                   ORISSA HIGH COURT: CUTTACK
AFR
                       W.P(C) NO. 20645 OF 2022

      In the matter of an application under Articles 226 and 227
      of the Constitution of India.
                               ---------------

A.K. Das Associates Limited ..... Petitioner

-Versus-

      Odisha Power Transmission
      Corporation Limited (OPTCL)
      and others                              .....    Opp. Parties


            For Petitioner     :   Mr. Laxmidhar Pangari,
                                   Senior Advocate along with
                                   M/s. S. Mishra and A. Sahoo,
                                   Advocates,

            For Opp. Parties :     Mr. A. K. Parija, Sr. Advocate
                                   along with M/s. A. Behera
                                   and A. Mohanty, Advocates
                                   (O.P. Nos.1 to 3)
                                         &
                                   M/s. Sreejit Mohanty,
                                   H.M. Panigrahi and S.K. Mishra,
                                   Advocates.
                                   (O.P. No.4)

      P R E S E N T:

THE HONOURABLE DR. JUSTICE B.R.SARANGI AND THE HONOURABLE MR JUSTICE B.P. SATAPATHY

Date of Hearing: 24.11.2022 :: Date of Judgment : 02.12.2022 // 2 //

DR. B.R. SARANGI, J. A.K. Das Associates Limited, which is a

company registered under the Companies Act, 1956 and is

engaged in construction of Extra High Voltage (EHV)

Projects comprising of supply-civil installation and erection

of electrical sub-stations and tower lines on total turnkey

basis, has approached this Court by means of this writ

petition with a prayer to declare the decision of Orissa

Power Transmission Corporation Limited (OPTCL)-opposite

party no.1 in awarding the contract for the work "Design,

Engineering, Supply, Erection and Commissioning of (i) 2

x500 MVA, 400/220/33 KV Gas (SF6) Insulated Sub-station

(GIS) with SAS and 1X125 MVAr (400 KV) bus reactor with

control at Ersama, Paradeep. (ii) 400KV AIS feeder bay

extension with SAS (to be integrated with the existing SAS)

and 2 nos. 80 MVAr (400 KV) line reactors with suitable NGR

& its control (One dia) at 400KV New Duburi gird sub-station

for connectivity with proposed GIS S/S at Ersama, Paradeep,

on turnkey contract basis" in favour of opposite party no.4-

M/s. Bharat Heavy Electricals Limited (BHEL) as illegal,

arbitrary and contrary to the conditions of the tender, and

to quash the resolution of the Board of Directors of opposite // 3 //

party no.1 under Annexure-13 dated 16.07.2022 approving

the decision of the tender committee to issue LOA in favour

of opposite party no.4, and further to issue direction to

opposite party no.1 to conduct a fresh tender in respect of

the very same work, as mentioned above.

2. The facts leading to filing of this writ petition are

that the Orissa Power Transmission Corporation Limited

(OPTCL)-opposite party no.1, a Government of Orissa

Undertaking and a Transmission Licensee under the

Electricity Act, 2003, which is engaged in transmission of

power in the State of Orissa on behalf of the State

Government, floated a tender vide NIT No. 36/2020-21

dated 24.12.2020 under Annexure-2 for "Design,

Engineering, Supply, Erection and Commissioning of (i) 2

x500 MVA, 400/220/33 KV Gas (SF6) Insulated Sub-station

(GIS) with SAS and 1X125 MVAr (400 KV) bus reactor with

control at Ersama, Paradeep. (ii) 400KV AIS feeder bay

extension with SAS (to be integrated with the existing SAS)

and 2 nos. 80 MVAr (400 KV) line reactors with suitable NGR

& its control (One dia) at 400KV New Duburi gird sub-station // 4 //

for connectivity with proposed GIS S/S at Ersama, Paradeep,

on turnkey contract basis."

2.1 As per the Instruction to Bidder (ITB), a joint

venture or consortium of two qualified firms as partners can

bid in the tender. Accordingly, the petitioner entered into a

joint venture agreement with M/s Siemens Limited and

participated in the tender process, besides seven other

bidders including opposite party no.4-M/s Bharat Heavy

Electrical Limited (BHEL), pursuant to the NIT No.

36/2020-21 dated 24.12.2020 under Annexure-2.

2.2 Under clause-4.1.1(i) of the NIT it was provided

that to be qualified for the tender, the bidder must have

successfully executed and commissioned two numbers of

400 KV or higher voltage class GIS (SF6) Grid sub-station

on turnkey contract basis including Engineering, Design

with Supply, Erection and Commissioning and the said

work should have been completed during the last seven

years reckoned from the date of the opening of bid in India.

Opposite party no.4-M/s Bharat Heavy Electrical Limited

(BHEL) in its bid submitted the documents in the Schedule-

// 5 //

IV of the NIT, which included two performance certificates,

one from SJVN Ltd, a Government of Himachal Pradesh

Undertaking, and the other from NHPC. Of the two

performance certificates submitted by opposite party no.4 in

support of the declaration in Schedule-IV, the certificate

obtained from SJVN Ltd. although indicates that opposite

party no.4 had completed commissioning of 400 KV sub-

station on 04.10.2014, but the same does indicate that the

said project was completed on turnkey contract basis,

which is an essential and mandatory requirement of the

NIT.

2.3 In the meeting held on 03.11.2021, the Purchase

Sub-Committee (PSC) deliberated on the Techno

Commercial Report and recommended that the price bid of

opposite party no.4 may not be opened, as it is techno-

commercially non-responsive and does not meet the

qualifying requirement. Hence, six numbers of bidders,

including the petitioner-company, participated in the tender

process. On qualifying as the top 50% of the responsive

bidders, the petitioner participated in the e-reverse auction

and was found to be the lowest bidder. Accordingly, the PSC // 6 //

in its meeting held on 25.11.2021 recommended for

issuance of LoA in favour of the petitioner on turnkey

contract basis.

2.4 But the PSC in its meeting held on 29.11.2021

recommended to cancel the NIT under Annexure-2 and to

go for a fresh bid. In the 125th meeting of the Board of

Directors of opposite party no.1-OPTCL, the Board of

Directors approved the recommendation of PSC. As a

consequence thereof, the OPTCL-opposite party no.1 issued

a fresh NIT vide No.CPC-49 of 2021-22 for the same project

for which the NIT vide No. CPC-36 of 2020-21 was issued.

In response to the NIT vide No. CPC-49 of 2021-22 under

Annexure-9, the petitioner as well as M/s BHEL-opposite

party no.4 and three other companies participated in the

tender process and submitted their respective bids along

with requisite documents, including the performance

certificates in respect of previous work orders completed as

per Clause 4.1.1(i) of the NIT.

2.5 In terms of Clause-4.1.1(i) of the NIT, M/s BHEL-

opposite party no.4, along with its bid documents submitted // 7 //

the performance certificate issued by the SVJN limited,

which indicates that the project for installation of 400 KV

GIS at Rampur was completed and commissioned on

27.10.2015. In view of Schedule-IV of the NIT, the bid of

M/s. BHEL-opposite party no.4 has to be disqualified and

should have been rejected on the ground that the facts

indicated in the format and performance certificate attached

thereto do not disclose that it had executed the project of

SVJN Ltd. at Rampur on turnkey project basis, which is the

mandatory requirement as per Clause-4.1.1(i) of the NIT

and for which the bid of opposite party no.4, which was

submitted in pursuance of the 1st NIT under Annexure-2,

was disqualified. In the certificate furnished in the previous

tender it was indicated that the date of completion of

Rampur Project was 04.12.2014, whereas in the certificate

submitted in the present tender under Annexure-10 series,

the date of completion has been indicated to be 27.10.2015.

The petitioner downloaded from the website of the said

company, i.e. SJVN Ltd., the details of the project in respect

of the certificate obtained, which confirms that at Rampur,

opposite party no.4 has executed the project not on turnkey // 8 //

basis but on a simple supply contract and the project was

completed on 04.12.2014. Thereby, for having not met the

requirement under Clause 4.1.1 of the NIT, the opposite

party no.4 has become in-eligible for the second tender.

Therefore, its bid should have been rejected. But the

financial bid of opposite party no.4 was opened by opposite

party no.1 for price evaluation, where it was found that

opposite party no.4 had quoted Rs.209,82,28,002/-, which

was 4.75% more than the revised estimated cost, i.e.,

Rs.200,31,49.600/- and Rs.9.00 crores more than the L1

price offered by petitioner in the first tender. Therefore, the

bid submitted by opposite party no.4 should have been

rejected and, as such, the petitioner raised protest against

such illegality and requested opposite party No.2 to take a

fair and just decision in conducting of the tender process.

The authenticity of the performance certificate issued by the

SVJN Ltd. in respect of the project for installation of 400 KV

GIS at Rampur which was submitted by M/s BHEL-

opposite party no.4 for the tender process under Annexure-

9 has been ignored. The inconsistency in the details

regarding the date of completion of the above project has // 9 //

also been ignored. More so, M/s BHEL-opposite party no.4

does not meet the qualifying requirement as stated in

Clause-4.1.1 of the NIT, as the earlier work executed by the

M/s BHEL-opposite party no.4 was not on turnkey contract

basis, which is an essential and mandatory condition of the

qualifying requirement for bidders under Clause 4.1.1 for

the NIT. In the 129th meeting of the Board of Directors of

opposite party No.1-Corporation, the Board of Directors

ignoring the qualifying requirements in respect of M/s.

BHEL-opposite party no.4, approved the proposal for

issuance of LoA in favour of M/s. BHEL-opposite party

no.4. Hence, this writ petition.

3. Mr. L. Pangari, learned Senior Counsel appearing

along with Mr. S. Mishra, learned counsel for the petitioner

vehemently contended that the acceptance of the bid

submitted by M/s. BHEL-opposite party no.4 by taking the

decision in the Board of Directors' meeting of opposite party

no.1 for issuance of LoA is arbitrary, unreasonable and

contrary to the provisions of law. The performance

certificate dated 07.08.2017 and the performance certificate

dated 22.12.2021 are identical and issued on the self-same // 10 //

subject-matter. When the first certificate dated 07.08.2017

had not been accepted, the second certificate in respect of

the same subject-matter ought not to have been accepted,

as the performance certificate dated 22.12.2021 did not

envisage a turnkey project that was executed by opposite

party no. 4, which is the requirement in the NIT bearing No.

CPC-49/2021-22. It is further contended that the NIT

bearing No. CPC-49/2021-22 includes execution of civil

work within the scope of the project. The performance

certificate submitted by opposite party no. 4 does not certify

that it has conducted any civil work in execution of such

project.

3.1 It is further contended that once on the basis of

the documents submitted by M/s BHEL-opposite party no.4

in the first tender, the PSC found that the bid of opposite

party no.4 was techno-commercially non-responsive, for the

second tender having the same scope of work and same

qualifying requirement, the documents submitted by M/s

BHEL could not have been accepted. Furthermore, on

receipt of the bid, opposite party no.1 having sought for

information from opposite party no.4 pertaining to techno // 11 //

commercial evaluation and asked to submit complete order

copy along with the BOQ for supply, erection and civil

contract of the Rampur Hydro Power Station and to submit

credentials/documents/evidence in support of turnkey

project executed, and as per the said query, opposite party

No.4 in its reply vaguely mentioned that M/s BHEL fully

meets the OPTCL QR as far as the turnkey scope is

concerned. According to him, not being satisfied with the

explanation of M/s BHEL-opposite party no.4 that it had

completed the Rampur GIS S/S on turnkey basis, opposite

party no.1 through e-mail made query from SJVN Ltd. to

the effect that "whether both first and second contract

executed by M/s BHEL-opposite party no.4 has been

awarded under turnkey contract basis for 400 KV GIS S/S".

In reply to the said query, SJVN clarified that the contract

for Rampur Hydro Electric Project was awarded to M/s

BHEL covering engineering, design, supply, storage,

erection, testing and commissioning scopes lying with M/s.

BHEL (including 400 KV GIS Switchyard scope), but did not

mention that the contract was executed under turnkey

contract basis.

// 12 //

3.2 It is further contended that PSC of opposite party

no.1 in its proceeding took sudden U-turn and

recommended that M/s BHEL-opposite party no.4 is

meeting both technical and financial qualifications

stipulated in the bid documents by intentionally ignoring

the fact that opposite party No.4 has not submitted any

document to indicate that they have completed any 400 KV

GIS S/S on turnkey basis with associated civil work.

Though the scope of the work of the subject tender includes

massive civil construction, for which the bidders were

required to submit proof, that they have executed similar

type of contracts on turnkey basis with associated civil

works, but ignoring the same the Board approved the

proposal for issuance of LoA in favour of M/s BHEL-

opposite party no.4. That itself vitiates the acceptance of

bid of opposite party no.4, which was otherwise disqualified

for non-compliance of the QR, and the decision of opposite

party no.1 is arbitrary, unfair and illegal.

3.3 It is also contended that M/s BHEL-opposite

party no.4 was disqualified for not having met the techno

commercial requirement of the tender. In the first tender, // 13 //

the petitioner was the lowest bidder having quoted

Rs.2,00,63,35,946/-. Considering the same, in the second

tender opposite party no.1 had fixed the estimate cost of

the package for Rs. 200.31 crore on turnkey contract basis.

But opposite party no.1 decided to award the contract in

favour of opposite party no. 4 at Rs. 209.32 crore at the

cost of public exchequer, which cannot sustain, and

accordingly contended that the same should be quashed. It

is further contended that the decision taken by opposite

party no.1 to award the contract in favour of opposite party

no.4 is arbitrary, illegal, discriminatory and smacks

favoritism which is against public policy and rule of law. It

is also contended that the basic principles of turnkey

project has not been understood, therefore, award of the

contract in favour of opposite party no.4 cannot sustain.

According to him, "turnkey" means "turn the key" and open

and enter into the house. Meaning thereby, to complete the

work in all respect and allow the awardee of the contract to

enter into the house. The same having been lacked in this

case, the award of contract in favour of M/s BHEL-opposite // 14 //

party no.4 cannot sustain and the same is liable to be

quashed.

To substantiate his contention, reliance has been

placed by the learned Senior Counsel appearing for the

petitioner on the cases of West Bengal State Electricity

Board v. Patel Engineering Co. Ltd and others, (2001) 2

SCC 451 : AIR 2001 SC 682, Kanhaiya Lal Agrawal v.

Union of India (UOI) and others, (2002) 6 SCC 315 :AIR

2002 2 SC 2766 and Poddar Steel Corporation v. Ganesh

Engineering Works and others, (1991) 3 SCC 273 : AIR

1991 SC 1579 and also Black's Law Dictionary 8th Edition

and Cambridge Business English Dictionary and Wikipedia

for explaining the meaning of turnkey.

4. Mr. A.K. Parija, learned Senior Counsel

appearing along with Mr. Arnav Behera, learned counsel for

opposite party no.1 contended with vehemence that the

performance certificates dated 07.08.2017 and 22.12.2021

are different in context and issued in verification of different

scopes of work, and are also issued for different purposes.

To clarify the same, the performance certificate dated // 15 //

07.08.2017 was issued for certification that M/s BHEL Ltd.

had designed, manufactured, supplied, tested, erected and

commissioned six (6) numbers of Hydro Generating Sets for

participating in future hydro tenders. Whereas, the

performance certificate dated 22.12.2021 was issued in

respect of complete design, engineering, supply, inland

transportation, insurance, delivery, handling, storage,

erection, testing and commissioning of all equipments

required for 400 KV GIS Switchyard. This clearly satisfies

the 'turnkey' requirement under the tender. It is also

contended that the certificate dated 22.12.2021 clearly

states that the date of commissioning of 400KV GIS

Switchyard was 27.10.2015, which is within a period of 7

years on the date on which the NIT was issued, i.e., on

07.01.2022. Opposite party No.1 sought clarifications from

opposite party no. 4 regarding the issuance of performance

certificates dated 07.08.2017 and 22.12.2021 vide email.

Opposite party no. 4 on 05.03.2022 clarified in clear terms

that the performance certificate dated 22.12.2021 is

specifically for 400 KV GIS Switchyard portion for complete

Rampur HEP (412 MW) E&M package which was // 16 //

successfully commissioned by M/s BHEL as an EPC

contractor on 27.10.2015. On the other hand, the

performance certificate dated 07.08.2017 was issued by

SJVN Ltd. for Generating Units. M/s. BHEL further clarified

that the performance certificate dated 22.12.2021 was

issued for "Engineering, Design, Erection and

Commissioning" of the Project which was the pre-requisite

as per tender definition for a turnkey contract.

4.1 It is further contended that opposite party no. 1

sought clarifications from SJVN Ltd., which were confirmed

vide E-mail dated 14.03.2022, thereby, so far as non-

execution of civil work is concerned, that is completely a

misconceived one. The NIT at Clause 2.2 (ix) (G), (H) and (I)

identifies the civil work to include, inter alia, construction

of control room building & other systems like illumination

of building, ventilation, ceiling, air conditioning, firefighting

& smoke detection facility as per specification. Therefore,

the submission that M/s BHEL-opposite party no.4 had

not executed any civil work even though the same was

required by the NIT, is not tenable. In so far as the

allegation that the project executed by M/s BHEL Ltd. was // 17 //

not on a turnkey basis is concerned, the same does not

stand on any legal footing.

4.2 To substantiate his contention, reliance has been

placed on the definition of "turnkey" as laid down by the

apex Court in the Indure Ltd. & Anr. v. Commercial Tax

Officer & Ors. (2010) 9 SCC 461, Director of Income Tax-

II (International Taxation) New Delhi and Anr. v.

Samsung Heavy Industries Company Ltd, (2020) 7 SCC

347. Reliance is also placed on Black's Law Dictionary

(8th edn.) at page 1555.

4.3 Further, it is contended that the scope of judicial

review in respect of award of tenders is very limited and

interference can only be made if a clear-cut case of

arbitrariness, mala fide, or bias or irrationality is made out.

To substantiate the same, reliance is placed on the cases of

Pratap Chandra Sahu v. State of Odisha and others,

2020 (II) OLR 126; Utkal Suppliers v. State of Odisha &

Ors. 2020 SCC OnLine Oni 670, Silppi Constructions

Contractors v Union of India & Anr, (2020) 16 SCC 489,

Uflex Limited v. Government of Tamil Nadu and others, // 18 //

(2022) 1 SCC 165 and N.G. Projects Limited v. Vinod

Kumar Jain & others, (2022) 6 SCC 127. Thereby, it is

contended that there is no infirmity in the decision making

process, nor is the decision of opposite party no.1 to award

tender in favour of opposite party no.4 arbitrary, illegal or

contrary to the conditions of the tender so as to warrant

interference by this Court.

4.4 It is further contended that the petitioner has

abandoned his bid being not participated in the E-Reverse

Auction by not reducing his bid price. Therefore, the

petitioner has no locus standi to maintain the present writ

petition. The petitioner, having abandoned his bid by not

participating in the E-Reverse Auction by not reducing his

price, is not a "Person Aggrieved" and, therefore, has no

locus to challenge the grant of tender to opposite party no.

4. Accordingly, he contended that the writ petition is liable

to be dismissed.

5. Mr. S. Mohanty, learned counsel appearing for

opposite party no.4 very fairly contended that M/s BHEL is

the beneficiary of the decision taken by opposite party no.1-

// 19 //

OPTCL and whatever argument has been advanced by Mr.

A.K. Parija, learned Senior Counsel appearing for the

opposite party no.1 is being adopted by it. In addition to the

same, it is contended that the petitioner was a constituent

of an unincorporated joint venture led by M/s Siemens Ltd.

The said unincorporated joint venture, which is a legal

entity, was the bidder. But the instant writ petition has

been filed by the petitioner alone who, on its own, is not

qualified as a bidder. It is contended that the petitioner,

being ineligible to bid on its own, cannot have any

independent cause of action to file this writ petition.

Thereby, seeks for dismissal of the writ petition.

5.1 It is further contended that opposite party no. 4

fulfills the requirements stipulated in Clause-4.1.1 of the

NIT on the basis of the performance certificates issued in

respect of the work executed for Gujarat State Electricity

Corporation Ltd. and SJVN Ltd. at Rampur Project.

Therefore, the allegation made, that Rampur Hydroelectric

Project of SJVN Ltd. was not executed by opposite party

no.4 on turnkey basis, cannot sustain in the eye of law. It is

contended that the employer of the said project i.e., SJVN // 20 //

Ltd., a PSU has expressly certified vide performance

certificate dated 22.12.2021 that opposite party no.4 has

done "complete design, engineering, supply, inland

transportation, insurance, delivery, handling, storage,

erection, testing & commissioning of all equipment required

for 400 KV GIS Switchyard". Thereby, the term "turnkey" is

explained in dictionary to mean "complete and ready to use

immediately". This term has varied meaning as per the

definitions in legal dictionaries. Clause-4.1.1 (i) of the NIT

employs the term "turnkey contract" in the context of

specifying the qualifying requirements of the bidders. As

such, the term "on turnkey contract" in sub-clause-(i) of

Clause-4.1.1 of the NIT is preceded by the words,

"Engineering, Design, Erection and Commissioned of: (i)

two nos. of 400 KV or higher voltage class GIS (SF6) Grid

sub-station with minimum (Three) Bays in each S/S".

Therefore, it is contended that the word preceding the

phrase "on Turnkey Contract" lend colour to the term "on

turnkey contract". As M/s BHEL-opposite party no.4 had

executed the work of different nature, that fulfills the

requirement of "on Turnkey Contract" as per Clause-4.1.1 // 21 //

(i) of the NIT. Thereby, no illegality or irregularity has been

committed in settling the contract in its favour. According

to him, if at all there is any ambiguity in construing the

meaning of the term "on Turnkey Contact" at Clause-

4.1.1.(i) of the NIT, then the interpretation of the said term

by the author of the NIT, namely, OPTCL- opposite party

no.1 deserves primacy. Opposite party no.1-OPTCL having

examined the information and documents furnished by M/s

BHEL-opposite party no.4, who was fulfilling the qualifying

requirement as per the NIT, has also sought clarification

and opposite party no.4 has responded to such request by

furnishing explanation with supporting material, and

opposite party no.1 has cross-checked the correctness of

the explanation furnished by opposite party no.4 from

SJVN Ltd. and only after deliberating on the clarification

furnished, proceeded to qualify the opposite party no.4. As

such, the petitioner cannot raise objection on such decision

and also in exercise of power of judicial review, the Court

should not interfere with the said decision making process,

as there is no arbitrariness, unreasonableness by reaching // 22 //

such conclusion. Thereby, he prayed for dismissal of the

writ petition.

5.2 To substantiate his contention, reliance has been

placed on Gammon India Limited v. Commissioner of

Customs, Mumbai, (2011) 12 SCC 499 and Consortium of

Thermopads Pvt. Ltd v. National Aluminum Company

Ltd, MANU/OR/0441/2022.

6. This Court heard Mr. L. Pangari, learned Senior

Counsel appearing along with Mr. S. Mishra, learned

counsel for the petitioner and Mr. A.K. Parija, learned

Senior Counsel appearing along with Mr. A. Behera, learned

counsel for the opposite parties no.1 to 3, and Mr. S.

Mohanty, learned counsel appearing for opposite party no.4

in hybrid mode and perused the records. Pleadings have

been exchanged between the parties and with the consent of

learned Counsel for the parties, the writ petition is being

disposed of finally at the stage of admission.

7. On the face of the factual matrix as well as the

rival submissions of the parties, as delineated above, the // 23 //

following issues are framed for effective adjudication of the

case:-

(1) Whether the decision taken for issuance of LoA by the OPTCL-opposite party no.1 in favour of BHEL-opposite party no.4 on the basis of the performance certificate furnished by it satisfying the requirement of "Turnkey Contact", pursuant to the NIT No. CPC 49/2021-22 is justified or not ?

(2) Whether the petitioner has locus to file the present writ petition or whether the writ petition filed at the behest of the petitioner is maintainable or not ?

(3) Whether the petitioner is a person aggrieved or not?

8. Issue No.1.

To answer this issue in proper perspective, it is

worthwhile to take note of the relevant conditions stipulated

in the E-Tender Notice No.CPC-49/2021-22 for Package-

49/2020-21 under Annexure-9.

(Page-82 of the Brief)

"ODISHA POWER TRANSMISSION CORPORATION LTD. invites bids (in e- tendering mode only) under single stage two-envelop system from reputed EPC/Turnkey Contractors for Design, Engineering, Supply, Erection and Commissioning of:

(i) 2x500 MVA, 400/220/33KV Gas (SF6) Insulated Sub-station (GIS) with SAS and 1X125 MVAr (400 KV) bus reactor with control at Ersama, Paradeep.

(ii) 400KV AIS feeder bay extension with SAS (to be integrated with the existing SAS) and 2 nos. 80 MVAr // 24 //

(400 KV) line reactors with suitable NGR & its control (One dia) at 400KV New Duburi gird sub-station for connectivity with proposed GIS S/S at Ersama, Paradeep.

at an Estimated Cost of the Package for Rs. 200.31 Crore on "Turnkey CONTRACT BASIS".

The contents of the NIT are as follows:-

(Page-83 of the Brief) Sl. No. Particulars Page No From To

1. Tender Notification Notice Inviting Tender (NIT) 2 2

2. Bid Documents VOLUME-I (Free View) 5 8 Section-I- e-Notice Inviting Tender (e-NIT) 9 42 Section-II: Instruction to Bidder (ITB) 43 98 Section-III : General Conditions of 99 113 Contract Section-IV: BID PROPOSAL SHEET (BPS) 114 148 Section-V: ANNEXURE For Participant Bidder (s) VOLUME-II : (ENCLOSED SEPARATELY) Section-I: SCOPE OF WORK, TECHNICAL SPECIFICATIONS.

Section-II: GUARANTEED TECHNICAL PARTICULARS (GTP)

3. For Participant Bidder (s) Bid Forms (In. XLS Formats):

(AVAILABLE IN THE E-TENDER PORTAL OF OPTCL) Section-I: TECHNICAL SCHEDULES.

Section-II : PRICE SCHEDULES.

(Page-84 of the Brief) VOLUME-I  Section-I: e-Notice Inviting Tender (e-NIT)  Section-II: Instruction To Bidder (ITB)  Section-III: General Conditions of Contract (GCC)  Section-IV: BID PROPOSAL SHEET (BPS)  Section-V : ANNEXURES.

(Page-91, 92 & 93 of Brief) Instruction to Bidder (ITB) // 25 //

2.0 Brief Scope of Package (s)/Works:

2.1 Package (s)/Work No.: <49/2021-22>

2.2 Scope of Works: Design, Engineering, Supply, Erection and Commissioning of:

(i) 2x500 MVA, 400/220/33KV Gas (SF6) Insulated Sub-station (GIS) with SAS and I X125 MVAr (400 KV) bus reactor with control at Ersama, Paradeep.

(ii) 400KV AIS feeder bay extension with SAS (to be integrated with the existing SAS) and 2 nos. 80 MVAr (400 KV) line reactors with suitable NGR & its control (One dia) at 400KV New Duburi gird sub-station for connectivity with proposed GIS S/S at Ersama, Paradeep.

i) Supply of all equipment & materials for the sub-

station including 2x500 MVA, 400/220 KV ICTs & 125MVAr (400 KV) Bus Reactor and 80MVAr (400 KV) Line Reactors with NGR etc as per Price Schedule & Technical Specification xxx xxx xxx

vii) Execution of civil works as per schedule for erection of Building (S/S), equipment foundation(S/S), construction of earth mat, cable trench, drainage system, Boundary Land Scaping, approach roads, inside roads, Main Gate etc. etc. as per Price Schedule & Technical Specification xxx xxx xxx

ix) Name of the work: Construction of 2x500 MVA, 400/220/33 KV Gas (SF6) Insulated Sub- station (GIS) with SAS at Ersama, Paradeep and 125 MV Ar bus reactor.

Details of Provisions to be kept in the Sub- station are as follows:

Scope of work for GI sub-station:

xxx xxx xxx

(E) Supply, installation, testing & commissioning of Sub-station automation system including protection panels as per specification. The SAS architecture shall be on PRP (Parallel Redundancy Port) based, therefore accordingly all the LED's (IEC 61850) shall be selected for the GIS station.

// 26 //

(F) Supply and installation of equipment & materials as per BPS (including all civil works)

(G) Construction of 400KV & 220 KV GIS room building with BOT crane & other system like illumination of building, ventilation system with separate AHU unit, Air conditioning for panel rooms, firefighting & smoke detection facility etc. as per specification and BPS. Provision of Building, lightning protection. The outer & internal painting shall be suitable to resist from the effect of saline & chemical as Paradeep is near sea coast.

(H) Construction of Control room building & other system like illumination of building, ventilation, Ceiling, Air conditioning, firefighting & smoke detection facility etc as per specification and BPS. Provision of Building lightning protection. The outer & internal painting shall be suitable to resist from the effect of saline & chemical as Paradeep is near sea coast.

(I) Provision of store shed, earthing, fencing, roads, drains, gates, security shed, water arrangement, Lighting cum Lightning Masts, Switchyard illumination and all other civil works etc as per specification and BPS.

xxx xxx xxx

(M) Other requirement as indicated below for both the GIS sub-stations:

1. Construction of GIS and Control room building. Construction of other pudding as indicated in the price schedule. Paintings of the buildings.

2. Provision of equipment foundations, erection of structures & equipment. Store shed, Boundary wall & its painting, earth mat & earth pits & provision of water to the earth pits, fencing, roads, drains, gates, security shed, Bore wells for water arrangement, provision of PHED system, Lighting cum Lightning Mast, Switchyard illumination, switch yard building & other // 27 //

building illumination, Transformer foundation, oil sump pit for the transformer, Fire wall, street lighting, and all other civil works etc. as per specification.

3. Testing and commissioning of Substation equipment & accessories.

4. Contractor is advised to procure the equipment & materials sequentially as per the requirement at field, to avoid unnecessary dumping at the site.

Therefore. prioritization of such procurement shall he carried out in consultation with the Engineer in Charge.

5. Successful testing, commissioning & inspection of the installations as per Govt. rule to be considered.

6. Commissioning of the Sub-station & detail material reconciliation.

7. Handing over of the completed system to the Owner.

(Page-95, 96 of Brief) 4.0 QUALIFYING REQUIREMENTS (QRs) OF BIDDER(S):

4.1 Technical Qualification:

This bid is open to any EPC/Turnkey Contractor domicile in India independently or in Joint Venture/Consortium, who meets the following Technical qualifying requirement;

4.1.1 The bidder, as a Principal Contractor must have successfully executed and Engineering, Design, Erection and commissioned of:

(i) Two nos. of 400 KY or higher voltage class GIS (SF6) Grid sub-station with minimum 3 (Three) Bays in each S/S on Turnkey Contract-

// 28 //

(ii) Erection and Commissioning of at least one no.

of ICT of capacity 315 MVA (400/220 KV) or above.

(iii) Must have successfully executed and Commissioned of Two nos. of 400 KV or higher voltage class Bay (AIS) on Turnkey Contract basis including Engineering, Design with Supply, Erection and Commissioning.

(iv) The GIS must be offered from Indian Manufacturer, who meets the requirement mentioned at 4.1.2.

On Turnkey Contract basis in India for,

 Any Transmission/Generation Utility State Govt. / Central Govt. / any PSU.

OR

 Any Associated Transmission System for IPPs (Independent Power Producers) having installed capacity of 500MW or above in India.

OR

 Any agency awarded in a Tariff Based Competitive Bidding (TBCB) by any State Govt. / Central Govt. /PSU in India.

 The above work should have been completed during last 7 (Seven) years reckoned from the date of opening of Bid(s) in India.

 The above work should have been under successful operation for a minimum period of one year reckoned from the date of opening of Bid(s).

(Page-99 &100 of the Brief)

4.1.3 Other Technical Qualification:

4.1.3.2 The Bidder must upload copies of the relevant Work Orders along with Handing Over and Taking over Certificate or Client certified copies of Completion Certificate in proof of successful execution of Works and // 29 //

Performance Certificates duly signed by the competent authority of the Principal employer in proof of successful operation of the above quantum of work's. The works experience schedule shall be as per proforma given here under.

                      Table: Tech-1
                Work Experience Schedule
  Work         Order Sub-Stations/Lines Installed,
  Ref.                Erected Commissioned


  Sl.   FY   Name Work        Qty (No. of   Date    of   Documents
  No         of the Order     Sub-          Completio    provided in
             Client Ref       Stations/     n       of   proof      of
                    (No. &    Kms      of   Commissio    having
                    Date)     Lines)        ning         completed
                              Installed/                 the   works
                              Erected                    and/ or of
                                                         successful
                                                         operation as
                                                         the     case
                                                         may be.
                                                         (As
                                                         Attachment)




  Note:

1. The Tech-1 (Work Experience Schedule) is in XIS format as Schedule-IV of Technical bid hosted in the Tender portal and the same shall be keyed in by the bidder(s).

2. Supporting documents in favour of the above mentioned requirement shall have to be submitted/ uploaded by the Bidder as an attachment to the e-tender folder (Attach 3.pdf).

3. Failure to furnish/upload any or all information as required as a part of Bid document in all respect will be at the Bidder's risk and may result in rejection of the Bid.

(Page-100 &101 of the Brief) // 30 //

4.2 Bidder's Performance Qualification:

 xxx             xxx                 xxx

 4.2.4     The bidder must not been declared Insolvent or

referred to National Company Law Tribunal (NCLT) under the Insolvency and Bankruptcy Code (IBC), 2016. In such case the bid shall also be rejected. In this respect one undertaking from the bidder that they are not declared as Insolvent or referred to NCLT under IBC shall be submitted along with the bid. Non-disclosure of this fact by the bidder will lead to rejection of the bid or termination of the contract with forfeiture of EMD/CPBG.

Note:

1. The intending bidder shall furnish/upload the undertaking to this effect in the prescribed format enclosed to the e-tender.

2. Failure to furnish/upload any or all information as required as a part of Bid document in all respect will be at the Bidder's risk and may result in rejection of the Bid.



               (Page-103-104 of the brief)

 4.4      BID CAPACITY QUALIFICATION:


 iii.    Bidder's Technical Bidder shall be Technically
         Eligibility        eligible   based    on   the
                            qualifying       requirement
                            mentioned under Clause-4
                            (Qualifying     Requirments
                            (QRs) of Bidder) except
                            Bidders Bid Capacity.




              (Page-110-111 of the brief)

5.5       Documents/ Schedules to be Furnished/
          Uploaded/ Keyed-in:
                                 // 31 //




       1. Technical Bid-Part-I

(B) Soft Form of Documents (Scanned Copy to be uploaded in the e-Tender Portal of OPTCL):

Following are the Soft form of scanned documents in PDF file to be uploaded on the Official e-Tender Portal of OPTCL www.tenderwizard.com/OPTCL as an attachment.

3. Following documents/Credential in support of meeting Technical Qualifying requirement: i. Work Orders/LOA (including detailed bill of quantity for supply & erection works with associated civil works) ii. Commissioning Certificate/ Handing Over and Taking Over Certificate/ Client Certified copies of completion certificate in respect of the work orders furnished as above.

iii. Performance Certificate in respect of the work orders furnished as above.

iv. Valid HT/EHT Electrical License of the EPC/ Turnkey Contractor available from anywhere in India. (In case of Joint Venture/Consortium Valid HT/EHT license available from anywhere in India possesses by the Lead partner).

8.1 Taking into consideration the above conditions, it

is to examine whether M/s. BHEL-opposite party no.4 has

satisfied the requirement or not. There is no dispute that

earlier opposite party no.1 issued a notice inviting tender

bearing NIT No. CPC-36/2020-21 (PACKAGE- 36 (i)/2020-

21). But the same was cancelled, pursuant to which the

second tender was issued vide NIT No. CPC-49/2021-21

(PACAKGE-49/2020-21) under Annexure-9. Thereby, the // 32 //

bidder has to satisfy the requirement, as mentioned in the

bid documents. For the purpose of adjudication, the

relevant portion of the NIT has already been referred to

above. On that basis, the petitioner and opposite party no.4

applied for the same. On receipt of the bids, the OPTCL-

opposite party no.1 sought clarification from M/s. BHEL-

opposite party no.4 pertaining to techno commercial

evaluation and also asked to submit complete order copy

along with the BOQ for supply, erection and civil contract of

Rampur Hydro Power Station and to submit credentials/

documents / evidence in support of turnkey project

executed vide letter dated 03.03.2022 under Annexure-F/1

and directed that the same should reach before 11.00 A.M.

on 07.03.2022.

8.2 The query made was to the following effect:-

(Page-196 of the brief) Sl. No. Requirement as Bidders to comply per bid document (uploaded the same in tender wizard and also submit hard copy of the same.

Two nos. of 400 (i) The bidder have done KV or higher the E&M works of voltage class GIS Rampur HEP (412 MW) (SF6) Grid sub- including scope of 400kV station with GIS switchyard of SJVN minimum 3 Ltd. The bidder should (Three) Bays in submit the complete order // 33 //

each S/S on copy along with the BoQ Turnkey for Supply, Erection and Contract. Civil contract of above work.

                (ii)    Again      as      per
                performance        certificate
                issued by AGM/Project
                Manager      (EM     Works),
                Rampur       HPS,      Bayal
                against Pkg-36(II)/2020-
                21, the RAMPUR HPS
                units along with 420 KV
                Gas Insulated Switchgear
                have been commissioned
                between 19.03.2014 to
                04.12.2014.        As      per
                Performance       certificate,
                after completing the 420
                kV       Gas       Insulated
                Switchyard and other
                Associated work of HPS,
                Unit-1 Generating Set was
                put      on      commercial
                operation                from
                19.03.2014.
                (ii) But now as per the
                Performance        certificate
                submitted       for       Pkg-
                49/2021-22,                the
                commissioning date is
                27.10.2015       for    same
                RAMPUR HPS
                From point (i) & (ii) above,
                it is not clear how the
                same 420 KV switchyard
                can be commissioned in
                two different dates.
                Again the performance
                certificate    issued       on
                22.12.2021 by SJVN Ltd.
                Is for 400 KV Switchyard.
                However as per Tender
                condition you have to
                submit the credentials for
                2 nos. of 400 KV GIS s/s
                with minimum 3 nos.
                bays in each S/S on
                turnkey basis.
                Please justify the above
                                  // 34 //




                                      along with evidentiary
                                      documents.       Otherwise
                                      submit
                                      credentials/documents
                                      evidence in support of
                                      turnkey project executed.




8.3       In reply to the above query, M/s BHEL-opposite

party   no.4       submitted     under      Annexure-G/1        dated

05.03.2022 as follows:-

                    (Page 201 & 202 of the brief)

          Part-i

The complete Order copy of Contract Agreement & NOA has been submitted along with our hid (the same is being enclosed again as Annexure-IA). As desired BOQ/BBU for 400 kV GIS Switchyard at Rampur HEP is being enclosed as Annexure-IB.

It is Submitted that, as per OPTCL Tender specification (Qualification criteria for EPC Bidder for GIS project as per clause 4.1.1 of ITB of tender specification), following is the requirement: -

"The bidder, as a Principal Contractor must have successfully executed and Engineering, Design. Erection and Commissioning of:

i. Two nos. of 400kV or higher class GIS (SF6) Grid sub-station (with minimum three bays in each S/S on Turnkey contract"

It is evident from the above that "Engineering, Design, Erection and Commissioning" is the pre-requisite requirement as per tender definition.

In line with above requirement, BHEL had submitted following performance certificates issued by M/S GSECL and M/S SJVN (The same was also submitted // 35 //

along with our original techno-commercial bid and attached as Annexure-2 with this letter)

a. M/s GSECL for 400 kV GIS Switchyard at 1x800 MW Wanakbori TPS (comprising of 7 nos. of 400 kV GIS bays)

b. M/s SJVN for 400 kV GIS Switchyard at 412 MW Rampur HEP (comprising of 12 nos. of 400 kV GIS bays)

The performance certificate clearly states that the project scope included "Engineering, Design, Erection and Commissioning" in line with OPTCL tender specification requirement.

With the above, BHEL meets the specific tender Qualification Requirement of OPTCL.

Part-ii (Para-1)

Performance certificate issued by M/s SJVN (a Mini Ratna, Category-I and Schedule-'A' CPSE under administrative control of Ministry of Power, Govt. of India) on 22.12.2021 is specifically for the 400 kV GLS Switchyard portion for complete Rampur HEP (412 MW) E&M package which was successfully commissioned by BHEL as an EPC contractor (400 KV GIS scope as complete system) and taken over by M/s SJVN Ltd. on 27.10.2015.

Performance certificate, as is being referred to by OPTCL (submitted by BHEL, for package-36(II)/2021) was issued by M/s SJVN for Generating units (related to Power Plant scope for the E&M package).

Since OPTCL had raised post bid query/objection on bid submitted by BHEL for package-36(II)/2021 regarding the language used in the said performance certificate ("for the purpose of Hydro tenders"), a 400KV GIS scope specific certificate (for better clarity) was requested to M/s SJVN and the same was duly issued by M/s SJVN on 22.12.2021 clearly certifying BHEL's credentials for 400 kV GIS EPC scope.

Part-ii (Para-2 and 3) // 36 //

Regarding "Turnkey" word mentioned in the said paras, please refer to the constituent scopes as defined in the said term "Turnkey" as per OPTCL tender QR vide clause 4.1.1 of ITB of tender specification, which explicitly stipulates that

"The bidder, as a Principal Contractor must have successfully executed and Engineering, Design, Erection and Commissioning of

i. Two nos. of 400kV or higher class GIS (SF6) Grid sub-station (with minimum three bays in each S/S on Turnkey contract"

It is evident from above that "Engineering, Design, Erection and Commissioning" is the pre-requisite requirement as per tender definition for a turnkey contract.

As per above requirement, BHEL had duty submitted the performance certificates (Rampur and Wanakbori), wherein, both the certificates clearly states that the project scope included "Engineering, Design, Erection and Commissioning"

Hence it is submitted that BHEL fully meets the OPTCL QR as far as the "turnkey" scope deis concerned. Please note that the QR does not include "civil works" categorically as QR requirement."

Thus, the query, which was made by the OPTCL vide letter

dated 03.03.2022 in Annexure-F/1, was replied by M/s.

BHEL on 05.03.2022, i.e. within seven days period

contending that it satisfies the requirement.

8.4 Again a query was made, with regard to

confirmation of satisfactory work completion from Rampur

HPS, by the OPTCL vide letter under Annexure-H/1. In // 37 //

response to the same, clarification was also received on

05.03.2022 through e-mail to the following effect.

(Page-209 of the brief)

"OPTCL Query 1 : Regarding issuance of both the performance certificates.

Draft Reply: It is confirmed that both the certificates are issued by SJVN.

A Performance Certificate dated 07.08.2017 was issued on BHEL's request (For Unit 1 &6) as credentials for participation in future Hydroelectric project tenders (Power Plant Scope).

A Performance Certificate dated 22.12.2021 was issued on BHEL's request as credentials for 400 kV GIS Switchyard Scope (Part of complete Rampur Hydroelectric Project Package including addition Bay for Reactor) for participation in all future GIS project tenders.

OPTCL Query 2: Whether both 1st & 2nd contract executed by M/s BHEL has been awarded under turnkey contract basis for 400 kV GIS Substation.

Draft Reply: The contract for Rampur Hydro Electric Project was awarded to M/s BHEL covering Engineering, Design, Supply, Storage, Erection, Testing and Commissioning scopes lying with M/s BHEL (including 400 KV GIS Switchyard scope)."

8.5 The petitioner vehemently contended that the

performance certificate, which was produced by M/s BHEL-

opposite party no.4, does not meet the requirement of the

NIT. Therefore, it would be just and proper to refer to the

performance certificate issued by SJVN Ltd, a joint venture // 38 //

of Government of India & Government of Himachal Pradesh

indicating therein that the opposite party no.4 has

discharged its responsibility for Rampur Hydro Power

Station (412 MW). The performance certificate dated

22.12.2021, which has been annexed as Annexure-10 reads

as follows:-

(Page-119 of the brief) To Whomsoever it may concern Performance Certificate "This is to certify that M/s. Bharat Heavy Electricals Limited (BHEL) has been awarded the contract by M/s SJVN Ltd. (Formerly Satluj Jal Vidyut Nigam Limited) for E&M works of Rampur HEP (412 MW) including scope of 400 kV GIS Switchyard vide Contract Ref: SJVN/ECD/RHEP/ EM (Pkg-I) 1st contract. 08-1 & 2nd Contract/08-2 dated 16.10.2008.

The Scope of Switchyard includes complete design, engineering, supply, inland transportation, insurance, delivery, handling, storage, erection, testing and commissioning of all equipment required for 400 KV GIS Switchyard.

400kV GIS Switchyard Configuration as below: Scheme-Two Main Bus Bar Scheme Total Bays- 12 Nos CB bays with following feeders:

1. 400 kV Line Bays-4 Nos.

2. 400 kV Generator Transformer Bay-6 Nos.

3. 400 kV Bus Reactor Bay-1 No.

4. 400 kV Bus Coupler Bay-1 No.

Following BHEL make equipments were also supplied including complete design, engineering, manufacturing, inland transportation, insurance, delivery, handling, storage, erection, testing and commissioning) as part the scope of 400 kV GIS Switchyard.

1. 1 no. 80 MVAR, 420 Bus Reactor.

                               // 39 //




          2.    12    nos.  400    kV   Capacitive Voltage
          Transformers.

3. Control, Protection & Relay Panels with Switchyard SCADA.

4. Porcelain Disc Insulators and associated hardware.

The above 400 kV GIS Switchyard was successfully commissioned by M/s BHEL w.e.f 27.10.2015.

The 400 kV GIS Switchyard including all equipment has been operating satisfactorily since then.

This certificate is being issued to M/s BHEL on their request vide letter No. Ref: TBMS/21/PC/400KV Swyd Rampur Dated:20.12.2021, to enable them participate in forthcoming/future tenders."

On perusal of the above mentioned performance certificate,

it is made clear that the scope of Switchyard includes

complete design, engineering, supply, inland transportation,

insurance, delivery, handling, storage, erection, testing and

commissioning of all equipment required for 400 KV GIS

Switchyard. Therefore, from the starting to finishing of work

called Turnkey Project and erection comes under civil work.

Therefore, M/s. BHEL-opposite party no.4 satisfies the

requirement of NIT.

8.6. The meaning of "ERECTION" if will be taken into

consideration, then "ERECTION," generally, is a wider term

than "BULDING" and may include trade FIXTURES.

// 40 //

"ERECTION" in relation to a building includes extension,

alteration or re-erection.

8.7. In H.E. Dibble Ltd. v. Moore, (1969) 3 All ER

1465, 1471 (CA), while considering Section 62 (1) of Law of

Property Act, 1925, the word 'erection' does not embrace

something that is not a part of the land, either as a fixture

or otherwise.

Erection, commissioning and installation" means

any service provided by commissioning an installation

agency in relation to erection, commissioning and

installation of plant, machinery or equipment.

In view of Section 65 and 39 (a) of the Finance

Act 32 of 1994, which has been inserted by Finance Act 23

of 2004 in Section 90.

Thereby, there is no iota of doubt that if the

meaning of erection will be taken into consideration, then it

includes a nature of work which will be done extension or

alteration or does not embrace something that is not a part

of the land, either as a fixture or otherwise.

// 41 //

Thereby, for the fixture or otherwise, it requires a

civil work. Thus, it cannot be construed that the opposite

party no.4 had no experience on turnkey contract.

8.8. Turnkey Project means a contract under which

the contractor assumes responsibility to the client for

constructing productive installation and ensuring that they

operate effectively before turning them over to the client.

8.9. In Understanding & Negotiating Turnkey and

EPC Contract, 2nd Ed. By Joseph A. Huse, the concept of

turnkey contracts has been discussed in detail and it has

been held as follows:

"The 'turnkey' arrangement (also known as the 'package deal', 'design and build', 'de-en-main', 'design and construct' or 'EPC' places the duty to design and construct solely on the contractor. There is no accepted definition for each of these terms in the construction field. The term 'turnkey' tends to mean the most extreme form of placing design and construction responsibility on the contractor, such that after completion the employer need only turn the key to commence operation of the constructed facility."

8.10 In Hudson's Building and Engineering

Contracts, 11th Ed., para 3.029 at p. 428, the essential

conditions of a turnkey contract are enumerated as under :

// 42 //

"Thus, in these contracts the essential feature is that the owner does not employ his own professional advisers to produce the design of the building or project which he requires. Either by negotiations or by outline specification to tendering contractors, the owner makes known his requirements and the contractor then produces the design, in the form of drawings, a specification and sometimes schedules of rates to cover possible variations. Bills are not usually used in such contracts, which will almost invariably be lump 'sum, since clearly there would be unacceptable pricing risks for an owner if bills were to be prepared by a contractor for use in a measured contract....."

8.11 In FIDIC- An analysis of International

Construction Contracts (Edited by Robert Knutson, p.

127-28, it has been stated :

"In India the concept of Turnkey is understood in the same way as it is in most of the other countries. Generally speaking, it relates to that aspect of Construction Con-tracts where the contractor takes 'complete responsibility' for an engineering project. Complete responsibility would include furnishing of all plant, labour materials, supplies, equipment transportation, super-vision, technical, professional and other services. The contractor is under an obligation to perform all operations relating to design, manufacture, delivery installation and the design and execution of building or engineering works as contracted. In the case of Turnkey Contract or a product-in-hand con-tract, the general description of a scope of construction may be contemplated by additional contractual provisions, obligating the contractor to effect all construction which, although not specifically described is nevertheless necessary or usual, having regard to the agreed operational capabilities of the works. Such a provision may avoid disputes as to who is to supply all items of material or perform minor items of construction either forgotten during the negotiation or not considered worthy or special mention. The mere use of the term Turnkey may not be sufficient to impose such an obligation on the contract."

// 43 //

8.12 In Black's Law Dictionary, Eighth Edition, page-

344 states as follows:-

Engineering, procurement and construction contract. A fixed-price, schedule-intensive construction contract-typically used in the construction of single- purpose projects, such as energy plants- in which the contractor agrees to with variety of responsibilities, including the duties to provide for the design, engineering, procurement and construction of the facility, to prepare start up procedures; to conduct performance tests; to create operating manuals; and to train people to operate the facility-Abbr. EPC contract- Also termed turnkey contract."

8.13. Therefore, Turnkey Project in which the

ownership is originally transferred from original

builder/proprietor only after ensuring that everything is

"turn on" and running properly.

8.14 In Indure Ltd. (supra), the apex Court at

paragraph-3 observed as follows.

"Tenders were invited by N.T.P.C on 08.01.1988 for submitting bids for Ash Handling Plant Package for its Farakka Super Thermal Power Project, Stage-II, by way of International Competitive Bidding, popularly known as Global Tender. The scope of work involved in such package included designing and engineering, manufacture, inspection and testing at suppliers works, packing, transportation to site, unloading, storage and handling at site, erection, testing and commissioning of complete Ash Handling Plant for 2 x 500 MW Steam Generating Units (for short 'the plant'). Such type of works contract is known as 'On C.A. No. 1123 of 2003 Turnkey Basis'. Bids made by bidders were to // 44 //

cover whole of the work as abovementioned. Bid made by any person not covering the entire scope of work was liable to be treated as incomplete and could be rejected on that ground only. The bidder was required to quote a lump sum price in its proposal for the entire scope of work covered under the bid documents. It further required that bidders shall indicate the bid price in their home currency or in US dollars."

8.15. In Director of Income Tax-II (supra), the apex

Court at paragraph-2 observed as follows:

"On 28.02.2006, the Oil and Natural Gas Company ("ONGC") awarded a "turnkey" contract to a consortium comprising of the Respondent/Assessee, i.e. Samsung Heavy Industries Co. Ltd. (a Company incorporated in South Korea), and Larsen & Toubro Limited, being a contract for carrying out the "Work", inter alia, of surveys, design, engineering, procurement, fabrication, installation and modification at existing facilities, and start-up and commissioning of entire facilities covered under the 'Vasai East Development Project' ("Project").

8.16 Therefore, on the basis of the performance

certificate issued by SJVN Ltd. in favour of M/s. BHEL-

opposite party no.4 and taking into consideration the red

herring prospectus, there is no iota of doubt that opposite

party no.4-M/s. BHEL has got the experience in executing a

contract on turnkey basis. Therefore, the objection so raised

by the petitioner cannot sustain in the eye of law.

8.17 In the proceeding dated 22.03.2022, the PSC of

the OPTCL recommended five bids as being techno-

// 45 //

commercially compliant and the committee recommended

for opening of the price bids. On 30.03.2022, the price bid

for the NIT bearing CPC-49/2021-22 was opened. Fifty

percent of the responsive bidders, i.e., minimum three were

allowed to participate in the e-Reverse Auction held

thereafter, on 07.04.2022. The details of the price after the

e-Reverse Auction are as under:-

(Page 146 of the Brief)

Details of Price after e-RA.

Name of Initial Evaluated Price after e- Tendered % the Bidder Price including Reverse Auction estimated cost deviation GST (Price in INR) including GST (including GST) after e-

(Price in INR) (Price in INR) Reverse Auction.

(i)   M/s. 2,10,45,41,526.70 2,09,82,28,002.70 2,00,31,49,600.00                  (+) 4.75
Bharat                                                                            (L1)
Heavy
Electrical
Ltd
(ii)  M/s. 2,21,52,65,754.72 2,10,13,84,814.70 2,00,31,49,600.00 (+)           4.9
L&T Ltd.                                                                 (L2)
(iii) M/s. 2,14,66,82,726.56                        2,00,31,49,600.00 +       7.17
Siemens                                                                  (L3)
Ltd.    JV
with A.K.
Das
Associates
Ltd.

The above price as per bidding condition is inclusive of all taxes & duties under Works Contract @ 18% GST.

8.18 The petitioner, along with its lead partner M/s

Seimens Ltd., was given opportunity to make the lowest bid

by lowering their quoted price, but they did not do so.

// 46 //

8.19. Taking into consideration the aforesaid e-Reverse

Auction, the PSC of OPTCL on 27.06.2022 recommended for

issuance of LoA in favour of M/s. BHEL-opposite party no.4

vide Annexure-L/1, basing upon which the Board of

Directors on 16.07.2022 approved the proposal for award of

LoA in favour of M/s. BHEL-opposite party no.4 on turnkey

contract basis as recommended by the PSC. Since the

order value of the project was more than Rs.100 crore,

necessary approval of the State Government was sought for.

8.20 In view of the aforesaid provision, it is made clear

that M/s. BHEL-opposite party no.4 satisfies the

requirement of Clause-4.1.1 of the NIT. Thereby, the

objection so raised by the petitioner cannot have any

substance. As a result, the writ petition cannot sustain.

Issue No.1 is accordingly answered against the petitioner.

9. Issue No. 2.

It is evident that after the evaluation of the

techno commercial bid, the petitioner and M/s. BHEL-

opposite party no.4 were qualified along with three others.

The PSC in its proceeding dated 22.03.2022 had // 47 //

recommended for opening of the price bids and accordingly

the price bid was opened on 30.03.2022. Out of the 50% of

the responsive bidders, minimum three were allowed to

participate in the e-Reverse Auction held on 07.04.2022.

But neither the petitioner nor his lead partner M/s Seimens

Ltd., even after affording opportunity to them to make the

lowest bid by lowering their quoted price, does so. In view of

the table quoted in the foregoing paragraphs it is made clear

that since the petitioner and his lead partner M/s Seimens

Ltd. did not participate in the e-Reverse Auction, it has no

locus to challenge the same by filing the present writ

petition. As such, at the behest of the petitioner, the writ

petition cannot sustain.

9.1 In National Highways Authority (supra), the

apex Court at paragraph-20 of the judgment held as

follows:-

"While considering the relief claimed by the respondent (claimant), the same should have been tested on the touchstone of the principle governing the tender process, especially when the validity of the tender document has not been put in issue or challenged before any competent forum. Going by the terms and conditions in the tender documents, as already alluded to in paragraph 8 above, there is no tittle of doubt that the right of the claimant (respondent) to match the bid of L-1 or to exercise // 48 //

ROFR would come into play only if the respondent was to participate in the tender process pursuant to the notice inviting tenders from the interested parties. The objective of tender process is not only to adhere to a transparent mechanism but to encourage competition and give equal opportunity to all tenderers with the end result of getting a fair offer or value for money. The plain wording of the eligibility clause in the tender documents and the incidental stipulations make it explicit that the respondent was required to participate in the tender process by submitting its sealed bid (technical and financial). The fact that a deeming clause has been provided in the tender document that if the respondent was to participate in the bidding process, it shall be deemed to fulfill all the requirements of the tender clauses 3 to 6 of the RFP, being the existing concessionaire of the Project, does not exempt the respondent from participating in the tender process; rather the tenor of the terms of the documents made it obligatory for the respondent to participate in the tender process to be considered as a responsive bidder, along with others. Having failed to participate in the tender process and, more so, despite the express terms in the tender documents, validity whereof has not been challenged, the respondent cannot be heard to contend that it had acquired any right whatsoever."

9.2 In the judgment rendered in the case of Pratap

Chandra Sahu (supra), of which one of us (Dr. Justice B.R.

Sarangi) was the author, this Court held that if the

petitioner does not choose to participate in the same, at his

behest, the benefit sought cannot be extended and no

direction can be issued for cancellation of such E-Tender

issued by opposite party no.3 in Annexure-2.

// 49 //

9.3 Therefore, this Court unhesitatingly comes to a

conclusion that the petitioner has no locus to assail the

settlement of contract in favour of opposite party no.4.

9.4 In Patel Engineering (supra), the apex Court at

paragraph-25 of the judgment observed as follows:-

"The controversy in this case has arisen at the threshold. It cannot be disputed that this is an international competitive bidding which postulates keen competition and high efficiency. The bidders have or should have assistance of technical experts. The degree of care required in such a bidding is greater than in ordinary local bids for small works. It is essential to maintain the sanctity and integrity of process of tender/bid and also award of a contract. The appellant, respondent Nos.1 to 4 and respondent Nos.10 & 11 are all bound by the ITB which should be complied with scrupulously. In a work of this nature and magnitude where bidders who fulfill pre- qualification alone are invited to bid, adherence to the instructions cannot be given a go-bye by branding it as a pedantic approach otherwise it will encourage and provide scope for discrimination, arbitrariness and favoritism which are totally opposed to the Rule of law and our Constitutional values."

On the basis of the facts and law, as discussed above, this

Court has already come to a conclusion that the selection of

M/s. BHEL-opposite party no.4 is in consonance with the

Clause-4.1.1 of the NIT. Therefore, the ratio decided in the

case of Patel Engineering (supra) has no application to the

present context.

// 50 //

9.5 Similarly, in Kanhaiya Lal Agrawal (supra) at

paragraph-5 of the judgment, the apex Court observed that

the Court is normally reluctant to intervene in matters of

entering into contracts by the Government, but if the same

is found to be unreasonable, arbitrary, mala fide or is in

disregard of mandatory procedures, the Court will not

hesitate to nullify or rectify such actions. It is the settled

law that when an essential condition of tender is not

complied with, it is open to the person inviting tender to

reject the same. Whether a condition is essential or

collateral could be ascertained by reference to consequence

of non-compliance thereto. If non-fulfillment of the

requirement results in rejection of the tender, then it would

be essential part of the tender otherwise it is only a

collateral term. This legal position has been well explained

in G.J.Fernandez vs. State of Karnataka & Ors., 1990(2)

SCC 488. Even if this contention is taken into

consideration, as urged by the learned Senior Counsel

appearing for the petitioner, by applying the above ratio to

the present context the same cannot justify to nullify the // 51 //

contract awarded in favour of M/s. BHEL-opposite party

no.4.

9.6 In Poddar Steel (supra), the ratio decided in the

case of G.J. Fernadez (supra) has also been taken note of.

Since this Court has already held against the petitioner, the

judgment so cited by learned Senior Counsel for the

petitioner does not have any application to the present

context.

9.7 In Uflex Limited (supra), the judgment cited by

learned Senior Counsel appearing for opposite party no.1,

the apex Court referring to Jagdish Mandal v. State of

Orissa, (2007) 14 SCC 517 at paragraph-2 of the judgment

observed as follows:-

"The judicial review of such contractual matters has its own limitations. It is in this context of judicial review of administrative actions that this Court has opined that it is intended to prevent arbitrariness, irrationality, unreasonableness, bias and mala fide. The purpose is to check whether the choice of decision is made lawfully and not to check whether the choice of decision is sound. In evaluating tenders and awarding contracts, the parties are to be governed by principles of commercial prudence. To that extent, principles of equity and natural justice have to stay at a distance."

// 52 //

Further, referring to Tata Cellular v Union of India,

(1994) 6 SCC 651, the apex Court came to a conclusion at

paragraph-42 to the following effect:-

"We must begin by noticing that we are examining the case, as already stated above, on the parameters discussed at the inception. In commercial tender matters there is obviously an aspect of commercial competitiveness. For every succeeding party who gets a tender there may be a couple or more parties who are not awarded the tender as there can be only one L-1. The question is should the judicial process be resorted to for downplaying the freedom which a tendering party has, merely because it is a State or a public authority, making the said process even [36] more cumbersome. We have already noted that element of transparency is always required in such tenders because of the nature of economic activity carried on by the State, but the contours under which they are to be examined are restricted as set out in Tata Cellular26 and other cases. The objective is not to make the Court an appellate authority for scrutinizing as to whom the tender should be awarded. Economics must be permitted to play its role for which the tendering authority knows best as to what is suited in terms of technology and price for them."

9.8 In Utkal Suppliers (supra), the judgment of

which was authored by one of us (Dr. Justice B.R. Sarangi),

at paragraph-21 of the said judgment it was observed as

follows:-

"Coming to the power of judicial review in the matters relating to tenders or award of contracts, it is to be borne in mind some special features. A contract is a commercial transaction. Evaluating tenders and awarding contracts are essentially // 53 //

commercial functions. Principles of equity and natural justice stay at a distance. If the decision relating to award of contract is bona fide and is in public interest, courts will not, in exercise of power of judicial review, interfere even if a procedural aberration or error in assessment or prejudice to a tenderer, is made out. The power of judicial review will not be permitted to be invoked to protect private interest at the cost of public interest, or to decide contractual disputes. The tenderer or contractor with a grievance can always seek damages in a civil Court. Attempts by unsuccessful tenderers with imaginary grievances, wounded pride and business rivalry, to make mountains, out of molehills of some technical/procedural violation or some prejudice to self, and persuade courts to interfere by exercising power of 36 judicial review, should be resisted. Such interferences either interim or final, may hold up public works for years, or delay relief of succour to thousand and millions and may increase the project cost manifold. Therefore, a Court before interfering in tender or contractual matters in exercise of power of judicial review may very cautious and as such, the scope of judicial review to award of contract has been considered by the apex Court in various judgments."

9.9 Therefore, while exercising power of judicial

review, the apex court has already set up the principle,

which has been taken note of in Sterling Computers Ltd.

v. M & N Publications Ltd. (1993) 1 SCC 445; Raunaq

International Ltd. v. I.V.R. Construction Ltd. (1999) 1

SCC 492; Air India Ltd. v. Cochin International Airport

Ltd. (2000) 2 SCC 617; Assn. of Registration Plates v.

Union of India (2005) 1 SCC 679; B.S.N. Joshi & Sons

Ltd. v. Nair Coal Services Ltd. (2006) 11 SCC 548 : (2006) // 54 //

11 Scale 526; Michigan Rubber (India) Limited v. State

of Karnataka, (2012) 8 SCC 216; Maa Binda Express

Carrier v. North East Frontier Railway, (2014) 3 SCC

760.

9.10 In Gammon India Limited (supra), referring to

paragraphs- 28, 30 and 31, it was observed by the apex

Court that New Horizons Ltd v. Union of India, (1995) 1

SCC 478, recognizes a joint venture to be a legal entity in

the nature of a partnership of the constituent companies.

The partnership concept in relation to a joint venture is to

be accepted then the joint venture could be treated as a

`legal entity', with the character of a partnership.

9.11 In Consortium of Thermopads (supra), the apex

Court at paragraph-14 of the judgment observed as

follows:-

"14. In view, (Me principles of law laid down by the apex Court, as discussed above, it is made clear that the apex Court has time and again put restriction with regard to the interpretation given to the conditions of tender document and, as such, it has been held that unless there is mala fide or perversity in the understanding or appreciation or the application of terms and conditions of the tender documents, constitutional Courts should not interfere with the interpretation given to such tender documents. The apex Court has given a caution with // 55 //

regard to exercise of the power of judicial review and laid down the law stating that exercise of power of judicial review would be called for if the approach is arbitrary or mala fide or-procedure adopted is meant to favour one. The decision making process should clearly show that the said maladies are kept at bay. But where a decision is taken by the Tendering Authority, which is manifestly in consonance with the language of the tender document or sub-serves the purpose for which the tender is floated, the Court should follow the principle of restraint. More so, the Tendering Authority, who is the author of the tender document, is competent person to interpret the conditions of the tender document and, as such the Constitutional Court should not interfere with the interpretation given by the Tendering Authority.

Thus, this Court is of the firm opinion that the power of

judicial review being limited one, so far as tender matters

are concerned, in exercise of the same to the present facts,

the writ petition is not maintainable at the instance of the

present petitioner.

9.12 In view of the foregoing discussions, the

petitioner has no locus to file the writ petition and at his

behest the writ petition is not maintainable. Accordingly

issue no.2 is answered against the petitioner.

10. Issue No.3.

In view of the foregoing discussions, it is made

clear that the petitioner having forgone his right by not

participating in e-Reverse Auction, at his behest the writ // 56 //

petition cannot sustain. Apart from that, the petitioner is

not the person aggrieved so as to approach this Court in

exercise of extraordinary jurisdiction under Article 226 of

the Constitution of India. Consequentially, this issue is also

answered against the petitioner.

11. On the basis of the facts and law, as discussed

above, since all the issues have been answered against the

petitioner, this Court is of the considered view that the writ

petition merits no consideration and the same stands

dismissed. However, there shall be no order as to costs.

(DR. B.R. SARANGI) JUDGE

B.P. SATAPATHY. I agree.

(B.P. SATAPATHY) JUDGE

Orissa High Court, Cuttack The 2nd December, 2022, Arun/GDS

 
Download the LatestLaws.com Mobile App
 
 
Latestlaws Newsletter
 

Publish Your Article

 

Campus Ambassador

 

Media Partner

 

Campus Buzz

 

LatestLaws Guest Court Correspondent

LatestLaws Guest Court Correspondent Apply Now!
 

LatestLaws.com presents: Lexidem Offline Internship Program, 2026

 

LatestLaws.com presents 'Lexidem Online Internship, 2026', Apply Now!

 
 

LatestLaws Partner Event : IJJ

 

LatestLaws Partner Event : Smt. Nirmala Devi Bam Memorial International Moot Court Competition

 
 
Latestlaws Newsletter