Citation : 2016 Latest Caselaw 6025 Bom
Judgement Date : 15 October, 2016
(903) AOST 27460-16
IN THE HIGH COURT OF JUDICATURE AT BOMBAY
CIVIL APPELLATE JURISDICTION
Amk
APPEAL FROM ORDER (STAMP) NO. 27460 OF 2016
WITH
CIVIL APPLICATION (STAMP) NO. 27463 OF 2016
Mr. Mohd. Zuber Mohd. Yusuf Memon
Age-48 years, Indian Inhabitant of
Mumbai residing at Rambachan Singh
Compound, Vinoba Bhave Nagar,
Kurla (W), Mumbai-400 070. .. Appellant
Vs.
Municipal Corporation for Gr. Mumbai
(A Body Corporate incorporated under
the Provisions of BMC Act, 1889) having
its head office at Annexe Building,
Mahapalika Marg, Mumbai C.S.T.,
Mumbai - 400 001. .. Respondent
Mr. Virendra T. Dubey for the Appellant.
Mrs. M. R. Bhoir for the Respondent.
CORAM : DR. SHALINI PHANSALKAR-JOSHI, J.
DATE : 15th OCTOBER, 2016.
ORAL JUDGMENT
1. Admit.
2. With the consent of the learned counsel for the parties heard
finally at the stage of admission itself.
3. This appeal is preferred against the order dated 31.08.2016
passed by the City Civil Court, Mumbai in Draft Notice of Motion in L.C.
Suit No. 2058 of 2016 thereby refusing the ad interim relief as sought by
(903) AOST 27460-16
the appellant for restraining the respondent-Municipal Corporation from
taking any action in pursuance of the notice issued under Section 354-A of
the MMC Act on 23.05.2016 and in pursuance thereof, the order passed
by the Assistant Municipal Commissioner on 19.08.2016.
4. The case of the appellant is that, he is in possession of the
suit premises consisting of Ground + two floors area admeasuring about
1800 sq. ft. bearing CTS Nos.925 and 937, Rambachan Singh Compound,
Vinoba Bhave Nagar at Kurla (W), Mumbai-400 070. It is further his case
that the said construction consists of B.M. wall with A.C. sheet roof.
According to him, he has acquired said premises pursuant to the consent
terms dated 11.02.2016, filed in Suit No. 1359 of 2012. It is his case that
the said premises is in very same condition since inception and in
existence since prior to 1976. The area, in which the premises are
situated, is also declared as slum area vide Government Notification dated
12.02.1976. The structure is also assessed to the Municipal Taxes. He
has simply replaced the A.C. sheet roof in place of old one as the old one
was badly damaged. However, as his relations with the neighbours are
not cordial, they made false complaints to the Municipal Corporation and
the respondent-Municipal Corporation, acting on their complaints, issued
the impugned notice dated 23.05.2016 under Section 354-A of the MMC
Act calling upon him to stop immediately the erection of the unauthorized
construction of the second floor. He has replied the said notice with the
(903) AOST 27460-16
explanation that he is not carrying out any new construction but was just
replacing the A.C. sheet roof. He has also produced on record the
documents, like, the assessment bill of the year 1980. However, without
considering his contention, the final order came to be passed by the
Assistant Municipal Commissioner on 19.08.2016, thereby calling upon
him to remove the said construction on the ground that it is illegal and
unauthorized.
5. The appellant was, therefore, constrained to approach Trial
Court and by the draft Notice of Motion filed along with Suit, he sought the
relief of interim injunction restraining the respondent-Municipal Corporation
from taking any action in pursuance of the said notice and the final order.
6. The respondent-Municipal Corporation, however, resisted the
said Notice of Motion and after hearing the learned counsel for both the
parties, the Trial Court was pleased to reject the ad-interim relief.
7. The submission of the learned counsel for the appellant is
that, neither the respondent-Municipal Corporation nor the Trial Court has
properly considered his case. It is submitted that since beginning the suit
structure consists of Ground + two floors and he is not carrying out any
new construction but only changing the A.C. sheet roof. Secondly, it is
urged that the Trial Court has not considered the fact that, as the suit
structure is falling under the slum area, notified by the Competent
(903) AOST 27460-16
Authority, the Municipal Corporation cannot take any action. The reliance
is also placed on the unreported Judgment of this Court in the case of
Govardhan Ramnaresh Singh Vs. The Municipal Corporation of Gr.
Mumbai in Appeal from Order No. 257 of 1999 dated 15.04.1999 to
submit that once the construction is complete, the Municipal Corporation
cannot take any action under Section 354-A of the MMC Act and the
remedy lies somewhere in any other provision.
8. The reliance is also placed on the Judgment of this Court in
the case Shri Ramawatar Babulal Jajodia Vs. Municipal Corporation
of Gr. Mumbai, 2014 (2) ALL MR 303 to urge that the Municipal
Corporation has no jurisdiction to decide the complicated issues
specifically if they pertain to the slum area governed by the Slum Act.
According to the learned counsel for the appellant, therefore the impugned
order passed by the Trial Court rejecting the ad interim relief needs to be
quashed and set aside, especially, having regard to the notification issued
long back declaring the said survey number in which the suit premises fall,
namely, Survey No.257 as slum area.
9. Per contra, learned counsel for the respondent-Municipal
Corporation has strongly resisted these contentions by submitting when
the subject notice was issued, the construction was already in progress.
The appellant has not produced any document to show that the said
construction was carried out with due permission and getting the plans
(903) AOST 27460-16
sanctioned from the Municipal Corporation. The suit premises are not
assessed to census so as to attract the bar under the provisions of the
Maharashtra Slum Area Act and hence according to learned counsel for
the respondent-Municipal Corporation, the impugned order passed by the
Trial Court does not call for any interference.
10. In my considered opinion, the impugned notice issued to the
appellant on 23.05.2016 under Section 354-A of the MMC clearly goes to
show that, at the relevant time the unauthorized construction of second
floor was in progress and hence, the appellant was called upon to stop the
said construction or to produce the permission, if any, obtained from the
Competent Authority for carrying out such construction. The description of
the unauthorized construction, given in the impugned notice, is relevant
and it reads as follows:
"Unauthorized construction of second floor (Total 9 rooms) admeasuring 28 mtr x 7 mtr x 1.3 mtr ht. approx. on existing G+1 structure by using brick masonry wall at RamCacchan Tabela, C- Block, Opp. Siddiquiya Masjid, V. B. Nagar, Kurla (W), Mumbai-
70."
11. Now the description of the suit premises, which the appellant
claims to have been purchased from its earlier owner, by virtue of the
Consent Terms filed in the suit bearing No.3437 of 2012, as given in para
1 of the said Consent Terms is, as follows:
"It is agreed, declared and confirmed that the Defendants are liable to pay to the Plaintiffs the sum of Rs.28,00,000/- (Rupees Twenty eight lakhs only) being balance consideration in view of by virtue of and under Memorandum of Understanding dated 3rd day of August, 2011 for assignment of right and interest in respect of
(903) AOST 27460-16
land admeasuring 1250 Sq. Ft. out of land admeasuring 5,000 Sq. Ft. bearing Plot No. 257, CTS No. 937 and 925 of Village Kurla, Block, Ram Bachan Singh Compound, Saree Dying and Printing Karkhana, Gala No.2 Front, V. B. Nagar, Kurla (West), Mumbai-
400 070."
12. Thus, it is apparent that the premises which the appellant has
purchased by virtue of this Consent Terms is an open plot of land with one
Gala standing thereon. This description does not state that the
construction standing on the said land was of Ground + 2 upper floors. If,
it was so, there was no any reason for not to mention or give such
description. Though in the plaint, the appellant has given the description
of the premises as Ground + 2 upper floors but there is not a single
document, as observed by the Assistant Municipal Commissioner in his
final order, showing that the earlier structure which was in existence and in
respect of which the assessment was made for municipal taxes, was
consisting of Ground + 2 upper floors. The photographs, which were
produced on record by the Municipal Corporation and which the Trial Court
has considered while passing the impugned order, clearly reveal that when
the notice was issued to the appellant, the construction of second floor
was in progress. Even the photographs, which the appellant has
produced along with copy of the Judgment, on which he is relying on in the
Appeal from Order No. 257 of 1999, reveal that the construction of Ground
+ upper two floor was in progress.
13. Apparently, the burden was on the appellant to show that this
construction, which he has undertaken, was with proper permissions and
(903) AOST 27460-16
authority from the Municipal Corporation. Though the opportunity was
given to the appellant to prove the legality of the said construction, he has
failed to prove the same, either before the Assistant Municipal
Commissioner or even before the Trial Court or this Court. Merely saying
that he has not carried out the construction and he has only changed the
A.C. sheet roof is not sufficient. Hence, in the absence of any evidence
proving the permission or the plan sanctioned for such construction, the
Trial Court has rightly held that the said construction is illegal and
unauthorized and the Municipal Corporation was perfectly justified in
taking action against the said construction. Therefore, no interference is
warranted in the final order passed by the Assistant Commissioner and by
the Trial Court.
14. As regards the contention raised by the appellant is that, once
the suit construction is completed, then the remedy for Municipal
Corporation lies in some other provision and not in the provision like the
notice issued under Section 354-A of the MMC Act. However, in the
instant case, the photographs produced on record and the observations
made by the Trial Court, especially, recitals in the notice under Section
354-A reveal that when the notice was issued, the construction was in
progress. Moreover, there is no completion certificate or occupation
certificate to show that the construction is already completed. In view
thereof, the notice issued under Section 354-A of the MMC Act and the
(903) AOST 27460-16
action taken in pursuance thereof cannot be called illegal.
15. Even in respect of the Judgment relied upon by the learned
counsel for the appellant, that of Shri Ramawatar Babulal Jajodia
(supra), the same cannot be made applicable to the facts of the instant
case. As rightly submitted by the learned counsel for the respondent,
unless the suit structure is censused by the competent authority, mere
declaration of the said area as slum area is not sufficient to hold that the
Municipal Corporation has no authority to take any action against the
unauthorized constructions falling in the slum area. The Municipal
Corporation, being the Town Planning Authority, is having every power and
authority to take such action, therefore, this contention also fails.
16. The net result is that, as the Trial Court has, after considering
all the aspects, rightly rejected the ad interim relief of injunction claimed by
the appellant, no case is made out to interfere in the impugned order of
the Trial Court. The appeal holds no merits and hence stands dismissed.
17. In view of the disposal of the appeal, the civil application does
not survive and hence stands disposed of.
[DR. SHALINI PHANSALKAR-JOSHI, J.]
Publish Your Article
Campus Ambassador
Media Partner
Campus Buzz
LatestLaws.com presents: Lexidem Offline Internship Program, 2026
LatestLaws.com presents 'Lexidem Online Internship, 2026', Apply Now!