7 th October, 2020 tendered via
email but which is yet to be filed in the registry, the deponent Ali Murtaza has
admitted in paragraph 5.84 and 5.85 that the plaintiff has engaged a security
team. In that view of the matter there is no occasion for the defendant nos.5
and 6 to interfere or present the society's security team from carrying out
duties in the normal course. In view thereof and given the fact that no one
can take law into their own hands, I am of the view that the plaintiff-society
is entitled to protection by an ad-interim prohibitory order restraining the
defendant no.5 from engaging any persons to harass or threaten employees of
the society, as contemplated in prayer clause (b).
46. The last aspect that requires to be considered is the relief sought in
relation to operation of lifts and robotic parking, this is an aspect which has
been dealt with in some detail by both sides at the earlier hearings in this
matter. As a result of several attempts arriving at a workable solution, a
chartered accountant has been appointed and the order dated 9 th December
2020 details the methodology to be adopted. As on date, there is nothing to
indicate that this interim measure and an attempt to resolve the dead-lock in
the management of the affairs of the society will not succeed. There is
correspondence to indicate that the chartered accountant was (as of March 2,
2020) awaiting confirmation on the aspect of his professional fees. For want
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
of such confirmation, that chartered accountant has not been able to proceed
in the matter. It is expected that wiser counsel will prevail and both the sides
are agreed to do the needful to ensure that this exercise is completed
meaningfully and in order to avoid further controversy on the subject.
However, the records of the building as far as its maintenance and operations
are concerned, including arrangements between defendant no.5, 6 and 9
inter se, it would have to be managed by the society. To that extent, the
exercise by the chartered accountant is now expected to reveal whether there
are any illegalities committed by the developer and that is a matter for us to
consider at the appropriate stage. Suffice it to say that for the present the
parties are directed to co-operate with the chartered accountant to enable
him to reach his conclusions and file a report at the earliest.
47. In conclusion, I pass the following order :-
(i) There will be an ad-interim order in terms of prayer
clause (b) of the IA, which is reproduced below :-
"(b). That pending hearing and final disposal of the above suit, this Hon'ble Court be pleased to restrain the persons employed as security guards and or any other employees of Defendant No.5 and Defendant No.6 or any other persons claiming through Defendant No.5 and Defendant No.6 by a temporary order and injunction from obstructing, interfering or harassing the members of the Plaintiff, the Plaintiff's employees, agents and servants from
IAL-3846-2020-Hubtown Solaris (f).doc Dixit
managing the day-to-day affairs of the Plaintiff including maintenance of the building Hubtown Solaris, C.T.S. No.427, Village Gundavali, N.S. Phadke Road, Andheri (East), Mumbai - 400
069."
(ii) No case is made out for ad-interim relief in terms of
prayer clauses (f) and (h).
(iii) Reply dated 7th October, 2020 on behalf of defendant
nos.5 and 6 and replies of other defendants, if any, to be
filed within a period of eight weeks from today.
(iv) Affidavit-in-rejoinder, if any, to be filed within a period
of four weeks thereafter.
(v) List the IA per CIS.
(vi) Liberty to apply in furtherance of the order dated 25 th
November 2020, if so advised.
(A. K. MENON, J.)
IAL-3846-2020-Hubtown Solaris (f).doc
Dixit
Publish Your Article
Campus Ambassador
Media Partner
Campus Buzz
LatestLaws.com presents: Lexidem Offline Internship Program, 2026
LatestLaws.com presents 'Lexidem Online Internship, 2026', Apply Now!