C/SCA/13747/2021                           CAV ORDER DATED: 15/09/2022




   IN THE HIGH COURT OF GUJARAT AT AHMEDABAD

          R/SPECIAL CIVIL APPLICATION NO. 13747 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13748 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13749 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13750 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13751 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13752 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13753 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13754 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13755 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13756 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13757 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13758 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13759 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13761 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13762 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13764 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13765 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13766 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13767 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13768 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13769 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13770 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13771 of 2021


                            Page 1 of 86

                                                Downloaded on : Thu Sep 15 22:01:40 IST 2022
 C/SCA/13747/2021                           CAV ORDER DATED: 15/09/2022




                              With
          R/SPECIAL CIVIL APPLICATION NO. 13772 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13773 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13774 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13775 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13776 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13777 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13778 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13779 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13780 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13781 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13782 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13783 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13784 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13785 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13786 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13787 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13788 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13789 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13790 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13791 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13792 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13793 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13794 of 2021
                              With



                            Page 2 of 86

                                                Downloaded on : Thu Sep 15 22:01:40 IST 2022
 C/SCA/13747/2021                            CAV ORDER DATED: 15/09/2022




          R/SPECIAL CIVIL APPLICATION NO. 13795 of 2021
                               With
          R/SPECIAL CIVIL APPLICATION NO. 13796 of 2021
                               With
          R/SPECIAL CIVIL APPLICATION NO. 13797 of 2021
                               With
          R/SPECIAL CIVIL APPLICATION NO. 13798 of 2021
                               With
          R/SPECIAL CIVIL APPLICATION NO. 13799 of 2021
                               With
          R/SPECIAL CIVIL APPLICATION NO. 13800 of 2021
                               With
          R/SPECIAL CIVIL APPLICATION NO. 13801 of 2021
                               With
          R/SPECIAL CIVIL APPLICATION NO. 13802 of 2021
                               With
          R/SPECIAL CIVIL APPLICATION NO. 13803 of 2021
                               With
         CIVIL APPLICATION (FOR DIRECTION) NO. 1 of 2022
         In R/SPECIAL CIVIL APPLICATION NO. 13803 of 2021
                               With
          CIVIL APPLICATION (FOR ORDERS) NO. 2 of 2022
         In R/SPECIAL CIVIL APPLICATION NO. 13803 of 2021
                               With
          R/SPECIAL CIVIL APPLICATION NO. 13804 of 2021
                               With
          R/SPECIAL CIVIL APPLICATION NO. 13805 of 2021
                               With
          R/SPECIAL CIVIL APPLICATION NO. 13806 of 2021
                               With
          R/SPECIAL CIVIL APPLICATION NO. 13807 of 2021
                               With
          R/SPECIAL CIVIL APPLICATION NO. 13808 of 2021
                               With
          R/SPECIAL CIVIL APPLICATION NO. 13810 of 2021
                               With
          R/SPECIAL CIVIL APPLICATION NO. 13816 of 2021
                               With
          R/SPECIAL CIVIL APPLICATION NO. 13817 of 2021
                               With
          R/SPECIAL CIVIL APPLICATION NO. 13818 of 2021
                               With
          R/SPECIAL CIVIL APPLICATION NO. 13819 of 2021
                               With
          R/SPECIAL CIVIL APPLICATION NO. 13820 of 2021
                               With
          R/SPECIAL CIVIL APPLICATION NO. 13821 of 2021



                             Page 3 of 86

                                                 Downloaded on : Thu Sep 15 22:01:40 IST 2022
 C/SCA/13747/2021                           CAV ORDER DATED: 15/09/2022




                              With
          R/SPECIAL CIVIL APPLICATION NO. 13822 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13823 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13824 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13825 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13826 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13827 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13828 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13829 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13830 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13831 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13833 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13834 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13835 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13836 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13837 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13838 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13839 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13840 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13841 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13842 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13843 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13844 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13845 of 2021
                              With



                            Page 4 of 86

                                                Downloaded on : Thu Sep 15 22:01:40 IST 2022
 C/SCA/13747/2021                           CAV ORDER DATED: 15/09/2022




          R/SPECIAL CIVIL APPLICATION NO. 13846 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13847 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13848 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13849 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13850 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13851 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13852 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13853 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13854 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13856 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13857 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13858 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13859 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13860 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13861 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13862 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13863 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13864 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13865 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13866 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13867 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13868 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13869 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13870 of 2021



                            Page 5 of 86

                                                Downloaded on : Thu Sep 15 22:01:40 IST 2022
 C/SCA/13747/2021                          CAV ORDER DATED: 15/09/2022




                              With
         R/SPECIAL CIVIL APPLICATION NO. 13871 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13872 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13873 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13874 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13875 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13876 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13877 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13879 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13880 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13881 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13882 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13883 of 2021
                              With
     CIVIL APPLICATION (FOR BRINGING HEIRS) NO. 1 of 2022
        In R/SPECIAL CIVIL APPLICATION NO. 13883 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13884 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13885 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13887 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13888 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13889 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13890 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13891 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13892 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13893 of 2021
                              With
         R/SPECIAL CIVIL APPLICATION NO. 13894 of 2021



                           Page 6 of 86

                                               Downloaded on : Thu Sep 15 22:01:40 IST 2022
 C/SCA/13747/2021                           CAV ORDER DATED: 15/09/2022




                              With
          R/SPECIAL CIVIL APPLICATION NO. 13895 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13896 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13897 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13899 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13900 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13901 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13902 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13903 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13904 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13905 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13906 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13907 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13908 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13909 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13910 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13911 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13912 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13913 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13914 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13915 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13916 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13917 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13918 of 2021
                              With



                            Page 7 of 86

                                                Downloaded on : Thu Sep 15 22:01:40 IST 2022
 C/SCA/13747/2021                           CAV ORDER DATED: 15/09/2022




          R/SPECIAL CIVIL APPLICATION NO. 13919 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13920 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13921 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13922 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13923 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13924 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13925 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13926 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13927 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13928 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13929 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13930 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13931 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13932 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13933 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13934 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13935 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13936 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13937 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13938 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13939 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13940 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13941 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13942 of 2021



                            Page 8 of 86

                                                Downloaded on : Thu Sep 15 22:01:40 IST 2022
 C/SCA/13747/2021                           CAV ORDER DATED: 15/09/2022




                              With
          R/SPECIAL CIVIL APPLICATION NO. 13943 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13944 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13945 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13946 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13947 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13948 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13949 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13950 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13951 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13952 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13953 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13954 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13955 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13956 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13957 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13958 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13959 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13960 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13961 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13962 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13963 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13964 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13965 of 2021
                              With



                            Page 9 of 86

                                                Downloaded on : Thu Sep 15 22:01:40 IST 2022
 C/SCA/13747/2021                            CAV ORDER DATED: 15/09/2022




          R/SPECIAL CIVIL APPLICATION NO. 13966 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13967 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13968 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13969 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13970 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13971 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13972 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13974 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13975 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13976 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13977 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13978 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13979 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13980 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13981 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13982 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13983 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13984 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13985 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13986 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13987 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13988 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13989 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13990 of 2021



                            Page 10 of 86

                                                 Downloaded on : Thu Sep 15 22:01:40 IST 2022
 C/SCA/13747/2021                            CAV ORDER DATED: 15/09/2022




                              With
          R/SPECIAL CIVIL APPLICATION NO. 13991 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13992 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13993 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13994 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13995 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13996 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13997 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13998 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 13999 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14000 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14001 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14002 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14003 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14004 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14005 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14006 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14007 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14008 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14009 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14010 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14011 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14012 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14013 of 2021
                              With



                            Page 11 of 86

                                                 Downloaded on : Thu Sep 15 22:01:40 IST 2022
 C/SCA/13747/2021                            CAV ORDER DATED: 15/09/2022




          R/SPECIAL CIVIL APPLICATION NO. 14014 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14015 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14016 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14017 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14018 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14019 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14020 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14021 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14022 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14023 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14024 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14025 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14026 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14027 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14028 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14029 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14030 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14031 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14032 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14033 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14034 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14035 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14036 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14037 of 2021



                            Page 12 of 86

                                                 Downloaded on : Thu Sep 15 22:01:40 IST 2022
 C/SCA/13747/2021                            CAV ORDER DATED: 15/09/2022




                              With
          R/SPECIAL CIVIL APPLICATION NO. 14038 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14039 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14040 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14041 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14042 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14043 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14044 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14045 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14046 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14047 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14048 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14049 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14050 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14051 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14052 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14053 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14054 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14055 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14056 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14057 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14058 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14059 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14060 of 2021
                              With



                            Page 13 of 86

                                                 Downloaded on : Thu Sep 15 22:01:40 IST 2022
 C/SCA/13747/2021                            CAV ORDER DATED: 15/09/2022




          R/SPECIAL CIVIL APPLICATION NO. 14061 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14062 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14063 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14064 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14065 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14066 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14067 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14068 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14069 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14070 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14071 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14072 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14073 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14074 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14075 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14076 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14077 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14078 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14079 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14080 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14081 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14082 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14083 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14084 of 2021



                            Page 14 of 86

                                                 Downloaded on : Thu Sep 15 22:01:40 IST 2022
 C/SCA/13747/2021                            CAV ORDER DATED: 15/09/2022




                              With
          R/SPECIAL CIVIL APPLICATION NO. 14086 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14087 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14088 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14089 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14090 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14091 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14092 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14093 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14094 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14095 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14096 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14097 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14098 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14099 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14100 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14101 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14102 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14103 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14104 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14105 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14106 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14107 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14108 of 2021
                              With



                            Page 15 of 86

                                                 Downloaded on : Thu Sep 15 22:01:40 IST 2022
 C/SCA/13747/2021                            CAV ORDER DATED: 15/09/2022




          R/SPECIAL CIVIL APPLICATION NO. 14109 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14110 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14111 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14112 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14113 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14114 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14115 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14116 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14117 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14118 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14119 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14120 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14121 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14122 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14123 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14124 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14125 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14126 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14127 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14128 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14129 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14130 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14131 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14132 of 2021



                            Page 16 of 86

                                                 Downloaded on : Thu Sep 15 22:01:40 IST 2022
 C/SCA/13747/2021                            CAV ORDER DATED: 15/09/2022




                              With
          R/SPECIAL CIVIL APPLICATION NO. 14133 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14134 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14135 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14136 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14137 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14138 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14139 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14140 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14141 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14142 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14143 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14144 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14145 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14146 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14147 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14148 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14149 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14150 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14151 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14152 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14153 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14154 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14155 of 2021
                              With



                            Page 17 of 86

                                                 Downloaded on : Thu Sep 15 22:01:40 IST 2022
 C/SCA/13747/2021                            CAV ORDER DATED: 15/09/2022




          R/SPECIAL CIVIL APPLICATION NO. 14156 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14157 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14159 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14160 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14161 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14163 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14164 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14165 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14166 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14167 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14168 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14169 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14170 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14171 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14172 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14173 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14174 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14176 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14177 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14178 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14179 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14180 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14181 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14182 of 2021



                            Page 18 of 86

                                                 Downloaded on : Thu Sep 15 22:01:40 IST 2022
 C/SCA/13747/2021                            CAV ORDER DATED: 15/09/2022




                              With
          R/SPECIAL CIVIL APPLICATION NO. 14183 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14184 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14185 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14186 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14188 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14189 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14190 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14191 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14193 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14194 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14195 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14199 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14201 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14203 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14205 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14207 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14209 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14211 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14212 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14213 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14214 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14220 of 2021
                              With
          R/SPECIAL CIVIL APPLICATION NO. 14222 of 2021
                              With



                            Page 19 of 86

                                                 Downloaded on : Thu Sep 15 22:01:40 IST 2022
   C/SCA/13747/2021                            CAV ORDER DATED: 15/09/2022




            R/SPECIAL CIVIL APPLICATION NO. 14223 of 2021
                                With
            R/SPECIAL CIVIL APPLICATION NO. 14224 of 2021
                                With
            R/SPECIAL CIVIL APPLICATION NO. 14225 of 2021
                                With
            R/SPECIAL CIVIL APPLICATION NO. 14228 of 2021
                                With
            R/SPECIAL CIVIL APPLICATION NO. 14229 of 2021
                                With
            R/SPECIAL CIVIL APPLICATION NO. 14230 of 2021
                                With
            R/SPECIAL CIVIL APPLICATION NO. 14231 of 2021
                                With
            R/SPECIAL CIVIL APPLICATION NO. 14233 of 2021

FOR APPROVAL AND SIGNATURE:

HONOURABLE MR. JUSTICE BIREN VAISHNAV
================================================================

1 Whether Reporters of Local Papers may be allowed to see the judgment ?

2 To be referred to the Reporter or not ?

3 Whether their Lordships wish to see the fair copy of the judgment ?

4 Whether this case involves a substantial question of law as to the interpretation of the Constitution of India or any order made thereunder ?

================================================================ GOHIL RAMESHBHAI AMARSINH Versus INDIAN PETROCHEMICALS CORPORATION LTD. ================================================================ Appearance:

MR.J P THAKKAR(7116) for the Petitioner(s) No. 1 MR K S NANAVATI, SR. COUNSEL assisted by Mr. PRATIK BHATIA for M/S. NANAVATI ASSOCIATES(1375) for the Respondent(s) No. 1

================================================================

CORAM:HONOURABLE MR. JUSTICE BIREN VAISHNAV

Date : 15/09/2022

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

COMMON CAV ORDER

1. Challenge in these petitions, under Articles 226 and

227 of the Constitution of India at the instance of the

employees is to the awards passed by the Labour Court,

Vadodara. The Labour Court rejected the References.

Briefly stated, it held that the workmen / employees had

withdrawn their applications for Voluntary Retirement

Scheme (for short `VRS') after they had been accepted and

also after the amounts under the Scheme were paid and

accepted by them.

2. Both parties to these petitions referred to the lead

matter being Special Civil Application No.13803 of 2021

and made their submissions.

The facts in brief are as under:

3.1. The Indian Petrochemicals Corporation Limited which

was originally owned and managed by the Central Government,

in the course of implementing the policy of disinvestment

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

diverted its share capital to Reliance Industries Limited which

became a major stake holder of the Company. The Company

promoted two schemes namely; the Voluntary Separation

Scheme (for short `VSS') and Special Separation Scheme (for

short `SSS') in order to downsize its staff. The scheme was

floated by a Circular dated 06.03.2007. Under the scheme,

regular employees of the Vadodara Complex were eligible to

apply which was in operation from 06.03.2007 to 20.03.2007. It

is the case of the petitioners that about 2400 employees applied

under the scheme. In the scheme, no period had been mentioned

providing an opportunity to an employee to withdraw himself

from the scheme. Under the threat of being transferred to either

Nagothane or its project at Jamnagar, the petitioners were

compelled to apply under the scheme, which they did on the last

date i.e. 20.03.2007 in the evening. According to the Statement

of Claim filed by the petitioners before the Labour Court, it was

their case that they were compelled to apply under coercion and

threat of transfer. Having so applied, on 20.03.2007, they orally

in the late evening of 20.03.2007 requested for withdrawal of

their Voluntary Retirement Applications. It is their case that the

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

Officer of the Company refused such request on the ground that

the data was already locked in their computer and

reconsideration / withdrawal was not possible.

3.2. It is the case of the petitioners that on 21.03.2007

they requested for withdrawal of their applications, however, an

endorsement was made on such letters that the competent

authority shall take a decision. According to the petitioners, in

the Statement of Claim so filed, letters dated 20.03.2007 were

posted on 26.03.2007 informing the petitioners of the

acceptance of their applications. It was a deceptive show that

the offer of the employees was accepted and that there was

concluded contract and, therefore, no withdrawal can be

permitted. The case of the petitioners was that despite letters in

June and August, 2007, no decision was taken and, therefore, the

action of the Company in accepting their applications be

declared as illegal and the petitioners be reinstated in service.

3.3. Briefly stated, the stand of the Company before the

Labour Court was that the VSS / SSS was open upto 20.03.2007.

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

19 employees who made applications for withdrawal on or before

20.03.2007 were considered by the Company and such

employees were allowed to withdraw their applications. The

present petitioners did not withdraw their applications before

acceptance. Moreover, they accepted all the benefits flowing

from the scheme and after receiving all the benefits raised an

industrial dispute. The Company highlighted the past history by

submitting that in the first round, the Assistant Commissioner of

Labour had refused to refer the dispute which was a subject

matter of challenge and ultimately the Division Bench directed

the authority to refer the dispute which was referred for

adjudication to the Labour Court.

3.4. The stand of the Company was that once having

accepted the amounts under the Scheme, it was not open for

them to turn around and claim benefits of reinstatement.

3.5. Oral and documentary evidences were led by the

respective parties. Based on legal contentions and such

evidence, the Labour Court rejected the References giving rise to

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

these petitions.

Brief summary of conclusions reached by the Labour

Court:

(i). Workmen have not been able to establish by

way of evidence that they were threatened to be

transferred to Jamnagar if they did not take VRS.

(ii). The Labour Court did not accept the plea of the

employees that they had orally withdrawn their

applications for Voluntary Separation.

(iii). Written applications were received from some

of the petitioners after the acceptance by the

Company and after the expiry of the validity period.

They were received on 21.3.2007 after the Scheme

had closed on 20.3.2007.

(iv). All the employees had applied for withdrawal

after having enjoyed the benefits and after being

silent for a period of three months,have objected to

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

the VSS/SSS without refunding the benefits. The

Labour Court therefore held that they had no right to

challenge their termination now.

Submissions made on behalf of the petitioners:

4. Mr. P. R. Thakkar, learned counsel appearing for the

workmen / employees made the following submissions:

4.1. The Separation Scheme was notified on the

notice board by way of a Circular which is on record before

the Labour Court at Exhs.23 and Exh.24 respectively.

4.2. Mr. Thakkar would submit that the petitioners

were compelled to opt for the scheme as had they not done

so, they would have been transferred to Jamnagar or any

other place.

4.3. Mr. Thakkar submitted that the three unions

had issued a joint Circular which was on record before the

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

Labour Court which made it evident that there was threat

from the employer and therefore applications had to be

made and accordingly, the employees made such

applications late in the evening on the last day i.e.

20.03.2007. Subsequently, when they went to withdraw the

applications at around 8-00 pm, the concerned Officer

informed them that since they were already locked in the

computer and therefore they should come next day in the

morning.

4.4. Mr. Thakkar would submit that accordingly on

21.03.2007, as is evident from applications Exh.29 before

the Labour Court, the petitioners requested that they may

be permitted to withdraw the applications. An endorsement

was made by the Management that the withdrawal can be

allowed as per Management. A back dated letter dated

20.03.2007 was issued by the Management which was

dispatched on 26.03.2007, which is evident from postal slip

and it was therefore evident that nothing but a fraud had

been committed by the Management. It was humanly

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

impossible for the Management to have accepted so many

applications on the very date i.e. 20.03.2007. Even

otherwise, the scheme was open till 20.03.2007 and no

decision could be taken on the very date accepting the

applications.

4.5. Mr. Thakkar would further submit that the

Company behind the back of the petitioners deposited the

benefits under the scheme directly to the Bank accounts of

the respective applicants / petitioners. The petitioners had

continuously protested upto June, 2007 and having had no

other alternative raised the present dispute.

4.6. Mr. Thakkar would submit that in the first round,

on the scheme being floated and the petitioners having

been denied withdrawal they had approached this Court by

filing Special Civil Application No.20727 of 2007 and allied

matters which the Court dismissed on the ground that it

involved disputed questions of facts. The petitioners

therefore approached the Assistant Labour Commissioner

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

by raising a dispute and seeking a Reference. On

11.04.2008, the Assistant Labour Commissioner refused to

refer the dispute which again made the petitioners prefer

Special Civil Application No.7102 of 2008 which was

rejected on 13.03.2009. On a challenge before the Division

Bench in Appeal, the Division Bench in LPA No.418 of 2009

directed the Labour Commissioner to refer the dispute. The

Management challenged the same before the Hon'ble

Supreme Court, the Appeal was dismissed. An application

for consolidation of References was made which was also a

subject matter of challenge till the Hon'ble Supreme Court.

On applications made by the Company that the References

must not proceed till the employees are directed to deposit

the amounts accepted the matter was carried to the

Hon'ble Supreme Court and on a consensus it was decided

that the References should proceed on merits.

4.7. Mr. Thakkar would submit that though there

was corroborative evidence on record to show that oral

request for withdrawal was made on 20.03.2007,

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

applications for withdrawal were filed on 21.03.2007 and

before there was an effective acceptance by the Company

the Labour Court did not consider the same and passed the

impugned award.

4.8. During the course of submissions, Mr. Thakkar,

learned counsel for the petitioners would refer to the paper

book supplied to the Court wherein important exhibits

produced before the Labour Court were placed for perusal

of the Court. By referring extensively to these documents,

Mr. Thakkar would submit that if it was the case of the

Officer of the Company that the applications made were

locked in the computer, the Labour Court in addition to the

defence of the employer that acceptances were done by

email, in order to support the assertions of the petitioners

of it being fraudulent, should have required the employer

to prove such document by way of completing the

formalities under the provisions of Section 65(B) of the

Evidence Act. He would submit that the Labour Court ought

to have held that the Company had never taken a decision

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

on the midnight of 20.03.2007 or had sent an email to the

units on 21.03.2007. The Email was an electronic evidence

and had to be proved in compliance of Section 65(B) of the

Evidence Act.

4.9. Mr. Thakkar reading the deposition of Mr. H. R.

Desai at Exh.94 would submit that he was a reliable

witness and could not have been discarded by the Labour

Court as being an interested witness. The witness had

clearly deposed that the petitioners had approached the

Officer for oral withdrawal in the evening on 20.3.2007 and

which was not challenged in cross examination.

4.10. Mr. Thakkar would submit that reading of

Sections 4 & 5 of the Indian Contract Act, 1872 would make

it evident that the scheme remained in operation upto

20.03.2007, therefore, the occasion to decide the

application was available with the Management only from

21.03.2007. The operation of the Scheme continued and

letters were dispatched only on 26.03.2007 and, therefore,

the offers made by the petitioners were withdrawn before

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

it was accepted on 26.03.2007. He would submit that

Section 4 of the Act would indicate that the communication

of an acceptance is complete as against the proposal when

it is put in a course of transmission to him so as to be out

of the power of the acceptance which was on 26.03.2007

and therefore, there was no concluded contract inasmuch

as, the withdrawal was much before such acceptance.

4.11. Mr. Thakkar would also submit that even if the

Scheme is read it is evident that the orders of relieving

were to be made only in April, 2007, therefore, the

employer-employee relationship continued till such date

and admittedly, before such severance, the applications

were withdrawn. During the course of his submissions, Mr.

Thakkar would rely upon the Circular of VSS, the deposition

of the workmen namely; Punambhai Vaghela, the Circular

dated 20.03.2007 the RPAD slips dated 26.03.2007,

deposition of witness Hareshbhai Desai at Exh.94 etc. in

support of his submissions to assail the awards of the

Labour Court.

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

4.12. Mr. Thakkar would rely on the following

decisions on the topic wise submissions made by him:

(A) On the aspect of withdrawal of VRS application

before the date of acceptance and before the date of

passing consideration, Mr. Thakkar would rely on

the following decisions:

(1) Food Corporation of India v. Ramesh Kumar reported in AIR 2007 SC 2864.

(2) National Textile Corporation (MP) Limited v. M.R. Jadav reported in AIR 2008 SC 2449

(3) Bank of India and others v. O.P. Swarankar reported in AIR 2003 SC 858

(4) Indian Oversead Bank v. Ratan Singh reported in AIR 2018 SC (SUP) 561

(5) Madhya Pradesh State Road Transport Corporation v. Manoj Kumar reported in 2016(9) SCC 375 &

(6) M.D. Orissa S.H.W. Co.Op. So. Ltd. v. Satyanarayn Pattnaik reported in 2014(3) SCC 218.

(B) On the issue of withdrawal of VRS applications

before the date of acceptance and the before the

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

date of release from service, Mr. Thakkar would rely

on the following decisions:

(1) Poonam Garg v. IFCI Venture Capital Funds Limited, decision of Delhi High Court dated 27.9.2019 passed in C.M. No.38360/2019 and W.P. (C) No.9304/2019

(2) Sambhu Morari Sinha v. Project and Development India Limited reported in 2003(2) SCC

(3) Sambhu Morari Sinha v. Project and Development India Limited reported in 2000(5) SCC

(4) N.A. Vasava v. Chief Refinery Co-Ordinator IOC reproted in 1997(3) GLR 2397 &

(5) P. Kasilingam v. PSG College of Technology reported in AIR 1981 SC 789.

(C) On the question of withdrawal of Voluntary

Retirement before date of acceptance, he would rely

on the following decisions:

(1) Union of India and other v. Wing Commander T.

Parth Sarthi reported in 2001(1) SCC 158

(2) J.N. Srivastava v. Union of India reported in AIR 1999 SC 1571 &

(3) Balram Gupta v. Union of India reported in AIR

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

1987 SC 2354.

(D) On the aspect of premature acceptance of

Voluntary Retirement, he would rely on the following

decisions:

(1) KLE Society v. Dr. R.R. Patel and others reported in 2002(5) SCC 278

(2) Jayantkumar Atmaram Bhatt v. Gujarat State Road Transport Corporation reported in 1998(2) GLR 1001 &

(3) Tekchand v. Dileram reported in 2001(3) SCC

290.

(E) In support of his submission that the decision

of the authority becomes effective only, when the

employee is relieved from duty, he would rely on the

following decisions:

(1) Power Finance Corporation Limited v. Pramod Kumar Bhatia reported in 1997(4) SCC 280

(2) State of Punjab v. Khemiram reported in AIR 1970 SC 214

(3) State of Pujab v. Amarsingh reported in AIR 1966 SC 1313 &

(4) National Textile Corporation (MP) v. M.R. Jadav

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

reported in AIR 2008 SC, 2449.

(F) On the admissibility of electronic evidence of

Sec. 65(B) of the Act, Mr. Thakkar would rely on the

following decisions:

(1) Arjun Panditrao Khotkar v. Kailash Kushanrao Gorantyal reported in 2020(0) AIJEL SC 66369 = 2020(7) SCC, 1 &

(2) Anvar P.V. v. P.K. Basheer and others - Judgment delivered by Hon'ble Supreme Court in Civil Appeal No.4226 / 2012 dated 18.9.2004.

(G) On the aspect of validity of Reference u/s.10 of

the ID Act, Mr. Thakkar would rely on the following

decision:

Raijibhai Bhikhabhai Parmar v. IPCL - Now known as Reliance Industries Limited, a judgment of Gujarat High Court decided on 29.1.2016 in SCA No.5491/2014 and allied matters.

(H) On the aspect of documentary evidence to

prevail over oral evidence, he would rely on the

following decision:

Nek Ram v. Union of India of Punjab and Haryana High Court in RSA No.2773/2008 dated 10.03.2009.

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

(I) On the aspect of the burden on the employer to

prove by way of evidence, Mr. Thakkar would rely on

the following decision:

Bhuvesh Kumar Dwivedi v. Hindalco Industries Limited reported in 2014 (0) GLHEL - SC 55379

Submissions made on behalf the Respondent Company:

5. Mr. K. S. Nanavati, learned Senior Advocate assisted by Mr.

Pratik Bhatia, learned advocate for the respondents would make

the following submissions:

5.1. Mr. Nanavati, learned Senior Counsel would

submit that it is well settled that this Court would not sit in

appeal over the award of the Labour Court, even if, two

views are possible.

5.2. Mr. Nanavati would submit that the petitioners

had never challenged the validity of the scheme and after

having taken the benefits of the scheme it is not open for

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

them to turn around and challenge the same.

5.3. Mr. Nanavati would submit that only two

contentions were raised before the Labour Court. It was the

case of the petitioners that they were under compulsion

forced to accept the scheme and that they had withdrawn

the application before it was accepted. He would submit

that on both these counts, the Labour Court had refused to

entertain their Claim.

5.4. Mr. Nanavati would submit that the Company

had paid total compensation of approximately Rs.78 crores

to the 464 employees who were part of the dispute under

the VSS / SSS scheme. In addition Rs.20 crores were paid

towards retiral dues.

5.5. Mr. Nanavati would submit further that there

were two schemes,namely, Voluntary Separation Scheme

and Special Separation Scheme. The contention of the

petitioners that they were pressurized to accept the

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

scheme has rightly not been believed by the Labour Court.

The stand of the petitioners that they had approached the

office late evening on 20.3.2007 and they were told to go

back and come on the next day is also not supported by

any evidence. He would submit that the competent

authority had communicated on 21.3.2007 to accept the

decision and a Circular was issued and it was specifically

stated therein that those who had not collected their

acceptance letters should do so. About 110 employees who

had not collected the acceptance letters were sent the

same by RPAD on 26.3.2007. What has also come on

record is that none of the employees had protested and it

was only after June 2007, especially as is evident from a

letter dated 29.9.2007 (Exh.80) that an objection to the

acceptance of VSS was made. This was done after having

accepted the additional amount of compensation. The

withdrawal applications and the stand taken in June, 2007

was clearly an after thought.

5.6. Mr. Nanavati would further submit that the

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

Labour Court rightly held that it cannot be accepted that

the petitioners had applied under the VSS under coercion,

threat of compulsion. In fact, it had come on record

through the evidence of Shri Patel that those employees

who had not accepted the VSS were not transferred. The

Labour Court rightly held that once having accepted the

amount it is not open for them to withdraw from the

Scheme. The scheme documents clearly mention that the

operative period of the VSS / SSS scheme is from

06.03.2007 to 20.03.2007 which implies that the

acceptance / withdrawal from the scheme has to take place

during the operative period. This is supported by the fact

that 19 employees who had applied for VSS / SSS and

subsequently submitted withdrawal applications before

20.03.2007 were allowed to withdraw.

5.7. Mr. Nanavati would draw the attention of the

Court to the evidence of the employee Punam Vaghela and

also to that of Haresh Desai and correlated the same to the

findings arrived at by the Labour Court which indicate that

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

the evidence of Punambhai clearly indicated that

admittedly, there was no coercion and that Hareshbhai was

treated as interested witness because he had specifically

stated that he had sympathy for the workmen.

5.8. Mr. Nanavati would submit that the legal

position is very clear that the application for VRS can be

withdrawn only before it is accepted. Provisions of Sections

4 and 5 of the Contract Act are clear that once the

employer accepts the application under VRS it is final

against the person who has submitted it. He would submit

that once the petitioners had accepted the benefits under

the Scheme they were estopped from challenging the same

and therefore the Labour Court did not commit any error in

rejecting the stand of the petitioners and holding in favour

of the Company.

5.9. Mr. Nanavati would take the Court through the

VRS scheme which is at Exhs.23 and 24 of the award of the

Labour Court and read the relevant Clauses of the Scheme.

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

5.10. Mr. Nanavati would submit that under the

Scheme the Company is still paying premium for medical

insurance which was part of the package and therefore

having accepted the scheme and the benefits thereunder

which is established by the evidence of the Company

including that of the witness Shri R. A. Patel. No

interference is called for in the award of the Labour Court.

5.11. In support of his submissions, Mr. Nanavati

would rely upon the following decisions:

(1) Shalini Shyam Shetty and Anr v. Rajemdra Shankar Patil reported in 2010(8) SCC 329

(2) K.V.S. Ram v. Bangalore Metropolitan Transport Corporation reported in 2015(12) SCC 39

(3) Punjab National Bank v. Virender Kumar Goel and others reported in 2004(2) SCC 193

(4) New India Assurance Co. Ltd. v. Raghuvir Singh Narang and others reported in 2010(5) SCC 335

(5) North Zone Cultural Centre and Another v.

Vedpathi Dineshkumar reported in 2003(5) SCC 455

(6) Modern School v. Shashipal Sharma and others

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

reported in 2007(8) SCC 540

(7) Air India Express Limited and others v. Captain Gurudarshan Kaur Sandhu reported in 2019(17) SCC

(8) Rajesh Kumar Balak Ram Chandrakar v. Information and Library Network Centre (Inflibnet) decided on 10.06.2022 passed in SCA No.2720 of 2013 of Gujarat High Court &

(9) Raj Kumar v. Union of India reported in AIR 1969 SC 180.

ANALYSIS:

Before getting into the assessment and analyzing the

Labour Court Award, the relevant dates that need to be kept in

mind are are as under:

Dates And Events:

06.03.2007:

The Respondent Company i.e. IPCL now known as Reliance

Industries Ltd. issued Voluntary Separation Scheme / Special

Separation Scheme for its regular Supervisory and non-

Supervisory employees.

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

The Scheme was to remain in force from 06.03.2007 to

20.03.2007. (Clause 6).

15.03.2007:

Respondent issued a Circular stating that the Scheme

being Voluntary, no coercion is intended and any such instances

may be brought to the notice of the Whole Time Director.

20.03.2007:

Respondent Company issued Office Order wherein, it

accepted the Application for VSS/SSS Scheme.

The employees who had opted for the VSS/SSS Scheme

were asked to collect their Office Orders accepting their

application.

21.03.2007:

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

Respondent issued a Circular on its Notice Board stating

that Applications for VSS / SSS Scheme have been accepted by

the Competent Authority and all optees are requested to collect

letter of acceptance from concerned Field Personnel Unit.

21.03.2007:

Respondent Company wrote an email to its Heads of

various Departments attaching the above-mentioned Circular.

21.03.2007:

After the period of VSS/SSS Scheme came to an end and

after acceptance of the application for VSS/SSS, 110 petitioners

submitted written application for withdrawal of VSS/SSS.

26.03.2007:

Around 99 petitioners out of 449 petitioners did not collect

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

the Office Orders dated 20.03.2007 in person, the Respondent

Company was constrained to send the same through Registered

Post A.D.

26.03.2007:

The Respondent Company issued a Circular wherein it

stated that relief under Section 89 of Income Tax Act can be

claimed by filing of Form 10E and relevant supporting documents

under Compensation received under VSS/SSS Scheme during the

Financial Year 2007-2008.

29.03.2007:

Certain petitioners filed Applications for claiming relief in

terms of the above-mentioned Circular.

It is pertinent to note that in the said Application, the

employees have accepted that the VRS has been accepted by

the Company.

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

03.04.2007:

Majority of the petitioners came to be relieved from

services by the Respondent Company.

.04.2007:

One of the petitioners i.e. Gohil Himmatbhai Bhagvansinh

filed application for claiming gratuity and submitted the same to

the Respondent Company.

.08.2011:

The petitioners - workmen filed their Statement of Claim in

respective References for declaring the action of Respondent

Company of giving retirement from service as illegal and for

appropriate directions to the Respondent Company to reinstate

the petitioners - workmen with back-wages and all consequential

benefits.

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

19.10.2013:

The Respondent Company filed its Written Statement in the

various References denying the contents of the Statement of

Claim stating that applications for VSS had been submitted by

employees on their own will without any duress, coercion or

compulsion and that the Respondent Workmen had submitted

their application for withdrawal after the resignation came to be

accepted and have taken and enjoyed the benefits of the

Scheme and therefore, the References required to be rejected.

2016:

The petitioner - Punambhai Waghela filed his examination-

in-chief.

13.10.2016:

The petitioner was cross-examined by the Respondent

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

Company.

03.10.2019:

The petitioner submitted the Written Submissions before

the learned Labour Court.

The Respondent Company filed Legal Submissions before

the learned Labour Court. (The same is annexed as Annexure-I to

this Submissions)

21.03.2020:

The learned Presiding Officer, Labour Court-1, passed the

impugned award in the References whereby it rejected and

dismissed the Reference filed by the petitioner - workman on the

ground that:

1. Allegation of the petitioner that he was

threatened to be transferred to Jamnagar is

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

erroneous as he had not made any complaint before

Union Police, Labour Commissioner or any other

authority and also the petitioner has nor produced

any evidence to this effect and also the petitioner has

not mentioned this fact of his transfer to Jamnagar in

his withdrawal application under Exhibit-29.

2. The learned Labour Court also held that the

petitioner had submitted his withdrawal application

for VSS Scheme after the expiry of time period of VSS

Scheme and after his application for VSS was already

accepted. Thus his withdrawal application was not

accepted.

3. It was also held that it is clear from the conduct

of the petitioner that he had not refunded the amount

of retirement benefits under VSS Scheme and same

had been deposited in his bank account in first week

of April, 2007 and he has not stopped claiming

medical benefits and other benefits.

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

4. It was further held that the petitioner had raised

his objection after period of 3 months from the date

of receiving retirement benefits under VSS Scheme

and he had accepted those retirement benefits under

VSS Scheme and hence he was not entitled to

withdraw his application for Voluntary Separation

Scheme.

6. Considering the submissions made by the

learned advocates for the respective parties, the

reasonings of the Labour Court and the facts on hand need

to be briefly set out.

6.1. Perusing the Statement of Claim and the reply

thereof the Labour Court has found that there was no

dispute or a challenge by the workmen to the scheme. The

Labour Court therefore could not and did not to go into the

same.

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

6.2. On the issue of the petitioners' contention that

they were compelled to accept the scheme, the Labour

Court assessed the evidence.

6.3. While assessing the evidence of Punambhai

Vaghela, the employee at Exh.13 the Labour Court found

that it was on the lines as set out in the Statement of

Claim. The scheme was in operation from 06.03.2007 to

20.03.2007. The witness had stated that there was no

withdrawal clause in the scheme. It was his case that had

they not accepted it, they would have been transferred.

Moreover, when they went to withdraw orally on

20.03.2007, they were told it was locked in the computer.

They therefore tendered the written request on the next

date i.e. on 21.03.2007. The letter of 20.03.2007 was

concocted and back dated as it was posted on 26.03.2007.

In the cross examination of this claimant, it had come on

record that he was shown the Circular Exh.65 dated

21.03.2007. He had admitted that the workmen had

withdrawn the amount of PF and gratuity and also accepted

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

the additional amount of Rs.1,50,000/-. The conduct of the

petitioners having accepted the VSS/SSS by submitting

individual applications followed by filling up the withdrawal

forms for PF, Gratuity, Pension etc. and also submitting the

Section 10E for availing Income Tax Relief established the

unconditional consent. The workmen had admitted that

they had worked upto 03.04.2007 and it was only in June,

2007, a registered letter was written objecting to the

acceptance of Voluntary Retirement. No letter was written

between 21.03.2007 and June, 2007. He had admitted in

his evidence that those employees who had not accepted

the benefits of the scheme were not transferred and that

19 employees had accepted VRS as their applications for

withdrawal were before 20.03.2007.

6.4. The Labour Court further found from the

evidence of one Shri Haresh Ramanlal Desai at Exh.94 that

he had stated that workmen came at around 8.30 pm on

20.03.2007 asking for withdrawing their VSS. The Labour

Court on assessment of evidence of this witness

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

Hareshbhai found that he had a long pending dispute with

the Company and it was out of interest and sympathy that

he was giving his evidence. This led the Labour Court to

discard the evidence of this witness on the ground that he

could be termed as an interested witness.

6.5. On behalf of the employer, one Ramesh A. Patel

was examined at Exh.109 who in his cross examination

stated that he had discouraged the employees from taking

VRS. Based on the documentary evidence at Exhs.75 and

29 together with evidence Exh.31/137 and Exh.31/138 the

Labour Court found that it was only on 14.06.2007 that the

workmen had written letters for withdrawing from the

scheme and a letter of 29.09.2007 was written to the

General Manager (Finance). That letter was at Exh.82.

There was inherent contradiction in the evidence of the

workman Punambhai Vaghela, when at the first instance he

had stated that it was Shri R. A. Patel who went around

with a transfer list threatening transfer. Whereas, in the

cross examination, he had stated that one Mr. Anand had

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

threatened the Union. It has also come on record that those

who did not apply for VRS were never transferred to

Jamnagar. It was in light of this set of evidences that the

Labour Court did not believe the case of the petitioners

that there was coercion on part of the Management to

accept VSS.

Moreover, the VSS/SSS applicants had accepted full

benefits available to them under the Scheme which was in

the range of Rs.15 to 16 lacs plus retiral benefits and

having not refunded the same and also having continued to

avail the benefits of medical insurance scheme and also

their nominees having accepted the benefits which had

come out in the cross-examination of the witness it was

rightly held by the Labour Court that there was no coercion

on the employees to accept the VRS/VSS and the stand of

the petitioners was rightly rejected.

6.6. Coming to the argument and the stand of the

petitioners that they had withdrawn their applications for

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

Voluntary Retirement before it was accepted, the Labour

Court, based on the documents and the question of law set

out by the Hon'ble Supreme Court, came to the conclusion

that there was no withdrawal before the closure of the

scheme. Once the scheme had closed on 20.03.2007 and

there was no evidence to suggest a written request of

withdrawal before it was accepted. Once the acceptance

was communicated before it was withdrawn the contract

was complete.

During the course of submissions it was argued that

looking to the number of applications made on 20.3.2007 it

was not possible for the Company to pass Office Orders

accepting the Applications the very same day it was the

stand of the Company and evidence was accepted by the

Labour Court that applications were handled through

computerized system and all the employees were required

to submit their applications to the concerned field

personnel units who were required to feed the data in the

computer system. It has been established during evidence

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

that the process of acceptance of VRS/VSS/SSS Application

was through online system which was connected through

multiple computers having a provision to complete the

process expeditiously.

6.7. The Labour Court reproduced the Circular at

Exh.57 and the application made by the petitioners to opt

for VRS and found that the period of the operation of the

Scheme was from 06.03.2007 to 20.03.2007. To the letters

written by the employees on 21.03.2007 (Exh.29), and the

communication dated 20.03.2007 sent by the

Management, which according to the workmen were back

dated and in fact dispatched on 26.03.2007, the Labour

Court found that the workmen had never stated in their

applications on 21.03.2007 that they had orally requested

for withdrawal on 20.03.2007. Moreover, the Labour Court

found, reading the scheme Circular that there was no

clause permitting oral withdrawal and the story of the

workmen that they had requested for oral withdrawal was

not believed. Considering Exh.75 where applications were

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

made for withdrawal of VRS and the Circular dated

21.03.2007 at Exh.60, the Labour Court found that the

applications for withdrawal was made after the scheme had

closed. Also it has come on record at Exh.63 that 19

employees who had made applications for withdrawal

before the validity of the scheme closed on 20.03.2007

were continued in service.

6.8. It has come on record that the petitioners were

relieved in April, 2007 and had accepted the amount of

gratuity and PF. The reminders to their withdrawal letter

dated 21.03.2007 was only written by mark 29/24 in June,

2007.

6.9. The Labour Court further found that the letter

therefore written three months after they having been

relieved and, therefore, in light of the decisions of the

Hon'ble Supreme Court the Labour Court opined that in

light of a clear assertion by the workmen in his letter dated

29.09.2007 at Exh.80 to object to the VRS scheme it was

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

rightly held by the Labour Court that it was an after

thought to say that the amounts were accepted with

objection.

7. The VRS scheme which was the subject matter

of dispute is on record before the Labour Court at Exh.24.

The period of operation of the scheme was that it was to

remain open upto 20.03.2007. The date of relieving was to

be at the discretion of the Management but the likely date

of relieving was to be of 01.04.2007. The Management had

a right to reject the request of the employee without

assigning any reason. The optees were to have a

mediclaim policy, insurance coverage of which has the

responsibility of Management. Exh.29 is a letter dated

21.04.2007 of 5-00 pm written by one of the employees

stating that he would like to withdraw the application. Such

applications of all employees are at Exh.29 which would

indicate that the withdrawal was sought on the ground that

it was necessary to maintain the family and therefore it

was requested that they be permitted to withdraw their

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

applications for Voluntary Separation. 20.03.2007 an Office

Order was passed accepting their applications. It was not

their case even in the applications so made that such

applications for VSS were made under coercion.

8. On 21.03.2007, a Circular was put on the notice

board by the Company informing of the acceptance of VRS

applications tendered by the employees. The Labour Court

has referred to that Circular. The same is also on record. It

is specifically pointed out that the Circular at Exh.61 was

displayed on the notice board and it stated that all the

optees are requested to collect the letter of acceptance

from concerned field personnel unit. At Exh.63 is a list of 19

employees who, on withdrawal of their VSS applications,

were permitted to continue in service. On 24.03.2007,

another Circular was issued by the employer informing the

applicants that pursuant to the Circular dated 21.03.2007,

some employees have not collected their acceptance letter

which must be collected. Exh.67 is a communication

informing the retirees with regard to filing of Form 10(E)

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

under the Income Tax Act.

9. The Labour Court in its award has reproduced

the format of the application made by the petitioners which

indicate that the application was made free from coercion

and signed by two witnesses.

10. Reading of the evidence of Punambhai Vaghela

at Exh.13 and that of Hareshbhai Desai at Exh.94 which

has been done by the Labour Court indicates that it was

only after the Scheme had closed that applications for

withdrawal were made. There is no evidence to support the

claim of the workmen that they had orally requested for

withdrawal. In fact, it has come on record from the cross

examination of Punambhai that upto 20.06.2007 that is

three months after the acceptance of VRS and after being

relieved, no written communication was made by the

petitioners with the Company on the aspect of accepting

VRS and objecting to it. Admittedly, all the moneys were

paid. The amounts were received in April, 2007 and it was

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

only three months thereafter the petitioner had sought to

object to the Scheme. In light of this set of evidences on

record and the position of law that, the Labour Court came

to the conclusion that having once accepted the amounts

from the employer, it was not open for the employees to

challenge the scheme and contend that once having

withdrawn they should be permitted to be continued in

service.

11. The decisions cited by learned counsel Mr.

Thakkar for the petitioners with regard to the withdrawal of

VRS before its acceptance and before it having become

effective, especially, in the case of National Textile

Corporation (MP) Ltd. v. M.R. Jadav reported in AIR

2003 SC 858 and Madhya Pradesh State Road

Transport Corporation v. Manoj Kumar reported in

2016(9) SCC 375, these decisions were considered in

Manoj Kumar (Supra), wherein, the Hon'ble Supreme

Court opined that if the contractual scheme gives the

option to an employee to voluntarily retire in terms of the

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

scheme and if there is no condition that it will be effective

only on acceptance of the employer, the scheme gives an

enforceable right to the employee to retire by exercising

his option in such a situation a provision in the contractual

scheme that the employee will not be entitled to withdraw

the option once made will be valid and binding and

consequently an employee will not be entitled to withdraw

from the option exercise.

12. Even in the case of Raghuvir Singh Narang

(Supra), paragraph No.10 of the decision reads as under:

"10. It is true that the principles of Contract Law relating to offer and acceptance enables the person making the offer to withdraw the offer any time before its acceptance; and that any subsequent acceptance of the offer by the offeree, after such withdrawal, will not result in a binding contract. Where the voluntary retirement is governed by a contractual scheme, as contrasted from a statutory scheme, the said principle of Contract will apply and consequently the letter of voluntary retirement will be considered as an offer by the employee and therefore any time before its acceptance, the employee could withdraw the offer. But the said general principle of Contract will be inapplicable where the voluntary retirement is under a statutory scheme which categorically bars the employee, from withdrawing the option once exercised. The terms of the

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

statutory scheme will prevail over the general principles of contract. This distinction has been recognized by a series of decisions of this Court. We may refer to a few of them."

13. In the decision in the case of Vedpathi

Dineshkumar (Supra), considering the question of the

effective date, the Hon'ble Supreme Court held that non

communication of acceptance does not make the

resignation inoperative provided there is in fact an

acceptance before withdrawal. Paragraph Nos.10 to 23

reads as under:

"10. It is true as contended by Shri D.S. Bali, learned senior counsel that if actually the appellant had accepted the resignation only on 1.12.1988 then in view of the fact that the respondent had in between withdrawn his resignation, the resignation would not become effective and such withdrawn resignation cannot be accepted subsequently.

11. The question, therefore, for our consideration is whether the resignation of the respondent was accepted by the appellant on 18.11.1988 or not.

12. The respondent had denied this factum of the acceptance of resignation on 18.11.1988. In the writ petition filed by the respondent, he had stated that the resignation was accepted only on 1.12.1988.

13. But the appellant in their reply to the said allegation of the respondent in the writ petition, filed

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

a counter affidavit specifically denying the allegation of the writ petitioner/respondent herein and had contended that the resignation was accepted on 18.11.1988 itself giving certain particulars of the said fact. The appellant herein in the said writ petition also filed two affidavits of the officials of the organization in support of its stand that the resignation in question was actually accepted on 18.11.1988 itself.

14. No rejoinder was filed as against said reply nor the contents of the affidavits denied. Further from a perusal of the judgment of the learned Single Judge, it is seen that he also accepted the statement in the affidavit of the Director of the appellant Organization that the resignation was accepted on 18.11.1988 but he held that because said acceptance was communicated only on 1.12.1988, and in the meanwhile the respondent had withdrawn the resignation the subsequent communication of acceptance had become redundant. He further held that permitting the respondent to attend duty till 1.12.1988 also showed that the resignation had not taken effect thus the learned Single Judge gave two reasons for holding that the resignation had not become effective.

(i) The acceptance was not communicated till the withdrawal.

(ii) Respondent was permitted to attend duty even after the acceptance of resignation.

15. In our opinion, both these grounds are unsustainable in law. This Court in Raj Kumar's case (supra) held:

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

"When a public servant has invited by his letter of resignation the determination of his employment, his service normally stands terminated from the date on which the letter of resignation is accepted by the appropriate authority and, in the absence of any law or statutory rule governing the conditions of his service, to the contrary, it will not be open to the public servant to withdraw his resignation after it is accepted by the appropriate authority. Undue delay, in intimating to the public servant concerned the action taken on the letter of resignation, may justify an inference that the resignation had not been accepted."

16. Therefore, it is clear that non-communication of the acceptance does not make the resignation inoperative provided there is in fact an acceptance before the withdrawal.

17. We will consider the effect of delayed communication of the acceptance of resignation separately hereinafter.

18. It is an admitted fact that so far as the appellant - Organization is concerned, there is no rule which requires the acceptance of the resignation to be communicated before the resignation could become effective. But the Division Bench in appeal has relied upon a consolidated guidelines and instructions issued by the Government of India vide letter of February 11, 1988 dealing with the subject of acceptance and withdrawal of resignation. We see that these guidelines state that in the case of a resignation which has been accepted by the appointing authority with effect from a future date and if in the meantime the concerned Government servant withdraws his resignation before he is

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

actually relieved of his duties, the normal principle should be to allow the request of the Government servant to withdraw the resignation. In these guidelines, we do not see any requirement which states that even in cases where the resignation is accepted with immediate effect, the same can be withdrawn before such acceptance is communicated to the Government servant concerned. On the contrary, in our opinion, these guidelines also indicate that the resignation takes effect the moment the same is accepted.

19. The courts below then relied upon a judgment of this Court in the case of Ravinder Singh (supra) where a Division Bench of two-Judges of this Court in a very short order based on the facts of that case held that the resignation of an officer in question was obtained by threat and coercion, therefore, that was an appropriate case where the appellant should continue in service. It is on that factual basis acceptance of resignation was quashed. However, there is a stray observation that "obviously to get over the situation, he might have tendered resignation on January 3, 1991 but he had withdrawn it on February 2, 1991 before the acceptance was communicated to him. (emphasis supplied). On the same day, the resignation was accepted." From this observation, we cannot hold that the ratio disendi of that decision is that the resignation does not become effective until the acceptance is communicated. Assuming that this Court in Ravinder Singh's case has held so then the same would run directly counter to the ratio laid down by this Court in the three-Judge Bench judgment in Raj Kumar's case (supra), hence, we think the High Court was wrong in placing reliance on the judgment of Ravinder Singh's case (Supra) which was done without considering the case of Raj Kumar (supra).

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

20. This takes us to consider the observations of this Court in the case of Raj Kumar wherein this Court stated:-

"Undue delay in intimating to the public servant concerned, the action taken on the letter of resignation, may justify an inference that the resignation has not been accepted".

21. It is to seen that this observation was made in the context of finding out whether there was an acceptance at all.

22. Be that as it may, in that case, the resignation in question was dated 30th August, 1964 and the same was accepted on 31st of October, 1964 after a gap of nearly two months even then this Court thought on the facts of that case there was no undue delay in accepting the resignation so as to vitiate the same. On the contrary, this is what the court observed in the said case of Raj Kumar that:

"In the present case the resignation was accepted within a short time after it was received by the Government of India. Apparently the state of Rajasthan did not immediately implement the order and relieve the appellant of his duties, but the appellant cannot profit by the delay in intimating acceptance or in relieving him of his duties".

23. As noticed above, in the present case the resignation is dated 18.11.1988 and the same as found by us is accepted on 18.11.1988 itself. The communication was on 1.12.1988 about 13 days thereafter which delay, in our opinion, is not an

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

undue delay so as to make us draw an inference that there has been no acceptance of the resignation. Even the fact that in the meantime the respondent either attended duty or signed the attendant register will be of no assistance to claim his resignation had not taken effect. Even otherwise the appellant shave urged that because there was no responsible officer in the headquarter from 18.12.1988 after respondent's resignation was accepted till 1.12.1988 and the respondent took advantage of the same and marked his attendance and such attendance cannot be treated as lawful attendance in view of the acceptance of his resignation on 18.11.1988. We agree with this contention of the appellant."

14. In the case of Air India Express Ltd. (Supra)

considering various decisions on the question, the Hon'ble

Supreme Court held as under:

"11. The circumstances under which an employee can withdraw the resignation tendered by him and what are the limitations to the exercise of such right, have been dealt by this Court in a number of decisions.

11.2 In Raj Kumar v. Union of India7, an officer belonging to the Indian Administrative Service tendered resignation and addressed a letter to the Chief Secretary to the Government of Rajasthan on 30.08.1964 that it may be forwarded to the Government of India with remarks of the State Government. The State Government recommended that the resignation be accepted and on 31.10.1964 the Government of India requested the Chief Secretary to the State Government "to intimate the

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

date on which the appellant was relieved of his duties so that a formal notification could be issued in that behalf". Before the date could be intimated and formal notification could be issued, the officer withdrew his resignation by letter dated 27.11.1964. On 29.03.1965 an order accepting his resignation was issued. The challenge raised by the officer was rejected and the High Court held that the resignation became effective on the date the 7 (1968) 3 SCR 857 Civil Appeal No. 6567 of 2019 @ SLP (Civil) No.28182 of 2018 Air India Express Ltd. and Others Vs. Capt. Gurdarshan Kaur Sandhu Government of India had accepted it. While dismissing the appeal, a Bench of three Judges of this Court observed:-

"The letters written by the appellant on August 21, 1964, and August 30, 1964, did not indicate that the resignation was not to become effective until acceptances thereof was intimated to the appellant. The appellant informed the authorities of the State of Rajasthan that his resignation may be forwarded for early acceptance. On the plain terms of the letters, the resignation was to become effective as soon as it was accepted by the appointing authority. No rule has been framed under Article 309 of the Constitution which enacts that for an order accepting the resignation to be effective, it must be communicated to the person submitting his resignation.

Our attention was invited to a judgment of this Court in State of Punjab v. Amar Singh Harika (AIR 1966 SCR 1313) in which it was held that an order of dismissal passed by an authority and kept on its file without communicating it to the officer concerned or otherwise publishing it did not take effect as from the date on which the order was actually

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

written out by the said authority; such an order could only be effective after it was communicated to the Officer concerned or was otherwise published. The principle of that case has no application here. Termination of employment by order passed by the Government does not become effective until the order is intimated to the employee. But where a public servant has invited by his letter of resignation determination of his employment, his services normally stand terminated from the date on which the letter of resignation is accepted by the appropriate authority and in the absence of any law or rule governing the conditions of his service to the contrary, it will not be open to the public servant to withdraw his resignation after it is accepted by the appropriate authority. Till the resignation is accepted by the appropriate authority in consonance with the rules governing the acceptance, the public servant concerned has locus poenitentiae but not thereafter. Undue delay in intimating to the public servant concerned the action taken on the letter Civil Appeal No. 6567 of 2019 @ SLP (Civil) No.28182 of 2018 Air India Express Ltd. and Others Vs. Capt. Gurdarshan Kaur Sandhu of resignation may justify an inference that resignation has not been accepted. In the present case the resignation was accepted within a short time after it was received by the Government of India. Apparently the State of Rajasthan did not immediately implement the order, and relieve the appellant of his duties, but the appellant cannot profit by the delay in intimating acceptance or in relieving him of his duties."

12. It is thus well settled that normally, until the resignation becomes effective, it is open to an employee to withdraw his resignation. When would

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

the resignation become effective may depend upon the governing service regulations and/or the terms and conditions of the office/post. As stated in paragraphs 41 and 50 in Gopal Chandra Misra4, "in the absence of anything to the contrary in the provisions governing the terms and Civil Appeal No. 6567 of 2019 @ SLP (Civil) No.28182 of 2018 Air India Express Ltd. and Others Vs. Capt. Gurdarshan Kaur Sandhu conditions of the office/post" or "in the absence of a legal contractual or constitutional bar, a 'prospective resignation' can be withdrawn at any time before it becomes effective". Further, as laid down in Balram Gupta, "If, however, the administration had made arrangements acting on his resignation or letter of retirement to make other employee available for his job, that would be another matter."

15. Even in the case of New India Assurance (Supra)

the Hon'ble Supreme Court in Paragraph Nos.9, 15, 17, 18 & 24

held as under:

"9. The Special Voluntary Retirement Package was a part of the General Insurance (Rationalization of Pay Scales and Other Conditions of Service of Development Staff) Amendment Scheme 2003 framed by the Central Government in exercise of the powers in Section 17A of the General Insurance Business (Nationalization) Act 1972. The said Scheme is a delegated Legislation which is statutory in character. The validity of the said statutory scheme has been upheld by this Court (with reference to other provisions in the Scheme) in National Insurance Co. Ltd. v.

General Insurance Development Officers Association - 2008 (5) SCC 472 following

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

Kishan Prakash Sharma v. Union of India 2001 (5) SCC 212. Paragraph 5(4) of the Special Voluntary Retirement Package categorically states that a Development Officer shall not be eligible to withdraw the option once made for the Special Voluntary Retirement Package.

15. In this case the statutory scheme contains a specific provision that a Development Officer shall not be eligible to withdraw the option once made for Special Voluntary Retirement Package. In view of the said statutory provision, the general principle of contract that an offer could be withdrawn any time before its acceptance stands excluded.

17. The High Court proceeded on an erroneous assumption that the voluntary retirement package was not part of any statutory scheme, but was contractual in nature and therefore the general principles of contract will apply. The reliance placed by the High Court upon the decision of this Court in Swarnakar, to assume that every scheme for voluntary retirement is always contractual and not statutory, is misconceived.

18. A detailed reference to the decision in Swarnakar is necessary, to clear the misconception under which the High Court has proceeded. The said decision related to VRS Schemes floated by Nationalized Banks and the State Bank of India. The VRS schemes of Nationalized Banks contained a provision (Para 10.5) that it will not be open for an employee to withdraw the request made for voluntary retirement under the scheme, after having exercised such option. The scheme of State Bank of India was slightly different as it

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

permitted withdrawal of the application before a given date and also contained a provision laying down the mode and manner in which applications for voluntary retirement should be considered, which created an enforceable right in the employee if State Bank of India failed to adhere to its preferred policy. The Punjab & Haryana High Court held the VRS Scheme of the Nationalized Banks was not a valid piece of subordinate legislation. The other High Courts, on the other hand, held that the Clause 10.5 of the voluntary retirement scheme which barred an employee from withdrawing the request for voluntary retirement after having exercised the option was not operative as the employee had an indefeasible right to withdraw his offer before it was accepted. The decisions of the Punjab & Haryana High Court as also of the other High Courts were challenged by various Banks including State Bank of India and they were disposed of by the said common judgment.

24. The special voluntary retirement package is a part of the General Insurance (Rationalization of Pay Scales and Other Conditions of Service of Development Staff) Amendment Scheme, 2003, made by the Central Government in exercise of the power under Section 17A of the General Insurance Business Insurance (Nationalization) Act, 1972. Section 17A, as noticed above, authorizes and empowers the Central Government, to frame, by notification published in the official gazette, one or more schemes for regulating the pay scales and other terms and conditions of service of officers and other employees of the Corporation or of any acquiring company (including the appellant). Sub- section (6) of Section 17A provides that the provision of

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

Section 17 and of any scheme framed under it shall have effect notwithstanding anything to the contrary contained in any other law or any agreement award or other instrument for the time being in force. Therefore the scheme is statutory in character. Consequently, the provisions of the Scheme will prevail over the provisions of Contract Act or any other law or any principle of contract, and having regard to the binding nature of the scheme, the employee upon exercising the option, cannot withdraw from the same."

16. What has come on record from the facts on

hand is that the VRS scheme was open from 06.03.2007 to

20.03.2007. Nothing has come on record to show that even

oral request for withdrawal was made even before the

scheme closed. The withdrawal was made only on

21.03.2007 by which time a Circular was issued accepting

the separation. That apart, it has come on record as is

evident from reading the award of the Labour Court that

the Labour Court, considering the evidence of workmen at

Exh.13 and the documentary evidence came to the

conclusion that it was only three months after the

employee was relieved and had accepted the amount of

benefits available under the VRS, did he object to the

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

scheme and on 29.09.2007, the letter which the Labour

Court has referred to and which is at Exh.80 that more than

five months thereafter did the employee lodge his protest

to say that he had accepted the amounts subject to his

objection. This clearly was an after thought as opined by

the Labour Court and also as held by the decision of the

Hon'ble Supreme Court especially referred to by the Labour

Court in the operative portion of the awards under

challenge. That decision of the Hon'ble Supreme Court is

also a question of law which has been decided in the case

of Punjab National Bank v. Virenter Kumar Goyal and

others reported in 2004 (2) SCC 193 which held

accordingly.

17. With regard to the contention of the learned

advocate Shri P. R. Thakkar in context of compliance of

Section 65B of the Evidence Act is concerned what has

come on record that the Circular dated 21.03.2007 was

exhibited without any objection from the petitioners. Even

otherwise the strict provisions of the Indian Evidence act

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

would not apply to the proceedings under the Industrial

Disputes Act, 1947. The Supreme Court in the case of

Bareilly Electricity Supply Company Ltd. versus

Workman reported in 1971(2) SCC 617 in paragraph

No.14 has held as under:

"14. An attempt is however made by the learned Advocate for the Appellant to persuade us that as the Evidence Act does not strictly apply the calling for of the several documents particularly after the employees were given inspection and the reference to these by the witness Ghosh in his evidence should be taken as proof thereof The observations of Venkatram lyer J, in Union of India v. Varma, (1) to which our attention was invited do not justify the submission that in labour matters where issues are seriously contested and have to be established and proved the requirements relating to proof can be dispensed with. The case referred to above was dealing with an enquiry into the misconduct of the Public Servant in which he complained he was not permitted to cross-examine. It however turned out that he was allowed to put questions and that the evidence was recorded in his presence. No doubt the procedure prescribed in the Evidence Act by first requiring his chief-examination then to allow the delinquent to exercise his right to cross-examine him was not followed, but that ,the Enquiry Officer, took upon himself to cross-examine the witnesses from the very start. It was contended that this method would violate the well recognized rules of procedure. In these circumstances it was observed at page 264:

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

"Now it is no doubt true that the evidence of the Respondent and his witnesses was not taken in the mode prescribed in the Evidence Act; but that Act has no application to inquiries conducted by Tribunal even though they may be judicial in character. The law requires that such Tribunals should observe rules of natural justice in the conduct of the enquiry and if they do so their decision is not liable to be impeached on the ground that the procedure followed was not in accordance with that which obtains in a Court of Law".

But the application of principle of natural justice does not imply that what is not evidence can be acted upon. On the other hand what it means is that no materials can be relied upon to establish a contested fact which are not (1) [1958] 2 L.L.J. 259, 263-264. spoken to by persons who are competent to speak about them and are subjected to cross-examination by the party against whom they are sought to be used. When a document is produced in a Court or a Tribunal the questions that naturally arise is, is it a genuine document, what are its contents and are the statements contained therein true. When the Appellant produced the balance-sheet and profit and loss account of the Company, it does not by its mere production amount to a proof of it or of the truth of the entries therein. If these entries are challenged the Appellant must prove each of such entries by producing the books and speaking from the entries made therein. If a letter or other document is produced to establish some fact which is relevant to the enquiry the writer must be produced or his affidavit in respect thereof be filed and opportunity afforded to the opposite party who challenges this fact. This is both in accord with principles of natural justice

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

as also according to the procedure -under Order XIX Civil Procedure Code and the Evidence Act both of which incorporate these general principles. Even if all tech- nicalities of the Evidence Act are not strictly applicable except in so far as Section 11 of the Industrial Disputes Act 1947 and the rules prescribed therein permit it is inconceivable that the Tribunal can act on what is not evidence such as hearsay, nor can it justify the Tribunal in basing its award on copies of documents when the originals which are in existence are not produced and proved by one of the methods either by affidavit or by witnesses who have executed them, if they are alive and can be produced. Again if a party wants an inspection, it is incumbent on the Tribunal to give inspection in so far as that is relevant to the enquiry. The applicability of these principles are well recognized and admit of no doubt."

18. Even in the case of R.M. Yellati versus Asst.

Executive Engineer reported in (2006) 1 SCC 106 that the

provisions of the Evidence Act in terms do not apply to the

proceedings under Section 10 of the Industrial Disputes Act.

Relevant paragraph No.17 of the decision is reproduced

hereunder:

"17. Analyzing the above decisions of this court, it is clear that the provisions of the Evidence Act in terms do not apply to the proceedings under section 10 of the Industrial Disputes Act. However, applying general principles and on reading the aforestated

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

judgments, we find that this court has repeatedly taken the view that the burden of proof is on the claimant to show that he had worked for 240 days in a given year. This burden is discharged only upon the workman stepping in the witness box. This burden is discharged upon the workman adducing cogent evidence, both oral and documentary. In cases of termination of services of daily waged earner, there will be no letter of appointment or termination. There will also be no receipt or proof of payment. Thus in most cases, the workman (claimant) can only call upon the employer to produce before the court the nominal muster roll for the given period, the letter of appointment or termination, if any, the wage register, the attendance register etc. Drawing of adverse inference ultimately would depend thereafter on facts of each case. The above decisions however make it clear that mere affidavits or self-serving statements made by the claimant/workman will not suffice in the matter of discharge of the burden placed by law on the workman to prove that he had worked for 240 days in a given year. The above judgments further lay down that mere non-production of muster rolls per se without any plea of suppression by the claimant workman will not be the ground for the tribunal to draw an adverse inference against the management. Lastly, the above judgments lay down the basic principle, namely, that the High Court under Article 226 of the Constitution will not interfere with the concurrent findings of fact recorded by the labour court unless they are perverse. This exercise will depend upon facts of each case."

19. The Delhi High Court in the case of Millennium

School versus Pawan Daba reported in 2002 SCC Online

Del., 1390 in paragraph Nos.37 to 44 held as under:

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

"37. Mr Sinha had contended that the Arbitral Tribunal had erred in rejecting the evidence on the ground that requirements under Section 65-B of the Evidence Act were not satisfied.

38. The Arbitral Tribunal had rejected several e-mails (RW1/3 to RW1/63) on the ground that the requirements under Section 65-B of the Evidence Act were not complied with. The Principal of the petitioner school had issued the said certificate (Ex.RW1/64), in support of the said e-mails sent from the petitioner.

39. It is material to note that there was no objection to the certificate under Section 65-B of the Evidence Act at the time when the same was produced. It was also duly exhibited and marked as Ex. RW1/64. Notwithstanding the same, the Arbitral Tribunal held that the said certificate was inadmissible as it was defective. And, an objection to admissibility of evidence could be taken at any stage.

40. In R.V.E. Venkatachala Gounder v. Arulmigu Viswesaraswami & V.P. Temple And Anr.: (2003) 8 SCC 752, the Supreme Court held that an objection with regard to a certificate of Section 65-B of the Evidence Act is not available if it is not taken at the material time. The court had also explained the distinction regarding evidence that is inherently not admissible and a defect in the manner of proving the same. The requirement of Section 65-B of the Evidence Act relates to the mode and manner of leading evidence and if no objection as to the same is taken at the material time, it would not be open for a party to Signature Not Verified Digitally Signed Signing Date:10.05.2022 raise it at a later stage. The relevant extract of the said decision is set out below:

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

"20. ... Ordinarily, an objection to the admissibility of evidence should be taken when it is tendered and not subsequently. The objections as to admissibility of documents in evidence may be classified into two classes : (i) an objection that the document which is sought to be proved is itself inadmissible in evidence; and (ii) where the objection does not dispute the admissibility of the document in evidence but is directed towards the mode of proof alleging the same to be irregular or insufficient. In the first case, merely because a document has been marked as "an exhibit", an objection as to its admissibility is not excluded and is available to be raised even at a later stage or even in appeal or revision. In the latter case, the objection should be taken when the evidence is tendered and once the document has been admitted in evidence and marked as an exhibit, the objection that it should not have been admitted in evidence or that the mode adopted for proving the document is irregular cannot be allowed to be raised at any stage subsequent to the marking of the document as an exhibit. The later proposition is a rule of fair play. The crucial test is whether an objection, if taken at the appropriate point of time, would have enabled the party tendering the evidence to cure the defect and resort to such mode of proof as would be regular. The omission to object becomes fatal because by his failure the party entitled to object allows the party tendering the evidence to act on an assumption that the opposite party is not serious about the mode of proof. On the other hand, a prompt objection does not prejudice the party tendering the evidence, for two reasons :

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

firstly, it enables the court to apply its mind and pronounce its decision on the question of admissibility then and there; and secondly, in the event of finding of the court on the mode of proof sought to be adopted Signature Not Verified Digitally Signed Signing Date:10.05.2022 going against the party tendering the evidence, the opportunity of seeking indulgence of the court for permitting a regular mode or method of proof and thereby removing the objection raised by the opposite party, is available to the party leading the evidence. Such practice and procedure is fair to both the parties. Out of the two types of objections, referred to hereinabove, in the latter case, failure to raise a prompt and timely objection amounts to waiver of the necessity for insisting on formal proof of a document, the document itself which is sought to be proved being admissible in evidence. In the first case, acquiescence would be no bar to raising the objection in superior court."

(emphasis supplied)

41. In Sonu v. State of Haryana: (2017) 8 SCC 570, the Supreme Court referred to its earlier decisions and held as under:

"32. It is nobody's case that CDRs which are a form of electronic record are not inherently admissible in evidence. The objection is that they were marked before the trial court without a certificate as required by Section 65-B(4). It is clear from the judgments referred to supra that an objection relating to the mode or method of proof has to be raised at the time of marking of the document as an exhibit and not later. The crucial test, as affirmed by this Court, is

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

whether the defect could have been cured at the stage of marking the document. Applying this test to the present case, if an objection was taken to the CDRs being marked without a certificate, the Court could have given the prosecution an opportunity to rectify the deficiency. It is also clear from the above judgments that objections regarding admissibility of documents which are per se inadmissible can be taken even at the appellate stage. Admissibility of a document which is inherently inadmissible is an issue which can Signature Not Verified Digitally Signed Signing Date:10.05.2022 be taken up at the appellate stage because it is a fundamental issue. The mode or method of proof is procedural and objections, if not taken at the trial, cannot be permitted at the appellate stage. If the objections to the mode of proof are permitted to be taken at the appellate stage by a party, the other side does not have an opportunity of rectifying the deficiencies. The learned Senior Counsel for the State referred to statements under Section 161 CrPC, 1973 as an example of documents falling under the said category of inherently inadmissible evidence. CDRs do not fall in the said category of documents. We are satisfied that an objection that CDRs are unreliable due to violation of the procedure prescribed in Section 65-B(4) cannot be permitted to be raised at this stage as the objection relates to the mode or method of proof."

42. In Om Prakash v Central Bureau of Investigation: 2017 SCC Online Del 10249, a Coordinate Bench of this Court held as under: -

"25....Thus if a document is admissible in evidence and no objection to the mode of proof

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

is taken thereof at the stage of tendering the same in trial, the party is estopped to challenge the same before the Appellate Court or thereafter, however if the document is per-se inadmissible then even if marked as an exhibit the same cannot be read in evidence."

43. It is also relevant to note that by virtue of Section 1 of the Evidence Act, it does not apply to arbitration. Although, the principles of the Evidence Act are usually applied in arbitral proceedings, sensu stricto, the said Act is not applicable. Section 65-B of the Evidence Act is not applicable to arbitral proceedings, yet the Arbitral Tribunal has disregarded the entire evidence led by the petitioner regarding Signature Not Verified Digitally Signed Signing Date:10.05.2022 deficiency of service solely on the ground that the certificate under Section 65-B of the Evidence Act was defective.

44. It is material to note that the receipt of several communications relied upon, on behalf of the petitioner, were admitted. Notwithstanding the same, the said communications were rejected as not admissible on the ground that the certificate under Section 65-B of the Evidence Act was not furnished. In the circumstances, the decision of the Arbitral Tribunal to completely ignore the said e-mails, is manifestly erroneous."

20. Therefore, once the Labour Court has exercised the

jurisdiction judicially, the High Court can interfere with the

Award, only if it is satisfied that the award of the Labour Court is

vitiated by any fundamental flaws. Findings of the Labour Court

C/SCA/13747/2021 CAV ORDER DATED: 15/09/2022

in the present petitions do not present any such case where it

can be said that the awards of the Labour Court suffer from any

such flaws.

21. Accordingly, in light of the above discussion, all

these petitions are dismissed with no order as to costs.

22. In view of dismissal of the main matters, no orders on

connected Civil Applications.

(BIREN VAISHNAV, J) VATSAL S. KOTECHA

 
Download the LatestLaws.com Mobile App
 
 
Latestlaws Newsletter
 

Publish Your Article

 

Campus Ambassador

 

Media Partner

 

Campus Buzz

 

LatestLaws Guest Court Correspondent

LatestLaws Guest Court Correspondent Apply Now!
 

LatestLaws.com presents: Lexidem Offline Internship Program, 2026

 

LatestLaws.com presents 'Lexidem Online Internship, 2026', Apply Now!

 
 

LatestLaws Partner Event : IJJ

 

LatestLaws Partner Event : MAIMS

 
 
Latestlaws Newsletter